HomeMy WebLinkAboutEDUCATION / LIFESTYLE TRAINING CENTER - R-C SITE PLAN REVIEW - 31-96 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPROJECT TITLE: FORT COLLINS EDUCATION AND LIFE TRAINING CENTER P. 2
Proposed Roof Surface 100 year Storm Event Analysis
PROCESSED FIL-E:ELTCROOF.DAT DATE: 11-08-1995 TIME:11:30:49 VERSION-11-22-1993
FLOW TIMES AND VELOCITIES
-------------------------------
------------------------------
OVLNO FLOW OF 1ST WATERWAY
SCS TYPE FLOW OF 1ST WATERWAY
SCS TYPE FLOW OF 2NO WATERWAY
SCS TYPE FLOW OF 3RO WATERWAY
--------------------------------------
LENGTH SLOPE VELOCITY TIME
FT PERCENT FPS MINUTES
---------------------------------------
54.00 4.17 4.04 1.24
0.00 4.17 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
MAX LENGTH FOR OVERLAND FLOW WAS 300 FEET. . '
AIRPORT FORMULA WAS USED FOR OVERLAND FLOW UP TO THE MAXIMUM LENGTH.
SCS METHOD WAS USED FOR THE REST OF ORAINAGEWAY.
SCS CODES FOR VARIOUS FLOWS ARE:
1.MEADOW 2.TILLAGE 3.LAWN 4.BARE SOIL 5.GRASSED CHANNEL 6.PAVEO CHANNEL
SCS TYPE FLOW FOR 1ST WATERWAY- 4 WAS USED.
SCS TYPE FLOW FOR 2NO WATERWAY- 4 WAS USED.
SCS TYPE FLOW FOR 3RD WATERWAY- 4 WAS USED.
THE COMPUTED TIME OF CONCENTRATION OF THE BASIN - 1.23852 MINUTES
THE REGIONAL TIME OF CONCENTRATION OF THE BASIN WAS 0 MINUTES.
(REGIONAL TC=10+TOTAL LENGTH/180) MINUTES
THE TIME OF CONCENTRATION OF THE BASIN USED WAS 5 MINUTES.
RATIONAL METHOD FOR A SINGLE BASIN ANALYSIS
METRO OENVER CITIES/COUNTIES AND UO&FCO POOL FUND STUDY
USER:MERRICK Engineers 8 Architects ..........................................
PROCESSED FILE:ELTCROOF.OAT DATE: 11-08-1995 TIME:11:30:49 VERSION=I1-22-1993
PROJECT TITLE: FORT COLLINS EDUCATION AND LIFE.TRAINING CENTER P. 1
Proposed Roof Surface 100 year Storm Event Analysis
BASIN DRAINAGE DATA; BASIN SLOPE ALONG EACH FLCWLINE:
---------------------------------------------------------------------------
BASIN 1ST WATERWAY 2NO WATERWAY 3RO WATERWAY BASIN
ID FLOW GROUND FLOW GROUND FLOW GROUND AREA
NO LENGTH SLOPE LENGTH SLOPE LENGTH SLOPE
---------------------------------------------------------------------------
1002 54.00 4.17 0.00 0.00 0.00 0.00 0.03
BASIN LANOUSES AND THEIR IMPERVIOUSNESS:
---------------------------------------------------------------------------
BASIN" LANOUSES AND THEIR IMPERVIOUNESS z
ID 1ST 1ST 2NO 2NO 3RO 3RO WT'0
NO IMP AREA IMP AREA IMP AREA IMP
x z x z z x x
----------------------------
1002 0.95 100.00 0.95 0.00 0.95. 0.00 0.95
NOTE: LENGTH IN FEET; AREA IN ACRES; SLOPES IN z
DESIGN RAINFALL STATISTICS
DESIGN RETURN PERIOD (YEARS) - 100.00
RAINFALL INTENSITY -DURATION FORMULA IS GIVEN AS:
I(IN/HR)-CONSTI'H1/(T+CONST2)-CONST3
ONE -HOUR DEPTH (INCHES)- 2.60
CONST 1 - 28.5
CONST 2 - 10
CONST 3 - .786
BASIN RUNOFF COEFFICIENT AND PEAK RUNOFF
THE TIME OF CONCENTRATION OF THE BASIN USED WAS 5 MINUTES.
BASIN WEIGHTED RUNOFF COEF . 1.00
COEF FOR A 5-YR EVENT C5 . 0.95
URBANIZATION INDICATOR (RUNOFF COEF) - 0.30
DESIGN RAINFALL INTENSITY (INCHIMR) . 8.82
DESIGN PEAK RUNOFF (CFS) - 0,26
PROJECT TITLE: FORT COLLINS EDUCATION AND LIFE TRAINING CENTER
Proposed Roof Surface 2 year Storm Event Analysis
P. 2
PROCESSEED FILE: ELTCROOF.OAT DATE: 11-08-1995 TIME:11:32:39 VERSION=11-22-1993
FLOW TIMES AND VELOCITIES
-------------------------
-----------------------------
OVLNO FLOW OF 1ST WATERWAY
SCS TYPE FLOW OF 1ST WATERWAY
SCS TYPE FLOW OF 2NO WATERWAY
SCS TYPE FLOW OF 3RO WATERWAY
--------------------------------------
LENGTH
SLOPE
VELOCITY
TIME
FT
--------------------------------------
PERCENT
FPS
MINUTES
54.00
4.17
4.04
1.24
0.00
4.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MAX LENGTH FOR OVERLAND FLOW WAS 300 FEET.
AIRPORT FORMULA WAS USED FOR OVERLAND FLOW UP TO THE MAXIMUM LENGTH.
SCS METHOD WAS USED FOR THE REST OF DRAINAG&AY.
SCS CODES FOR VARIOUS FLOWS ARE:
I.MEADOW 2.TILLAGE 3.LAWN 4.BARE SOIL S.GRASSc0 CHANNEL 6.PAVEO CHANNEL
SCS TYPE FLOW FOR 1ST WATERWAY- '4 WAS USED.
.SCS TYPE FLOW FOR 2NO WATERWAY- 4 WAS USED.
SCS TYPE FLOW FOR 3RO WATERWAY- 4 WAS USED.
THE COMPUTED TIME OF CONCENTRATION OF THE BASIN = 1.23852 MINUTES
THE REGIONAL TIME OF CONCENTRATION OF THE BASIN WAS 0 MINUTES.
(REGIONAL TCa10+TOTAL LENGTH/180) MINUTES
THE TIME OF CONCENTRATION OF THE BASIN USED WAS 5 MINUTES.
RATIONAL METHOD FOR A SINGLE BASIN ANALYSIS
METRO DENVER CITIES/COUNTIES AND UO&FCD POOL FUND STUDY
USER:MERRICK Engineers & Architects . .......................
PROCESSED FILE: ELTCROOF.OAT DATE: 11-08-1995 TIME:11:32:39 VERSION=11-22-1993
PROJECT TITLE: FORT COLLINS EDUCATION AND LIFE TRAINING CENTER P. )
Proposed Roof Surface 2 year Storm Event Analysis
BASIN DRAINAGE DATA; BASIN SLOPE ALONG EACH FLOWLINE:
---------------------------------------------------------------------------
BASIN 1ST WATERWAY 2NO WATERWAY 3RO WATERWAY BASIN
IO FLOW GROUND FLOW GROUND. FLOW GROUND AREA
NO LENGTH SLOPE LENGTH SLOPE LENGTH SLOPE
------------ -------------------------------------------------------------
1002 54.00 4.1T 0.00 0.00 0.00 0.00 0.03
BASIN LANDUSES AND THEIR IMPERVIOUSNESS:
----------------------------------------------------------------------------
BASIN LANDUSES AND THEIR IMPERVIOUNESS x
ID 1ST 1ST 2NO 2NO 3RO 3RO WT'0
NO IMP AREA FMP AREA IMP AREA IMP -
z z z x x x z
1002 0.95' 100.00 0.95 0.00 0.95 0.00 0.95
NOTE: LENGTH IN FEET; AREA IN ACRES; SLOPES IN x
DESIGN RAINFALL STATISTICS
DESIGN RETURN PERIOD (YEARS) = 2.00
RAINFALL INTENSITY -DURATION FORMULA IS GIVEN AS:
I(IN/HR)=CONSTI"H1/(T+CONST2)-CONST3
ONE -HOUR DEPTH (INCHES)= 0.95
CONST 1 = 28.5
CONST 2 = 10
CONST 3 = .786
BASIN RUNOFF C13EFFI1CIENT ANO.PEAK RUNOFF
-?HE TIME Of tONtENTRATION OF THE BASIN USED WAS 5 MINUTES.
BASIN WEIGHTED RUNOFF COEF = 1.00
COEF FOR A 5-YR EVENT CS = 0.95
URBANIZATION INDICATOR (RUNOFF COEF) = 0.30
DESIGN RAINFALL INTENSITY (INCH/HR) - 3.22
DESIGN PEAK RUNOFF (CFS) = 0.10
PROJECT TITLE: FORT COLLINS EDUCATION AND LIFE TRAINING CENTER P. 2
Graveled Surface 100 year Storm Event Analysis
PROCESSED FILE:ELTCGRAV.DAT OATE:11-08-1995 TIME: 11:26:36 VERSION=11-22-1993
FLOW TIMES AND VELOCITIES
LENGTH
SLOPE
VELOCITY
TIME
'-----------------------------------------------------------
FT
PERCENT
FPS
MINUTES
OVLNO FLOW OF
1ST
WATERWAY
54.00
4.17
1.01
4.95
SCS TYPE FLOW OF
1ST
WATERWAY
0.00
4.17
0.00
0.00
SCS TYPE FLCW OF
2NO
WATERWAY
0.00
0.00
0.00
0.00
SCS TYPE FLOW OF
3R0
WATERWAY
0.00
0.00
0.00
0.00
MAX LENGTH FOR OVERLAND FLOW WAS 300 FEET.
AIRPORT FORMULA WAS USED FOR OVERLAND FLOW UP TO THE MAXIMUM LENGTH.
SCS METHOD WAS USED. FOP, THE REST OF ORAINAGEWAY.
SCS CODES FOR VARIOUS FLOWS ARE:
I.MEAOOW 2.TILLAGE 3.LAWN 4.8ARE SOIL 5.GRASSEO CHANNEL 6.PAVEO CHANNEL
SCS TYPE FLOW FOR 1ST WATERWAY= 4 WAS USED.
SCS TYPE FLOW FOR 2NO WATERWAY- 4 WAS USED.
SCS TYPE FLOW FOR 3RO WATERWAY- 4 WAS USED.
THE COMPUTED TIME OF CONCENTRATION OF THE BASIN = 4.95408 MINUTES
THE REGIONAL TIME OF CONCENTRATION OF THE BASIN WAS 0 MINUTES.
(REGIONAL T610+TOTAL LENGTH/180) MINUTES
THE TIME OF CONCENTRATION OF THE BASIN USED WAS 5 MINUTES.
RATIONAL METHOD FOR A SINGLE BASIN ANALYSIS
METRO DENVER CITIES/COUNTIES AND UO&FCO POOL FUND STUDY
USE-R:MERRICK Engineers & Architects ............. .............................
PROCESSED FILE:ELTCGRAV.OAi DATE:11-08-1995 TIME: 11:26:36 VERSION=11-22-1993
PROJECT TITLE: FORT COLLINS EDUCATION AND LIFE TRAINING CENT -ER P. 1
Graveled Surface 100 year Storm Event Analysis
BASIN DRAINAGE DATA: BASIN SLOPE ALONG EACH FLGWLINE:
---------------------------------------------------------------------------
BASIN 1ST WATERWAY 2,NO WATERWAY 3RO WATERWAY BASIN
IO FLOW GROUND FLCW GROUND FLOW GROUND AREA
NO LENGTH SLOPE LENGTH SLOPE LENGTH SLOPE
---------------------------------------------------------------------------
1001 54.00 4.17 0.00 0.00 0.00 0.00 0.03
BASIN LANOUSE-S AND THEIR IMPERVIOUSNESS:
---------------------------------------------------------- ----------------
BASIN LANOUSES AND THEIR IMPERVIOUNESS z
ID 1ST 1ST 2NO 2N0 3RO 3R0 WT10
NO IMP AREA IMP AREA IMP AREA IMP
x z x x z x z
---------------------------------------------------------------------------
1001 0.50 100.00 0.50 0.00 0.50 0.00 0.50
NOTE: LENGTH IN FEET; AREA IN ACRES; SLOPES IN x -
DESIGN RAINFALL STATISTICS
DESIGN RETURN PERIOD (YEARS) - 100.00
RAINFALL INTENSITY-OURATION FORMULA IS GIVEN AS:
I(IN/HR)-CONST1-H1/(T+CONST2) CONST3
ONE -HOUR DEPTH (INCHES)- 2.60
CONST 1 - 28.5
CONST 2 - 10
CONST 3 - .786
`BASIN -RUNOFF COEFFICIENT AND PEAK RUNOFF
THE TIME Of -CONCENTRATION OF THE BASIN USED WAS 5 MINUTES.
BASIN WEIGHTED RUNOFF COEF - 0.63
COEF FOR A 5-YR EVENT C5 - 0.50
URBANIZATION INDICATOR (RUNOFF COEF) = 0.30
DESIGN RAINFALL INTENSITY (INCH/HR) = 8.82
DESIGN PEAK RUNOFF (CFS) = 0.16
PROJECT TITL'c: FORT COLLINS EDUCATION AND LIFE TRAINING CENTER P• 2
Graveled Surface 2 year Stomn Event Analysis
PROCESSED FILE: ELTCGRAV.OAT DATE: 11-08-1995 TIME: 11:24:53 VERSION=11-22-1993
FLOW TIMES AND VELOCITIES
LENGTH
SLOPE
VELOCITY
TIME
-----------------------------------------------------------------
FT
PERCENT
FPS
MINUTES
OVLNO FLOW OF 1ST WATERWAY
54.00
4.17
1.01
4.95
SCS TYPE FLOW OF 1ST WATERWAY
0.00
4.17
0.00
0.00
SCS TYPE FLOW OF 2ND WATERWAY
0.00
0.00
0.00
0.00
SCS TYPE FLOW OF 3RO WATERWAY
0.00
0.00
0.00
0.00
MAX LENGTH FOR OVERLAND FLOW WAS 300 FEET.
AIRPORT FORMULA WAS USED FOR OVERLAND FLOW UP TO THE MAXIMUM LENGTH.
SCS METHOD WAS USED FOR THE REST OF ORAINAGEWAY-.
SCS CODES FOR VARIOUS FLOWS ARE:
I.MEADCW 2.TILLAGc 3.LAWN 4.BARE SOIL 5.GRASSEO CHANNEL 6.PAVEO CHANNEL
SCS TYPE FLOW FOR 1ST WATERWAY- 4 WAS USED.
SCS TYPE FLOW FOR 2NO WATERWAY- 4 WAS USED.
SCS TYPE FLOW FOR 3RO WATERWAY- 4 WAS USED.
THE COMPUTED TIME OF CONCENTRATION OF THE BASIN - 4.95408 MINUTES
THE REGIONAL TIME OF CONCENTRATION OF THE BASIN WAS 0 MINUTES.
(REGIONAL TC-10+TOTAL LENGTH/180) MINUTES
THE TIME OF CONCENTRATION OF THE BASIN USED WAS 5 MINUTES.
RATIONAL METHOD FOR A SINGLE BASIN ANALYSIS
METRO DENVER CITIES/COUNTIES AND UO&FCO POOL FUND STUDY
USER:MERRICK Engineers & Architects ..........................................
PROCESSED FILE: ELTCGRAV.DAT DATE: 11-08-1995 TIME:11:24:53 VERSION-11-22-1993
PROJECT TITLE: FORT COLLINS EDUCATION AND LIFE TRAINING CENTER P. I
Graveled Surface 2 year Stain Event Analysis
BASIN DRAINAGE DATA; BASIN SLOPE ALONG EACH FLCWLINE:
---------------------------------------------------------------------------
BASIN 1ST WATERWAY 2NO WATERWAY 3RO WATERWAY BASIN
ID FLOW GROUND FLOW GROUNO FLOW GROUND AREA
NO LENGTH SLOPE LENGTH SLOPE LENGTH SLOPE
---------------------------------------------------------------------------
1001 54.00 4.17 0.00 0.00 0.00 0.00 0.03
BASIN LANOUSES AND THEIR IMPERVIOUSNESS:
BASIN LANOUSES AND THEIR IMPERVIOUNESS x
10 1ST IST ZNO 2NO 3RO 3RD WT'D
NO IMP AREA IMP AREA IMP AREA IMP
z z x z z x x
-------------------------------
1001 0.50 100.00 0.50 0.00 0.50 0.00 0.50
NOTE: LENGTH IN FEET; AREA IN ACRES; SLOPES IN x
DESIGN RAINFALL STATISTICS
DESIGN RETURN PERIOD (YEARS) 2.00
RAINFALL INTENSITY-OURATICN FORMULA IS GIVEN AS:
((IN/HR)=CONSTI'H1/(T*CONST2) CONST3
ONE -HOUR DEPTH (INCHES)- 0.95
CONST 1 = 28.5
CONST 2 = 10
CONST 3 = .786
"9ASIA RLMOFF COEFFICIENT AND PEAK RUNOFF
THE TIME DP CONCENTRATION OF THE BASIN USED WAS 5 MINUTES.
BASIN WEIGHTED RUNOFF COEF = 0.50
COEF FOR A 5-YR EVENT C5 = 0.50
URBANIZATION INDICATOR (RUNOFF COEF) = DAD
DESIGN RAINFALL INTENSITY (INCH/HR) = 3.22
DESIGN PEAK RUNOFF (CFS) = 0.05
w
N
0
m
a
L1
z
n
D
HI
D
D
2
0
= 5
CIC
a
cn
w 4
x
U
Z
0 3
F-
a.
wix 2
a
a,i
S
TIME IN MINUTES
11
r;
PROPOSED SICE- e)OSTR(C OF- 0.03 eb a,=- 3.16 eft
.NEW 20' AIDE WALK CHASE
r,Oaa�YS`tNC
EzsnNc UCE
CONCRETE P —
. _
CONCRETE PAO
NEWSCJPPE
AIS
NO OOw(SPCUTS
NEW
ORYWE L
OPl
PROPOSED 0 - al eh G
T Im ate <h
SF)
L
NEW CRIO(ET
`DO+O CRIOOT
E%ISTINC CRICKET
i
E)eTINC RCCF (2.e22 S.F.)
SLOPE:- O/e'/FT.
`EO05'.ING
N000 FENCE
—EOCC OF
iv
JPLA.90E`NMXiSTINONIE
AL7HRE
NFORANT
LICHT
P01`
�—OIRT PARI(01G AREA --�
O
0
�EOCE DF EJQSTINC PAYENENT I
ROOF PUN SHOWING NEW ADOITION'
SCALE 10. 25'
" P.luaT u
------------------------
TMEJ
PPwq.aeNA<t Lev .00lTidyTlsTIIIC
0o.mart ANa arts r
NORTU SIDE ELEVATION SF,O,INc ROOF ORAINACE SYSTEM
SCALE S'
9
1 )
BVILOINC INFORMATION
EXLS NG SF. -1846
AoonION S-F. - I,137
TOTAL S.F. - S.00]
® MERRICK =N...AapIa A `' '°""'�"'
!. P411. SLIM( 6C(X�(TION MO(�B TTAMO CEI(191 '.l(11da( C. TLLLt dTOQO •. �� aWIK 4:mllG
M-w Acornm CwVUR1 ,fTUOY OATC II/I•/n
.A V. iNll urT
( PAa[O
Education and Life Training Center
New Addition Drainage Impact
APPENDIX
11/13/95
i
Merrick Ref,": 1501 872
Mr. Glenn Schluter
November 16, 1995
Page 3
These facts lead to the conclusion that increases in rugoff_rates by replacing an aggregate surface
with a roof will not adversely impact surrounding property. Better control of flows from this area may.
reduce runoff from this property onto surrounding properties. The direction and degree of slope of
the existing curb and gutter into which the runoff from the proposed new roof will flow, will direct all
flows away from the building site and easily handle the flow volumes from the street and surrounding
basins. Therefore, the replacement of an aggregate surface by the creation of a roof surface in the
Education and Life Training Center complex will not have a significant impact on local ,. conditions. ._............._...._._ _ drainage
For and on behalf of
MERRICK & COMPANY
Gregg S. Ee T.
Project Enginee
cc: Steve White, Facilities Division
Brad Andersen, Merrick & Company
ZT_L����
Russell T. Nelson, P.E.
Project Manager
A:%W O RO_TXr,ELTCORAN.00C
Merrick Ref#: 15011872
Mr. Glenn Schluter
November 16, 1995
Page 2
Contour mapping shows that the longitudinal slope of Linden Street along the ELTC building is about
2 percent downward to the northeast toward the Cache La Poudre River bridge. The improved east
side of Linden Street appears to carry runoff away from the ELTC site in curb and gutter at a slope of
1.8 to 2 percent downward to the northeast. Similarly, the street immediately to the southwest of the
ELTC site also drains runoff away from the site toward the northwest.
The Old Town Basin Master Drainage Plan, dated January 7, 1993, presented to the City of Fort
Collins by Resource Consultants and Engineers shows that reach of a potential shallow flood of less
than 1.5 feet lies to the southwest of this site. The reach of this flood potential is to the southwest of
and does not reach beyond the Cache La Poudre River. Figure 5.1 from this report showing these
reach designations is provided as an attachment in an appendix to this letter.
The analysis for this report was confined to the graveled courtyard area that will be replaced by the
roofed surface. A computer program, RATIONAL, was used to make rational method runoff
calculations. RATIONAL was developed through the Civil Engineering Department at University of
Denver for the Metro Denver Cities/Counties and UD&FCD pool fund study. Rainfall data for one
hour intensities for the 2 year and 100 year storm event were taken from Figure 3-1, City of Fort
Collins. Colorado Rainfall Intensity Duration Curve in the City of Fort Collins' Storm Drainage Design
Criteria and Construction Standards manual (Revised March 1991). These rainfall intensity figures
and runoff coefficients found on pages 3-4 and 3-5 of the referenced manual with the appropriate
frequency adjustment factors applied were entered into the RATIONAL program. Results from the
analysis runs of this program applied to the graveled courtyard area and the proposed roofed area
are attached in an appendix to this letter.
Results
Comparisons between the flow rates and times of concentration for the new roof surface and the
existing graveled( -
parking area show that, as expected, the flow rates are larger for the roofed
surface because the basin size is the same. It should be noted that, since the two surfaces are
relatively impervious, the total volume of runoff for any given storm event will be approximately the
same. However, the rate at which runoff is released is faster for the proposed roofed area. The time
of concentration for the existing parking area is about 5 minutes, while the actual time of
concentration for the roof is under 2 minutes (5 minutes appears in the RATIONAL program analysis
sheets due to a minimum Tc of 5 minutes built into the program).
The RATIONAL analyses show that the flow rate from the existing aggregate surface for the.2 year
storm event is 0.05 cfs and 0.16 cfs for the 100 year event. These rates compare to the runoff
predictedfor the roofed surface of 0.1 cfs for the 2 year event and 0.26 cfs for the 100 year event.
Conclusions
The volumes of flow from this limited area are very small compared to flows from the surrounding
localized basins. Several aspects of the proposed building and roof construction will improve and
better control drainage from this site. Presently, the drainage runoff from the graveled courtyard
runs toward the property boundary fence to the north of the lot with a potential of passing through the
fence onto adjacent property. Replacing this courtyard with a roof will channel runoff to roof drains
and to a piping system which will confine and ultimately direct the flows toward Linden Street.
A:%W OR0-rAMELTCORAN.00C
co❑ i
CCaa MEPPICK
Memck i Camcami
Mail: PC Sox 22025 / Oemer, CC / 20222 / USA
... „................... Ceirver/: 2450 S. Pecra Sc. / Aurora. CC / 5001 A
3031751.0741 / Fax 30?/751.2531
November 21, 1995
Merrick Ref;*: 15011872
Mr. Glenn Schluter, P.E.
Project Engineer, Stormwater and Utilities
City of Fort Collins
235 Mathews Street
Fort Collins, CO 80524
NOV 2 7 i995
Gr" : (rx? ,`.:LL!N
rr �.
DRAINAGE IMPACT OF EDUCATION AND LIFE TRAINING CENTER NEW ADDITION ROOF
Dear Mr. Schluter.
This letter is in response to your request for a discussion of the impacts on site drainage resulting
from the addition of new building space at the Education and Life Training Center (ELTC) at 401
Linden St. This new addition will be built with walls common to the original building and will fill the
vacant portion of the lot north of the "L' shape of the existing building. This addition will make the
building more rectangular in shape.
Discussion
It is our understanding that the area over which the floor slab of the new addition will be built is now
.a -graveled courtyard area consisting of a few inches of aggregate spread over compacted clay soil.
This surface is likely to be relatively impermeable. An aggregate surface of this type will absorb a
small amount of precipitation before releasing flow as the aggregate particles are wetted. This effect
adds to the time of concentration (Tc) in drainage calculations for such a surface and makes release
of precipitation slower than a less rough surface such as pavement or smooth roofing. Slope
calculations performed using an aerial contour map shows that this graveled area has slopes away
from the existing building of between 3 and 5 percent. Site plans show that runoff from this area
may be intercepted by a wood fence line along the north property boundary. A portion of this flow
may pass through this fence and the remainder follows the fence line and flows to the east side of
Linden Street.
This graveled courtyard area will, in effect, be replaced by a built-up composition roof ; the majority
of which will be sloped at 4.17% (Y: inch per foot). A built-up roof of the type proposed for the
referenced project releases and runs off precipitation almost immediately. Runoff from the existing
roof segment is channeled by crickets and parapets to the west side of the new roof segment where
it combines in the guttering system proposed for the north faces of the existing building and new
addition with flows from the remaining new roof segment. Parapets enclose all roof edges and.
prevent spill over of runoff at the edges. The majority of the area of the new roof is drained by six
drain openings, scuppers, connected to downspouts. The new and existing downspouts all connect
to a piping system on the north building face, which is directed to a proposed new concrete sidewalk
chase that runs west under the existing sidewalk to the curb and gutter along the east side of Linden
Street.
A:1W CRO_rAT%EITCORAN.00C
..........................................
An emo"-O w+ed Comoarry