HomeMy WebLinkAboutGOOD SAMARITAN VILLAGE - PDP - 27-96B - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProje(t: r6fr ax441,45 Coo SPfHAiai)gN �,�� _ PbP
Planner: M1k-,& u-iOwJC Tr4cOperations: G apwrr=
Engineer: _-rnm &Atwi!zb
Date:
Items Requested Redlined Items Being Returned
Site land Plat Utility Drainage Rpt I Other Items Required Site Land Plat Utility Drainage Rpt Other Items Being Returned
risgineering ;
itormwater n
ralic Operations
cans. Planning
ral Resources
Planning
Jtals 1
Other: I
Note: All redlined items should be returned with the rewbmittal/ revisions.
• •
Revisions Routing'
FILE: PROJECT PLANNER
ENGINEERING: PAVEMENT
BUILDING INSPEC`nON
MAPPING / DRAFTING
�C:�.........
FORESTRY
FIRE
.........::::
•'ADVANCE
:::........�
PLANNINGWATER
�......
CONSERVATION
POST OFFICE
mmosiv
PUBLIC SERVICE
.COMPANY............:
RAILROAD:
::C:'•......�.
.........:::
:
.�...�.
...........::
.....��..�.�