Loading...
HomeMy WebLinkAboutDRAKE CROSSING, WALGREENS - MAJOR AMENDMENT/FINAL PLAN - 35-96A - CORRESPONDENCE - (4)If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970)221-6341. Yo s Truly, Steve City Planner Page 10 Planning: 1. Why are there 2 drive-thru lanes for this store. Apparently only one lane at existing stores is rarely used. Please eliminate 1 drive-thru lane and increase the landscaping along the north side of the site adjacent to the shopping center driveway. 2. This proposal is eliminating a significant amount of existing trees along the south side of the existing building. The Poudre R-1 School District has a need for trees for their facilities. Some of the trees that this plan is eliminating may be able to be relocated and transplanted. Please contact Jerry Garretson, at (970)490-3600, to discuss the possibility of moving some trees. 3. Additional evergreen trees are needed on the south side of the building along West Drake Road. This development request has been scheduled for the March 21st Planning and Zoning Board hearing on the major amendment. All outstanding City and outside reviewing agency comments and concerns should be addressed as soon as possible. • PMT's (reduced copies to 8.5" x 11" of the Site Plan, Landscape Plan, Building Elevations, and subdivision plat) are due to the Current Planning Department on Tuesday, March 5th. • Renderings (colored versions) of the Site and/or Landscape Plan and the Building Elevations are due to the current Planning Department by Tuesday, March 12th (sent electronically to Ginger or Tara, the Planning Technicians). • Full size copies (8 sets folded) of the Site Plan, Landscape Plan, Building Elevations, and subdivision plat are due in the Current Planning Department on Friday, March 8u'. All outstanding comments and concerns remaining after the P&Z Board public hearing must be addressed and resolved to the acceptance of the City before the development plans can be recorded and permits issued. This completes City staff and outside reviewing agencies comments at this time. The development request is subject to the 90-day revision re - submittal requirement (from the date of this comment letter) as set forth in Section 2.2.11(A) of the Land Use Code. Be sure and return all of your redlined plans when you re -submit. Page 9 Department: Technical Services 1. The property boundary and the legal description on the replat of the subdivision do close. 2. ,There is a "typo" in the legal description on the replat of the subdivision. "77S" should be "77N". 3. The City prefers the term "A Replat of..." instead of "A Resubdivision of..." in the subtitle on the replat. 4. The floodplain lines should be broken where they cross text on the subdivision replat. The following comments were expressed at Staff review on February 20, 2002: Engineering: The replat of the property is showing the vacation of a "bunch" of easements. There may be a need to dedicate easements, either by separate document or with the replat. Stormwater: 1. Stormwater has expressed a new comment about the required water quality pond in their previous comments in this letter. City standards should be used. 2. The City needs a verbal commitment for the necessary storm drainage easement associated with this development. Transportation Planning: 1. Can the 4' wide entry sidewalk along the west side of the entry drive to the shopping center be widened to 6' to be in compliance with the current City Code? 2. The entry drive into this site should be narrowed down to 24' from 30'. Page 8 r 64 Curbstops and meter pits may not be placed in hard surfaces. Curbstops must be within 2 feet of meter pit and must be located within a utility easement. 65 Maintain 10 feet of separation between thrust blocks and all other underground utilities. Department: Zoning Issue Contact: Peter Barnes Topic: LIGHTING 5 REPEAT COMMENT: All site lighting and building mounted lights must be down.directional. How tall are the light poles going to be? Topic: SIGNS 1 REPEAT COMMENT: They need to remove all signage information and drawings from plans, ESPECIALLY SINCE NONE OF WHAT THEY SHOW COMPLIES WITH THE SIGN CODE (I.e. wall signs too tall, monument sign too large. Sec. 3.8.7(E)). They should just indicate on the plans the location on the walls where they propose to place signage. That's all the decision maker should be reviewing. THE LATEST SUBMITTAL (1-25-02) HAS REMOVED THE SIGNS FROM THE ELEVATIONS AS REQUESTED, BUT THEY DIDN'T SHOW THE WALL LOCATIONS FOR THE SIGNS AS REQUESTED. IF THEY DON'T, WE WILL BE UNABLE TO ISSUE SIGN PERMITS FOR WALL SIGNS. ALSO, THEY STILL SHOW THE MONUMENT SIGN DETAILS. AS INDICATED EARLIER, THAT MUST BE REMOVED. WHAT THEY SHOW DOES NOT COMPLY WITH THE CODE (WAY TOO BIG, TOO TALL). Topic: ZOMNG 2 REPEAT COMMENT: Need to show/label a building envelope on site plan. The envelope must include the drive-thru canopy. I STILL DON'T SEE THE ENVELOPE DESIGNATED ON PLAN. AS PART OF THE ENVELOPE DESIGNATION, THE DISTANCES FROM LOT LINES TO ENVELOPE LINE WILL NEED TO BE SHOWN. Page 7 4. Why are there two Appendices A and B? Is A different than "A", B different than "B"? 5. Other notes from previous review have not been addressed. Topic: Floodplain 72 Please fill out.the attached floodplain use permit and return with the $25.00 fee. Department: Transportation Planning Issue Contact: Tom Reiff 36 (Repeat Comment Round 2) Expand the existing 4-foot sidewalk along the main drive aisle out to Drake from the new development to a minimum of 6- feet per Land Use Code (LUC)3.2.2 (C.5,a). Topic: General 71 Attempt to redesign the main drive in front of the store with a reduced width, which is currently shown at approximately 30 feet. This width is as large as the City's local street standard. Department: Water Wastewater Issue Contact: Jeff Hill 45 Original plat indicates lot 2 was utility/access/drainage easement. Existing water and sewer mains must be located in a utility easement. Correct the replat to reflect this. Clearly define all utility easements. A 10 foot utility easement is required on either side of a water main and a 15 foot utility easement is required on either side of a sanitary sewer main. 48 All existing water and sewer services must be used or abandoned at the main. Clearly define the abandonment of existing services. 49 Include all appropriate details on a detail sheet (I.e. thrust block, meter pit, typ. Water service, etc.). 63 Maintain 10 feet of horizontal separation between water and sewer lines. Maintain 10 feet of separation between overhead lighting (post mounted) and water sewer lines. Page 6 52 Water Supply: No commercial building can be greater then 300 feet from a fire hydrant. Fire hydrants are required with a maximum spacing of 600 feet along an approved roadway. Each hydrant must be capable of delivering 1500 gallons of water per minute at a residual pressure of 20 psi. 97 UFC 901 2.2.2 53 Hazardous Materials: Corrosive, flammable liquids, reactive, or toxic materials (As defined in the Uniform Fire Code) if used, stored or handled on site must have a Hazardous Materials Impact Analysis (HMIA) completed and supplied to the Planning Department and the Fire Department. FCLUC 3.4.5(C) 54 Sprinkler Requirement: This proposed building shall be fire sprinklered. 97 UFC 1003.2.9 NOTE: Poudre Fire Authority requires a "Knox Box" to be mounted on front of every new building equipped with a required fire sprinkler system or fire alarm. 97 UFC 902.4; PFA Policy 88-20 Department: Stormwater Utility Topic: Drainage Issue Contact: Wes Lamarque 67 - Please calculate the water quality volume required for the entire site and show what volume is being provided. A variance request can then. be asked for the difference, which the City would support due to site restrictions and existing conditions. 68 Please add a metal plate to the water quality outlet structure per USDCM Volume III, 40-hour extended detention with the required orifices. The orifices can be designed as if the entire water quality volume was provided. Topic: Erosion/Sediment Control 66 1. The calculations do not reflect "during construction" EFF. 2. There is no surety calculation. ., 3. There are no City of Fort Collins standard erosion control notes on the plan. Make sure none of these are contradicted by any of the notes you currently have on the plan. Page 5 Department: Light & Power Issue Contact: Doug Martine 8 The new transformer will need to be within 10 ft. of an all weather surface for line truck access. 9 Developer will need to coordinate electric system modifications and new electric service requirements with Light and Power engineering. Since the bank to the west receives electric service from the transformer that will be removed, coordination will also be necessary to maintain electric service to the bank. ,. 10 Costs to modify the electric system, as well as new development costs, will be at the developer's expense. Department: Light & Power Topic: General Issue Contact: Bruce Vogel 62 Refer to comments made by Doug Martine on 9-27-2001, these are still current. Department: Natural Resources Topic: General Issue Contact: Doug Moore 70 The Natural Resources Department still discourages the use of drive-thru lanes on this project. We have found that drive-thru lanes at pharmacies in the Fort Collins area are seldom used. Fort Collins is an environmentally concerned community at is at is very aware of the impacts of that drive-thru lanes have on air quality and the brown cloud along the Colorado Front Range. NRD has no other issues at this time. Department: PFA Issue Contact: Michael Chavez 51 Address Numerals: Address numerals shall be visible from the street fronting the property, and posted with a minimum of 8-inch numerals on a contrasting background. ( Bronze numerals on brown brick are not acceptable). 97 UFC 901.4.4 Page 4 28 Utility Plans. Provide all applicable general notes and construction notes. Repeat. Use the general notes on from the sheet provided. These are the most current for City of Fort Collins use. The Construction notes can be found in appendix E-2 of Larimer County Urban Area Street Standards. 30 Utility Plans Provide all applicable details. Topic: General 73 Provide two benchmarks as required in the general notes. 74 Remove the easement lines from the plans for the easements being vacated. They will not exist upon platting they do not need to be shown. Show the extension of the 15 foot utility easement behind the row extending to the new property lines. 75 Need to dedicate drainage easement(s) for any detention or water quality area being provided. 76 Trench detail - Label this for on -site work. This is not our current standard for work in the row. 77 The 'street intersection gutter detail with crosspan' detail. You have no street intersections that you will be building or working on. It is okay to use for on -site work just remove street from the label and insert driveway. 78 Need to provide details: 7-20A for vertical curb and 16-2 for sidewalk. These are needed for any curb gutter and sidewalk repair and or replacement that is required within the City row. 79 Plat - Need to provide some more dimensions so easements are locatable. 80 Plat - need to show the 15 foot utility easement extend all along the frontage of Lot 3. Page 3 58 Ward Stanford of the Traffic Operations Department offered the following comments: 1. The Transportation Impact Study needs to be revised and re- submitted for the following reasons: * HCS volume for the westbound left is in error. It analyzes with 50 and it should be 150. * Table 1 does not have Level Of Service data for Drake Road and Taft Hill Road (where the project is located), but it does have data about US 287 and 37th Street (assumedly in Loveland). Why is this? What is the relevance? * It would be helpful if all the spreadsheets in the appendices are labeled with the intersection. * Use a 3 second lost time in the HCS analysis. * Use 2% for heavy vehicles. * The trip distribution percentages need review and may be affecting site traffic distribution numbers. * Please review the traffic study. There seems to be numerous errors. 2. Please provide a narrative as to what is taking place with this project. Are existing buildings being demolished? Is the existing Walgreens vacating their current building? The Site Plan indicates that the building and parking area will be placed where current buildings exist. 59 Please see red -lined plans for Current Planning Department comments. Department: Engineering Issue Contact: Sheri Wamhoff 19 Show the property boundaries as shown by the plat that was submitted. 27 Utility Plans Provide a Cover sheet and all the items that are�to be on it. See Check sheet and standards for requirements. Provide a utility plan set: cover sheet, utility plan, drainage and erosion control, drainage basin boundaries, details. Page 2 STAFF PROJECT REVIEW City of Port Collins Galloway, Romero & Assoc. Date: 2/27/2002 c/o Peggy Friesen 5350 DTC Parkway Greenwood Village, CO. 80111 Staff has reviewed your revisions documentation that was re -submitted for the WALGREENS @ DRAKE CROSSING - MAJOR AMENDMENT/FINAL PLAN - #35-96A, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt 55 Len Hilderbrand of Excel Energy (Public Service) offered the following comments: 1. PSCO has a 6" gas line on the south and west sides of the project and gas line along the north edge of the property. They also have gas service lines serving existing buildings. Any relocation of existing lines will be at the developers expense. 2. An existing gas main lays approximately 5' north of West Drake Road, per gas plat 2106-444. 3. No trees may be planted within 4' (horizontally) of gas lines. 4. Please contact Len Hilderbrand, at (970)225-7858, for installation of proposed gas lines. 56 Laurie D'Audney of the Water Utilities is forwarding a copy of the Water Conservation Standards for Landscapes COMMENT SHEET and the Water Conservation Standards for LANDSCAPING and IRRIGATION SYSTEMS General Information. This information was provided to the applicant with the first round of review and apparently was not addressed. Page 1