Loading...
HomeMy WebLinkAboutDRAKE CROSSING, WALGREENS - MAJOR AMENDMENT/FINAL PLAN - 35-96A - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject: �l �rep,05 , Ors./p, T— Date: Planner:+ 6�f Engineer: TraM( Operations: Items Requested Site I land Plat Utility Drainage Rpt Other Items Required Redlined Items Being Returned Site Land Plat Utility Drainage R t Other Items Being Returned Engineering x x x x x Nrmwater x x F�oo� s�l�ivoe �, n Water/Wastewate x x ,c X x X x x Traffic Operations Trans. Planning x _ — Trantrt — fiatural Resources — — Park Planning Totals 4 ;� 3 :5 z, Other: Note: All redlined items should be returned with the resubmimV tuitions. Pl�� Gies ov;"e—� 0-c— ck(, ,& Revisions Routin Item: n,� Date: /�,'I7 02 y fi i FILE: PROJECT PLANNER ENGINEERING: PAVEMENT ZONING BUILDING INSPECTION LIGHT & POWER MAPPING / DRA17TING FORESTRY FCL'WD/ELCO/BO,YEL.DER FIRE POLICE ADVANCE PLANNING STREETS R.O.W. PLANNING WATER CONSERVATION POST OFFICE US WEST PUBLIC SERVICE SCHOOLS: POUDRE / THOMPSON CABLE TV A V.A l STATE HIGHWAY DEPARTMENT DITCH COMPANY RAILROAD: UP or BN/CS REA/DOE/PRPA :L. i� g Sheet -t3 � A��ee ti t c a 0 A v r x o �� Rex 5-07-97 lO