Loading...
HomeMy WebLinkAboutTHE STANDARD AT FORT COLLINS - FDP - FDP170023 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORTTHE STANDARD AT FORT COLLINS Erosion Control Cost Estimate Project Number: 1290-001 Location: Fort Collins, CO Date: August 14, 2017 Total Acres: 4.23 Estimated Unit Total EROSION CONTROL MEASURE Units (quantity Price Price Inlet Protection each 27 $100.00 $2,700.00 Silt Fence L.F. 2278 $1.10 $2,505.80 Rock Socks each 19 $125.00 $2,375.00 Vehicle Tracking Control Pads each 2 $300.00 $600.00 Concrete Washout Area each 2 $200.00 $400.00 Erosion Control Matting sq. yd. 0 $3.00 $0.00 Vegetate Landscaped Areas acre 1.175 $1,000.00 $1,175.00 TOTAL = $9,755.80 AMOUNT OF SECURITY = 1.5 x $9,755.80 = TOTAL = $14,633.70 -OR- COST TO VEGETATE: TOTAL ACRES x ($1000/acre) x 1.5 = TOTAL = $6,345.00 (WHICHEVER IS GREATER) REQUIRED AMOUNT OF SECURITY = $14,633.70 NOTE: 'Total Acres' represents total disturbed area. SAMNS\Planning\Project Submittal Documents\The Standard\FDP\Round 1\1290-001 Erosion-Escrow-Estimate-xls