HomeMy WebLinkAboutTHE STANDARD AT FORT COLLINS - FDP - FDP170023 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORTTHE STANDARD AT FORT COLLINS
Erosion Control Cost Estimate
Project Number: 1290-001
Location: Fort
Collins, CO
Date: August 14, 2017
Total Acres: 4.23
Estimated
Unit
Total
EROSION CONTROL MEASURE Units (quantity
Price
Price
Inlet Protection each 27
$100.00
$2,700.00
Silt Fence L.F. 2278
$1.10
$2,505.80
Rock Socks each 19
$125.00
$2,375.00
Vehicle Tracking Control Pads each 2
$300.00
$600.00
Concrete Washout Area each 2
$200.00
$400.00
Erosion Control Matting sq. yd. 0
$3.00
$0.00
Vegetate Landscaped Areas acre 1.175
$1,000.00
$1,175.00
TOTAL =
$9,755.80
AMOUNT OF SECURITY = 1.5 x $9,755.80 =
TOTAL =
$14,633.70
-OR-
COST TO VEGETATE: TOTAL ACRES x ($1000/acre) x 1.5 =
TOTAL =
$6,345.00
(WHICHEVER IS GREATER)
REQUIRED AMOUNT OF SECURITY =
$14,633.70
NOTE: 'Total Acres' represents total disturbed area.
SAMNS\Planning\Project Submittal Documents\The Standard\FDP\Round 1\1290-001 Erosion-Escrow-Estimate-xls