Loading...
HomeMy WebLinkAboutDRAKE CROSSING SHOPPING CENTER (FIRST NATIONAL BANK DRIVE-UP) - AMENDED FINAL PUD - 35-96 - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT SUBMITTAL AND RESUBMITTALGQHEHDED TDIRQKIE QROOSH2 SHOPNK(3 C[EH=TE[% POUO[50 FINAL SITE PLAN FIRST NATIONAL BANK PLAZA FORT COLLINS, COLORADO FINAL P.U.D. DECEMBER 23, 1996 LAND USE TABLE EXISITWS ZONINCs (TO REMAIN) P.UD. DEVELOPMENT AREA PERIMETER LANDSCAPE AREA 14,904 SQ FT. 5126 SQ FT NET SITE AREA 20,030 SQ FT, BUILDIN@ AREA 424 5Q FT, CONSTRUCTION COST PBO)Z000.00 SITE COVERAGE BUILDIWS COVER46E DRIVEWAYS AND PARKIWS OPEN 5PAGEl LANDSCAPINCs AREA 424 Sa FT. 12,405 SQ FT. 2075 5Q FT TOTAL 14,W4 SG. Ff. OFF-STREET PARKMG EXISTIWCx PROPOSED STANDARD 71 35 A -CE551BLE 0 1 STACKING 0 24 TOTAL ll 60