HomeMy WebLinkAboutDRAKE CROSSING SHOPPING CENTER (FIRST NATIONAL BANK DRIVE-UP) - AMENDED FINAL PUD - 35-96 - SUBMITTAL DOCUMENTS - ROUND 1 - PROJECT SUBMITTAL AND RESUBMITTALGQHEHDED
TDIRQKIE QROOSH2
SHOPNK(3 C[EH=TE[% POUO[50
FINAL SITE PLAN
FIRST NATIONAL BANK PLAZA
FORT COLLINS, COLORADO
FINAL P.U.D.
DECEMBER 23, 1996
LAND USE TABLE
EXISITWS ZONINCs (TO REMAIN)
P.UD.
DEVELOPMENT AREA
PERIMETER LANDSCAPE AREA
14,904 SQ FT.
5126 SQ FT
NET SITE AREA
20,030 SQ FT,
BUILDIN@ AREA
424 5Q FT,
CONSTRUCTION COST
PBO)Z000.00
SITE COVERAGE
BUILDIWS COVER46E
DRIVEWAYS AND PARKIWS
OPEN 5PAGEl LANDSCAPINCs AREA
424 Sa FT.
12,405 SQ FT.
2075 5Q FT
TOTAL
14,W4 SG. Ff.
OFF-STREET PARKMG EXISTIWCx PROPOSED
STANDARD 71 35
A -CE551BLE 0 1
STACKING 0 24
TOTAL ll 60