Loading...
HomeMy WebLinkAboutDRAKE CROSSING, SAFEWAY FUEL CENTER - FDP - 35-96E - CORRESPONDENCE -\ T �' e w� �pG�. G�.e� ��: 2. It appears that there is a relatively large amount of earthwork on the site for the area, and that the erosion control plan as submitted does not adequately address the work being done. In addition, there are no calculations, project schedule, report, or surety calculation. Please submit. Department: Stormwater-Water-Wastewater Issue Contact: Roger Buffington Topic: WaterlWastewater Number: 18 Created: 5/ 10/2006 [9 / 21 / 06] (Repeat comment) The separate sewer services may connect to the MH or directly to the 8-inch sewer. [6/20/06] Provide separate sewer services (from carwash and from C-store) to the manhole on the 8-inch public as marked on the previous redlined plans [5/ 10/061 See plans for other comments. Number: 59 Created: 9 / 21 / 2006 [9 / 21 / 06] See red -lined plans for other comments. These outstanding issues can be addressed and resolved with the mylars of the plans for the project. Be sure and return all red -lined plans when you submit mylars, with a set of paper copies, of the plans. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970)221-6341. Yours �Truly, Steve Olt City Planner cc: Randy Maizland Current Planning file #35-96E Page 3 Department: PFA Issue Contact: Carie Dann Topic: Fire Number: 58 Created: 9 / 20/ 2006 [9/20/061 No additional comments or concerns. Department: Stormwater-Water-Wastewater Issue Contact: Wes Lamarque Topic: Stormwater Number: 7 Created: 5 / 9 / 2006 [9/20/06] All the fuel pumps and gas storage tank area needs to drain to the spill containment area. There seems to be some areas that drain to the other curb cut. [6/20/061 No utility plan was received by Stormwater. Will review at final compliance. [5 / 9 / 06] Per conceptual review comment, spill containment for the fuel pump area is required. The City has a standard detail in electronic form. Number: 10 Created: 5/9/2006 [9/22/06] Repeat Comment. Need to show drainage easement on the grading plan and need to see signed easement before signing of mylars. [6/20/06] Will determine necessary drainage easement locations at final compliance. [5/9/06] Any drainage facilities within the site is required to be included within a drainage easement. Number: 57 Created: 9 / 20 / 2006 [9/20/06] The spill containment detail is more of a schematic and needs to be a construction detail with structural design included. Number: 60 Created: 9 / 22 / 2006 [9/22/06] Please define the ridgelines for the various sub -basins throughout the site. Only a partial are illustrated. Number: 61 Created: 9 / 22 / 2006 [9/22/06] Detail D46, water quality outlet structure, has been slightly modified. Please insert the new detail into the plans. I can email the new drawing. Topic: Stormwater-Erosion Control Number: 62 Created: 9 / 22 / 2006 [9/22/061 1. The grading/erosion control notes on sheet CG1.1 are incorrect, please delete and replace with the correct City of Fort Collins notes. Page 2 STAFF PROJECT REVIEW City of Fod Collins GALLOWAY, ROMERO 8v ASSOCIATES Date: 09/27/2006 c/o John C. Scales 5350 DTC Parkway Greenwood Village, CO 80111 Staff has reviewed your submittal for DRAKE CROSSING, SAFEWAY FUEL CENTER - FINAL PLANS, and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Randy Maizland Topic: Stormwater Number: 53 Created: 9 / 12 / 2006 [9/ 12/06] Please make minor changes to the title on the cover sheet per the redline check print. Number: 54 Created: 9 / 12 / 2006 [9/ 12/06] The Lighting Plan will be included with the Site & Landscape Plans. Please remove the Lighting Plan sheet from the Utility Plan set and revise the index on the cover sheet. Add the ALTA survey to the index on the cover sheet. Number: 55 Created: 9/ 12/2006 [9/ 12/06] Refer to the Detail Sheet CU1.3 - Detail D-14, Gutter Cross Pan. I do not see where a cross pan is being proposed. Please call it out on the Grading Plan sheet with a construction note or remove the detail. Number: 56 Created: 9 / 12 / 2006 [9/ 12/06] If other departments have no comments then minor corrections may be made and mylars submitted, with red -lines returned. Department: Light & Power Issue Contact: Doug Martine Topic: Electric utility Number: 2 Created: 4/20/2006 [8/29/061 [4/20/061 The existing electric service to the car wash is 300 amps. Since the fuel station will need 1200 amps, it will be necessary to change the transformer to a larger one in the same location. The Light & Power charges for the additional capacity plus costs to change the transformer are estimated to be $15,000.00. These charges will be a separate invoice, not included with other building permit fees. Contact Light & Power Engineering at (970)221-6700 to initiate the invoice and utility work. Page 1