HomeMy WebLinkAboutDRAKE CROSSING, SAFEWAY FUEL CENTER - FDP - 35-96E - CORRESPONDENCE -\ T
�'
e w� �pG�.
G�.e� ��:
2. It appears that there is a relatively large amount of earthwork on the
site for the area, and that the erosion control plan as submitted does
not adequately address the work being done. In addition, there are no
calculations, project schedule, report, or surety calculation. Please
submit.
Department: Stormwater-Water-Wastewater Issue
Contact: Roger Buffington
Topic: WaterlWastewater
Number: 18 Created: 5/ 10/2006
[9 / 21 / 06] (Repeat comment) The separate sewer services may connect to
the MH or directly to the 8-inch sewer.
[6/20/06] Provide separate sewer services (from carwash and from C-store)
to the manhole on the 8-inch public as marked on the previous redlined
plans
[5/ 10/061 See plans for other comments.
Number: 59 Created: 9 / 21 / 2006
[9 / 21 / 06] See red -lined plans for other comments.
These outstanding issues can be addressed and resolved with the mylars of
the plans for the project. Be sure and return all red -lined plans when you
submit mylars, with a set of paper copies, of the plans.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at (970)221-6341.
Yours �Truly,
Steve Olt
City Planner
cc: Randy Maizland
Current Planning file #35-96E
Page 3
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 58 Created: 9 / 20/ 2006
[9/20/061 No additional comments or concerns.
Department: Stormwater-Water-Wastewater Issue
Contact: Wes Lamarque
Topic: Stormwater
Number: 7 Created: 5 / 9 / 2006
[9/20/06] All the fuel pumps and gas storage tank area needs to drain to
the spill containment area. There seems to be some areas that drain to the
other curb cut.
[6/20/061 No utility plan was received by Stormwater. Will review at final
compliance.
[5 / 9 / 06] Per conceptual review comment, spill containment for the fuel
pump area is required. The City has a standard detail in electronic form.
Number: 10 Created: 5/9/2006
[9/22/06] Repeat Comment. Need to show drainage easement on the
grading plan and need to see signed easement before signing of mylars.
[6/20/06] Will determine necessary drainage easement locations at final
compliance.
[5/9/06] Any drainage facilities within the site is required to be included
within a drainage easement.
Number: 57 Created: 9 / 20 / 2006
[9/20/06] The spill containment detail is more of a schematic and needs to
be a construction detail with structural design included.
Number: 60 Created: 9 / 22 / 2006
[9/22/06] Please define the ridgelines for the various sub -basins
throughout the site. Only a partial are illustrated.
Number: 61 Created: 9 / 22 / 2006
[9/22/06] Detail D46, water quality outlet structure, has been slightly
modified. Please insert the new detail into the plans. I can email the new
drawing.
Topic: Stormwater-Erosion Control
Number: 62 Created: 9 / 22 / 2006
[9/22/061
1. The grading/erosion control notes on sheet CG1.1 are incorrect, please
delete and replace with the correct City of Fort Collins notes.
Page 2
STAFF PROJECT REVIEW
City of Fod Collins
GALLOWAY, ROMERO 8v ASSOCIATES Date: 09/27/2006
c/o John C. Scales
5350 DTC Parkway
Greenwood Village, CO 80111
Staff has reviewed your submittal for DRAKE CROSSING, SAFEWAY FUEL
CENTER - FINAL PLANS, and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Randy Maizland
Topic: Stormwater
Number: 53 Created: 9 / 12 / 2006
[9/ 12/06] Please make minor changes to the title on the cover sheet per the
redline check print.
Number: 54 Created: 9 / 12 / 2006
[9/ 12/06] The Lighting Plan will be included with the Site & Landscape
Plans. Please remove the Lighting Plan sheet from the Utility Plan set and
revise the index on the cover sheet. Add the ALTA survey to the index on the
cover sheet.
Number: 55 Created: 9/ 12/2006
[9/ 12/06] Refer to the Detail Sheet CU1.3 - Detail D-14, Gutter Cross Pan.
I do not see where a cross pan is being proposed. Please call it out on the
Grading Plan sheet with a construction note or remove the detail.
Number: 56 Created: 9 / 12 / 2006
[9/ 12/06] If other departments have no comments then minor corrections
may be made and mylars submitted, with red -lines returned.
Department: Light & Power Issue Contact: Doug Martine
Topic: Electric utility
Number: 2 Created: 4/20/2006
[8/29/061
[4/20/061 The existing electric service to the car wash is 300 amps. Since
the fuel station will need 1200 amps, it will be necessary to change the
transformer to a larger one in the same location. The Light & Power charges
for the additional capacity plus costs to change the transformer are
estimated to be $15,000.00. These charges will be a separate invoice, not
included with other building permit fees. Contact Light & Power
Engineering at (970)221-6700 to initiate the invoice and utility work.
Page 1