HomeMy WebLinkAboutDRAKE CROSSING, SAFEWAY FUEL CENTER - PDP - 35-96D - CORRESPONDENCE - REVISIONSNumber: 17 Created: 5/ 10/2006
[6/ 20/ 06]
[5/ 10/06] The curb stops must be within a utility easement.
The proposed locations of the utility easements for the waterlines and curb stops are shown
on the utility plan schedule note #32. These easements will be finalized by our surveyor
before we go to mylars. These easements will be determined at final compliance.
Number: 47 Created: 6/ 20/ 2006
[6/20/06] Provide a complete set of utility plans for review (including
title sheet and Std Details).
A complete set of utility plans will be provided at final compliance
We trust that this resubmittal satisfactorily addresses the City Staff's comments and
concerns.
Sincerely
Galloway, Romero & Associates
G Z 206L,�
Jo C. Scales
Encl.
CADowments and Seftingsyohn_swles\Local Settings\Temporary Internet Files\OLK270\SA2913-jlf-final compliance response.doc
[6/20/06] Will determine necessary drainage easement locations at
Final Compliance.
Noted. Thank You.
[5/9/06] Any drainage facilities within the site are required to be
included within a drainage easement.
Noted. Thank You.
Number: 11 Created: 5 / 9 / 2006
[6/20/06] Final Compliance item.
[5/9/06] The existing sand and oil separator that is to be abandoned
can remain in place if the manhole is filled with sand and the cone lid
is removed.
Note #30 on the Utility Plan denote the abandonment of the existing sand oil separator.
Number: 46 Created: 6 / 20/ 2006
[6/20/06] Please revise water quality outlet structure per redlines.
Water quality structure has been revised per redlines.
Number: 52 Created: 6 / 23 / 2006
[6/23/06] Stormwater is ready for a hearing.
Noted. Thank You.
Department: Stormwater-Water-Wastewater Issue Contact:
Roger Buffington
Topic: Water/Wastewater
Number: 14 Created: 5 / 10/ 2006
[6/20/06] Revise Note #31 as shown on redlines.
[5/ 10/06] Show existing sewer service from existing car wash and add
notes regarding abandonment.
Schedule note #31 has been revised per redlines.
Number: 16 Created: 5/ 10/2006
[6/20/06] Include a standard detail for traffic rated cleanout. Provide
e-mail address, and we will send City's detail.
The traffic rated cleanout detail (WW-15) has been added to the Detail sheet CU1.3.
[5/ 10/06] Any sewer service clean -outs in drive areas must be traffic
rated. Bring 4-inch cleanout with screw. cap up inside a valve box with
a lid marked "sewer".
Noted. Thank you.
CADomments and Settingsyohn_swles\Local Settings\Temporary Internet Fi1es\OLK27D\SA2913-j1f-fina1 compliance response.doc
symbol in the legend for proposed hydrants needs to be eliminated,
since no hydrants are proposed.
The symbol for existing fire hydrants has been enlarged and the symbol for proposed fire
hydrants has been eliminated from the Utility Plan.
Department: Transportation Planning Issue Contact: Kurt Ravenschlag
Topic: Landscape Plan
Number: 50 Created: 6/21 /2006
[6/21/06] No comments
Department: Stormwater-Water-Wastewater Issue Contact:
Roger Buffington
Topic: Landscape Plan
Number: 48 Created: 6/ 20/ 2006
[6/20/06] Add note regarding landscape separation distances as shown
on red -lined Landscape Plan.
Per redlines the landscape separation distances have been addressed on the Landscape
Plan.
Department: Stormwater-Water-Wastewater Issue Contact:
Wes Lamarque
Topic: Stormwater
Number: 7 Created: 5/9/2006
[6/20/06] No utility plan was received by the Stormwater Utility. Will
review at Final Compliance.
Noted. We will provide one at final compliance.
[5/9/06] Per conceptual review comment, spill containment for the
fuel pump area is required. The City has a standard detail in electronic
form.
A "Spill containment sand oil separator' detail has been added to the Utility Plan. The
standard detail was slightly modified due to surface flow conditions of the site we were
unable to tie storm pipes underground.
Number: 8 Created: 5/9/2006
[6/20/06] Can be resolved at Final Compliance.
[5/9/06] There is an existing pipe outlet into the existing pond/swale
that is in conflict with an existing tree. The tree or the pipe outlet
may need to be removed/moved.
We met with City Forester Tim Buchanan to determine what to do with this tree. He
determined that it was a Peach Tree Willow and that we could remove it if we mitigate 1 tree
equivalent. The tree will be removed and one tree will be added for mitigation.
Number: 10 Created: 5/9/2006
CADo rnents and Settingsyohn_scales\Local Settings\Temporary Internet Files\OLK27D\SA2913-jlf-final wmpliance response.doc
Remove Development Data table, Parking Calculations & Signatures
and Approvals info from cover sheet, this info shall be shown on the
Site Plan.
Info moved to Site Plan.
Add standard City Approval Block to lower right corner of sheet.
Provide City standard indemnification statements to sheet (see
statements attached to redlines).
City approval block and standard indemnification statements have been added to the utility
cover sheet.
Add a secondary benchmark for reference. Add a general notes
reference statement referencing LUCASS general notes (see reference
statement attached to redlines).
Secondary benchmark has been added to both the planning and utility cover sheets. The
LUCASS reference statement has been added to the utility cover sheet.
Topic: Technical Services - Survey
Number: 22
[6/ 13/06] No comments
[5/ 12/06] No comments
Department: Light & Power
Topic: Electric utility
Number: 40
[6/ 14/06] No Comment
Created: 5 / 12 / 2006
Issue Contact: Bruce Vogel
Created: 6/ 14/2006
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 19 Created: 5/ 10/2006
[6/ 22 / 06]
[5/ 10/06] Contractor(s) are required to get permits from the Poudre
Fire Authority (PFA) before removing the old fuel -storage tanks and
installing the new tanks.
This has been noted on the utility plan sheet CU1.1, under "Utility Notes" #14.
Number: 21 Created: 5/ 10/2006
[6/22/06]
[5/ 10/06] PFA charges fees for plan review and installation. For more
information please contact Carie Dann at the PFA, 416-2869.
Noted. Thank You.
Number: 51 Created: 6/ 22 / 2006
[6/22/061 FIRE HYDRANTS: The symbol for existing fire hydrants
needs to be larger, so the hydrant locations are easier to find. Also, the
CADocements and Set ingsyohn_scales\Local Settings\Temporary Internet Files\OLKVD\SA2913-jlf-final compliance response.doc
Topic: Site Plan - Alta Survey
Number: 41 Created: 6/ 15/ 2006
[6/ 15/06] These comments relate to the Site Plan only because
Current Planning has no real interest in the ALTA/ACSM Land Title
Survey.
a. There is some confusion about the Cover Sheet (CS1.0), as re-
submitted. Is it intended to be the cover sheet for the Site, Landscape,
Building Elevations, and Lighting Plans set; or, the cover sheet for the
Utility Plans set? The answer to this question is important because it
helps determine what information and signature blocks are needed on
the cover sheet. Please see the red -lined copy of this sheet that is
being forwarded to you.
There are now two cover sheets, one for Planning and one for Utilities. Each cover sheet
has its own signature block and sheet index.
b. A Vicinity Map must be included on Sheet CS1.1. Also, a north arrow
and scale must be included on this sheet.
Site Plan has been revised to include a vicinity map, north arrow, and scale.
c. The UTILITY PLAN APPROVAL block should not be on sheet CS1.1
and should be removed.
Utility Plan Approval block has been removed from the Site Plan.
There are numerous items listed in the SITE LEGEND on Sheet CS1.1
that do not appear on the plan, are not needed on the plan, or are not
consistent with the plan. Please see the red -lined copy of this sheet
that is being forwarded to you.
Items that are in the legend and do not appear on the plan have been removed.
Department: Engineering Issue Contact: Randy Maizland
Topic: General
Number: 3 Created: 5/8/2006
[6/ 13/06] Cover sheet still needs to show a secondary benchmark (per
LCUASS) and Appendix E General Notes or General Notes reference
note attached to the red -lined set.
A secondary benchmark and the General Notes reference note have been added to the
Utility cover sheet.
[5/8/06] Cover Sheet Comments: Add month and year under title at
top of sheet.
Month and year have been added to the planning and utility cover sheets.
CADowments and Settings\john_scales\Local Settings\Temporary Internet Fi1es\0LK27D\SA2913-j1f-fina1 compliance response.doc
Noted. Thank You.
Topic: Landscape Plan
Number: 42 Created: 6/ 15/2006
[6/ 15/06] The following comments relate to Sheet L1.1, the Landscape
Plan:
a. There 2 separate LANDSCAPE LEGENDS on the Landscape Plan. One
appears to reference proposed plant materials and one appears to
reference existing plant materials. Probably they should be labeled as
such.
This has been revised to show both an existing and proposed plant materials legend.
b. There appear to be some discrepancies between plant material
quantities in the PLANT SCHEDULE and what are actually shown on
the plan. Please see the red -lined plan that is being forwarded to you.
Quantities have been revised according to redlines so that the number of plants in the
drawings match the number of plants listed in the PLANT SCHEDULE.
c. A north arrow and scale are needed on the plan.
North arrow and scale has been placed on the plan.
d. There are several plant material symbols in the LANDSCAPE
LEGENDS that do not appear to be on the plan. If this is the case then
they should be removed. Please see the red -lined plan that is being
forwarded to you.
Plant material symbols that have not been used in the Landscape Plan have been removed
from the Landscape Legends.
e. There are possibly 2 areas along the east - northeast side of the
vehicular use & canopy area, where the existing Siberian Elm trees are
to be removed, that need additional plant materials for screening of
this area from the adjacent streets. This could be done with additional
evergreen trees or shrubs that would satisfy the requirement set forth
in Section 3.2.1(E)(4)(b) of the Land Use Code.
3 additional "Sea Green Junipers" have been added for additional screening in this area.
Topic: Lighting Plan
Number: 45 Created: 6/ 15/2006
[6/ 15/06] No additional comments on the Lighting Plan, Sheet CU1.2.
Noted. Thank You.
C1Documents and Settingsyohn_scales\Local Settings\Temporary Internet Fi1es\0LK27D\SA2913-j1f-fina1 compliance response.doc
T, Galloway, Romero & Associates
W Design Engineering Planning
5350 DTC Parkway
Greenwood Village, Colorado 80111-3006
(303) 770-88&
(303) 770-3636 fax
E-mail: john_scales@graa.com
August 22, 2006
Steve Olt
City of Fort Collins Current Planning Department
281 North College Avenue
P. O. Box 580
Fort Collins, CO 80522-0580
Re: Safeway Fuel Facility — Final Compliance Submittal
Drake Crossing Shopping Center
Fort Collins, CO
Response to June 29, 2006 Review Comments
Dear Mr. Olt:
Please accept this Final Compliance Submittal for the Safeway Fuel Facility referenced
above. The plans included in this submittal have been revised to address the review
comments contained within the Staff Project Review dated 6/29/2006. The following
are itemized responses corresponding to the Staff's review comments. Your comments
are in bold and our responses are in italics.
1. Current Planning:
Department: Current Planning Issue Contact: Steve Olt
Topic: Building Elevations
Number: 43 Created: 6/ 15/2006
[6/ 15/061 The Canopy Elevations, Sheet 1 of 2, look good. The
reference to "and Monument Sign" in the Sheet Title should be
removed since the monument sign detail is no longer on the sheet. I
have noted on this plan that the mechanical elements on the West
Elevation must be painted to match the building colors. This
requirement actually is already taken care of on Sheet 2 of 2, the
Convenience Store and Car Wash Elevations.
"and Monument Sign" has been removed from the title block. We will continue to note that
the mechanical elements on the west elevation must be painted to match the building
colors.
Number: 44 Created: 6/ 15/2006
[6/15/061 There are no comments on Sheet 2 Of 2, the Convenience
Store and Car Wash Elevations. Nice looking building, consistent with
the Safeway Supermarket building.