HomeMy WebLinkAboutSPRING CREEK PLACE (FORMERLY STATION, 2105 S. COLLEGE AVE.) - PDP - PDP160020 - CORRESPONDENCE -Comment Number: 13 Comment Originated: 10/18/2016 10/18/2016: It looks like there will be a utility conflict at the proposed sanitary sewer service and 18" storm sewer coming into the underground detention vault. Ok to address at Final. Topic: Plat Comment Number: 8 Comment Originated: 07/19/2016 10/18/2016: Anew waterline easement is shown, but needs to be 20' total width (10' either side of the centerline of the waterline). Please review previous comment on this. 09/01 /2016: The response to this comment is not sufficient. Since the location of the waterline is not centered in the easement and since it's not clear how wide the easement is, a new one will need to be dedicated with this plat. 07/19/2016: Please dedicate a utility easement for the existing waterline. ThE easement should be 10' on either side of the waterline, approximately 20' in width through the parcel included in this plat. 7 Department: Traffic Opb, ation Contact: Nicole Hahn, 970-221-6820, Topic: General Comment Number: 2 nhahn@fcgov.com Comment Originated: 08/02/2016 08/02/2016: We will have to work with you as you develop your landscape plans to ensure there is good sight distance at the entry to the garage. The opposing off set through traffic adds some complexity to this movement, and we want to make this area as visible as possible. Topic: Traffic Impact Study Comment Number: 1 Comment Originated: 08/02/2016 08/02/2016: The Fort Collins multimodal transportation level of service was not addressed in the study. This can be found in Appendix H in LCUASS. An addendum memo with a narrative related to the multimodal LOS can be submitted as a supplement to the traffic study. Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson@fcgov.com Topic: General Comment Number: 1 Comment Originated: 07/25/2016 07/25/2016: Irrigation plans are required no later than at the time of building permit. The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson@fcgov.com Department: Water -Wastewater Engineering Contact: Heather McDowell, 970-224-6065, hmcdowell@fcqov.com Topic: Construction Drawings Comment Number: 2 Comment Originated: 07/19/2016 07/19/2016: The Utility Department recommends conducting afire flow test, during the course of design, on the existing 6" waterline that this site is proposing to tap into to verify that adequate fire flows are available in this location. If there are not adequate fire flows at this location, this project will be responsible to upsize the main to the extents required to achieve required fire flows. Comment Number: 6 Comment Originated: 07/19/2016 09/01/2016: Please note that it appears as though at least one of the buildings gets its sanitary sewer service from a manhole that is quite a ways offsite, so the extents of your limits of disturbance may be more than you currently anticipate and you may need permission to enter adjacent property to do demolition work if an easement doesn't already exist. 07/19/2016: The existing sewer and water services to the existing buildings will need to be identified and shown on a demo plan. The demo plan should then clearly show which services will need to be removed and abandoned at the main. 111 PROJECT DA) uM: NAVD88 BENCHMARK # w/ DESCRIPTION ELEVATION: BENCHMARK # w/ DESCRIPTION ELEVATION: PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - X.XX'. Comment Number: 45 Comment Originated: 10/21/2016 10/21/2016: There are spelling issues. See redlines. Comment Number: 46 Comment Originated: 10/21/2016 10/21/2016: Please provide easement widths as marked. See redlines. Comment Number: 47 Comment Originated: 10/21/2016 10/21/2016: Please correct the sheet numbering. See redlines. Comment Number: 48 Comment Originated: 10/21/2016 10/21/2016: Please clarify easement widths as marked. See redlines. Comment Number: 49 Comment Originated: 10/21/2016 10/21/2016: For clarification, make the easement line as marked the same line type as the 20' Emergency Access Easement. See redlines. Topic: Site Plan Comment Number: 14 Comment Originated: 07/25/2016 10/21/2016: This has not been corrected. 09/07/2016: There are still some rights of way not shown that are on the Plat. Please show all with correct labels, or remove them all. 07/25/2016: Some of the right of way descriptions shown are incorrect. If they are going to stay on the plan, they should match what is shown on the Subdivision Plat. Comment Number: 15 Comment Originated: 07/25/2016 10/21/2016: This has not been corrected. 09/07/2016: There are still some easements not shown that are on the Plat. Please show all with correct labels, or remove them all. 07/25/2016: Some of the easement descriptions shown are incorrect. If they are going to stay on the plan, they should match what is shown on the Subdivision Plat. Comment Number: 50 Comment Originated: 10/21/2016 10/21/2016: There are line over text issues. See redlines. 7 DATUM. SUK .jUNDING DEVELOPMENTS HAVE USED 1.46029 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - X.XX�. Comment Number: 25 Comment Originated: 07/25/2016 10/21/2016: The Basis of Bearings for the Spring Creek Place plat must alsc be included. 09/07/2016: The Basis Of Bearings & property boundary needs to match the Subdivision Plat. If you choose to keep the current Basis Of Bearings & boundary information on the plans, they must be shown as record bearings & distances per the document they are referencing. 07/25/2016: The Basis Of Bearings statement should match the Subdivision Plat. Comment Number: 28 Comment Originated: 07/25/2016 10/21/2016: This has not been corrected. 09/07/2016: There are still some easements not shown that are on the Plat. Please show all with correct labels, or remove them all. 07/25/2016: Some of the easement descriptions shown are incorrect. If they are going to stay on the plan, they should match what is shown on the Subdivision Plat. Comment Number: 41 10/21/2016: This has not been corrected. 09/07/2016: There are spelling issues. See redlines. Topic: Lighting Plan Comment Number: 39 Comment Originated: 09/07/2016 Comment Originated: 09/07/2016 10/21/2016: No plans were provided for review, so we cannot verify this was addressed. 09/07/2016: Please remove "Bankcenter Square Second Filing" from the sub -title of all sheets. See redlines. Topic: Plat Comment Number: 31 Comment Originated: 09/06/2016 10/21/2016: This has not been addressed. 09/06/2016: Please clarify the dimensioning along the east line of the property. See redlines. Comment Number: 42 Comment Originated: 10/21/2016 10/21/2016: Please change the title in the Statement Of Ownership And Subdivision as marked. See redlines. Comment Number: 43 Comment Originated: 10/21/2016 10/21/2016: Please add bearings and distances as marked. See redlines. Comment Number: 44 Comment Originated: 10/21/2016 10/21/2016: Please make changes to note #9 and add notations as marked. Please provide the following information for the Benchmark Statement in the EXACT format shown below. A Comment Number: 27 Cu-anent Originated: 10/19/2016 10/19/2016: The architectural elevations have been improved, particularly on the north and south. In addition, the details associated with the south walkway have been enhanced and clarified. Thank you for responding to our comments from last round. Staff has one more remaining comment about one architectural detail that needs clarification. On the Perspective Rendering — South Fagade, on the second floor of a projecting module, there is a haunch detail that frames the window and supports a projecting window header. This is a very nice detail that we would like to see repeated symmetrically. But, it's not clear if this detail is repeated horizontally or vertically. Please clarify. Department: Stormwater Engineering Contact: Basil Harridan, 970-224-6035, bhamdan@fcgov.com Topic: Erosion Control Comment Number: 17 Comment Originated: 08/01/2016 08/01 /2016: No Erosion Control Plans or Report were submitted as part of this original submittal. These will need to be provided and ESC issues should be addressed at an FDP level submittal. Department: Technical Services Contact: Jeff County, 970-221-6588, icounty@fcgov.com Topic: Building Elevations Comment Number: 19 10/21/2016: There are line over text issues. See redlines. 09/07/2016: There are line over text issues. See redlines. 07/25/2016: There are line over text issues. See redlines. Topic: Construction Drawings Comment Number: 24 Comment Originated: 07/25/2016 Comment Originated: 07/25/2016 10/21/2016: The benchmark referenced has been reset during bridge work. Please verify your local control against another City benchmark. You must provide a second City benchmark to the Benchmark Statement. 09/07/2016: The benchmark referenced is not in our vertical control network, or one that we are familiar with. Please use a benchmark that is in our network. 07/25/2016: The City has moved to the NAVD88 vertical datum, and as of January 1, 2015, all projects are required to be on NAVD88 datum. Please provide the following information for the Benchmark Statement in the EXACT format shown below. PROJECT DATUM: NAVD88 BENCHMARK # w/ DESCRIPTION ELEVATION: BENCHMARK # w/ DESCRIPTION ELEVATION: PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL 5 Department: PFA Contact: Jim Lynxwiler, Topic: General 970-416-286% mlynxwiler@poudre-fire.org Comment Number: 3 Comment Originated: 07/08/2016 07/08/2016: FIRE LANE CONNECTION TO THE MAX TRANSIT LINE > The proposed fire lane connection to the Max Transit line will have to be approved by the City Transportation Department and Poudre Fire Authority. Currently, the connection point is undersized at approximately 8'. Any gate design less than 20' width will require approval by the fire marshal, but shall be no less than 16' wide. Turning radii may need to be adjusted so as to allow full vehicle movement. > In addition, the connection will require an approved electric, functioning gate for emergency access only. The opening mechanism should comply with existing Max corridor access standards although an Opticom function may also be warranted. Further discussion will be needed. Comment Number: 8 Comment Originated: 10/19/2016 10/19/2016: FIRE LANE SIGNS The limits of the fire lane shall be fully defined and sign locations labeled on plans by time of FDP approval. Comment Number: 9 Comment Originated: 10/19/2016 10/19/2016: EMERGENCY ACCESS EASEMENT The limits of the fire lane shall be labeled on the Site Plan as an Emergency Access Easement (EAE). Department: Planning Services Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com Topic: General Comment Number: 8 Comment Originated: 08/03/2016 08/03/2016: Standard notes will be provided to be added to the Site Plan. Carried Over: For note number 12, please add ...to concrete and not interfere with walkways or landscaping. Comment Number: 26 Comment Originated: 09/07/2016 09/07/2016: On the west elevation, the architectural elevations indicate that there are to be screen walls in front of the mesh screens of the parking garage. Please indicate the height of the screen wall. Is the landscaping shown to be planted on top of the screen wall? l6m not seeing how the screen wall and landscaping are integrated. Perhaps a detail would help. Carried Over: 10/19/2016 - The Plant Schedule indicates that there will Virginia Creeper but the Landscape Plan is not clear where these will be planted. Be sure that the screen walls include the climbing vine as indicated in the response letter. Also, be sure that there is sufficient planting area and irrigation. 4 Department: Light And Power Contact: Coy Althoff, , CAlthoff@fcgov.com Topic: General Comment Number: 1 Comment Originated: 07/29/2016: Both single phase & 3-phase power facilities are running along the south and the west side of the property lines. Comment Number: 2 Comment Originated: 07/29/2016: Electric Capacity Fee, Building Site charges and any system modification charges necessary will apply to this project. Comment Number: 3 07/29/2016 07/29/2016 Comment Originated: 07/29/2016 07/29/2016: Contact Light and Power Engineering to coordinate the transformer and electric meter locations, please show the locations on the utility plans. *'*Please note that minimum clearances around transformers are 3' around the back and sides and 8' clearance from the front.*" Comment Number: 4 Comment Originated: 07/29/2016 07/29/2016: Multi -family buildings are treated as commercial services; therefore a(C-1) form must be filled out and submitted to Light & Power Engineering. All secondary electric service work is the responsibility of the developer and their electrical consultant or contractor. Please provide a one line diagram and a C-1 form to Light and Power Engineering. The C-1 form can be found at: http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf Comment Number: 5 Comment Originated: 07/29/2016 07/29/2016: You may contact FCU Light & Power, project engineering if you have questions. (970) 221-6700. Please also reference our Electric Services Standards (ESS) document at the following link. http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar ds_FI NAL_17J une2016.pdf Comment Number: 6 Comment Originated: 07/29/2016 07/29/2016: Please contact Light & Power Engineering if you have any questions at 221-6700. Please reference our policies, development charge processes, and use our fee estimator at http://www.fcgov.com/utilities/business/builders-and-developers. Comment Number: 7 Comment Originated: 09/06/2016 09/06/2016: The storage unit and cell tower properties to the north of this project will likely need to be re -fed from a different direction and possibly with their own dedicated transformer. System modification charges will apply and it will likely be necessary that this project dedicates a new utility easement for that effort. Comment Number: B Comment Originated: 10/19/2016 10/19/2016: No changes on behalf of Light & Power at this time. Please continue communicating with us regarding changes, questions or concerns. 3 Comment Number: 9 Comment Originated: 08/30/2016 10/19/2016: Please see redlines. 08/30/2016: There needs to be an access easement for the drive connection to the whole foods site along the driveway within the property. The portion of the multi -use path to the south that deviates from the direct path will also need to be included in an access easement. Please verify with Utilities which portions of the water services need to be within a Utility Easement. Comment Number: 11 Comment Originated: 08/30/2016 10/19/2016: Add a note that this easement will be vacated by separate document. 08/30/2016: Is there a reason the 12' Utility Easement running through the property can't be vacated via the Plat? Is this a private easement or an easement that wasn't originally dedicated to the City? Comment Number: 13 Comment Originated: 10/19/2016 10/19/2016: Label the waterline easement as a Utility Easement. Comment Number: 14 Comment Originated: 10/19/2016 10/19/2016: The MAX guideway can't be used for fire access. The current lease with the City does not allow for emergency access to sites along the Corridor and the City is not going to be negotiating a new lease to include this use. Please work with PFA to meet fire access needs. Department: Environmental Planning Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com Topic: Landscape Plans Comment Number: 8 Comment Originated: 10/18/2016 10/18/2016: Landscape plan updates look good and specifically the addition of 5 gallon shrubs to be planted. Staff highly suggest keeping a very close eye on installation so that 5 gallon shrubs are indeed installed according to approved plans (and not 1 or 2 gallon shrubs used as last minute and/or lower cost solutions). This will help avoid any potential zoning violations down the road. Comment Number: 9 Comment Originated: 10/18/2016 10/18/2016: Native seed mixes look good. May need to add additional specifications for proper application by Final Plan. The following will be imperative to proper establishment of the native seed areas: 1) Seeding at the appropriate time of season and prior to rainfall or snowfall (or temporary non-timed/regular irrigation used) 2) Appropriate depth of seed planting (not too deep) 3) Active weed management especially in the first growing season. 4) Re -seeding as necessary 5) No mowing lower than 6 inches in height especially within first growing season (give the wildflowers a chance to grow and out -compete the weeds rather than working to pull or chemically spray the weeds) Appropriate installation and maintenance of the native seed areas is critical and will help avoid any potential zoning violations down the line. P Fort Collins Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov. com/de velopmenfreview October 21, 2016 Don Berland BERLAND DEVELOPMENT GROUP, INC 13394 E CONTROL TOWER RD Englewood, CO 80112 RE: Spring Creek Place, PDP160020, Round Number 3 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Ted Shepard, at 970-221-6343ortshepard@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com Topic: General Comment Number: 5 Comment Originated: 08/01/2016 08/30/2016: Detail will be needed at final on the offsite improvements to the south as well as the sidewalk connections to the MAX Station. (Curb/driveway removal, etc) 08/01/2016: More information is needed for the two sidewalks connecting to the MAX station. It appears that these walks will be crossing the existing drive aisle. Will this development propose removing the access? Based on existing conditions, ramps will be needed to get to the MAX station. Comment Number: 6 Comment Originated: 08/01/2016 08/30/2016: A letter of intent from the whole foods site will be needed prior to hearing. This offsite easement will be needed to be dedicated to the City and follow the City's easement dedication process. This easement will need to be shown on the plat as well. 08/01/2016: An offsite access easement will be needed to connect to the whole foods site to the south. This agreement will be needed prior to hearing.