HomeMy WebLinkAboutSPRING CREEK PLACE (FORMERLY STATION, 2105 S. COLLEGE AVE.) - PDP - PDP160020 - CORRESPONDENCE -Comment Number: 13
Comment Originated: 10/18/2016
10/18/2016: It looks like there will be a utility conflict at the proposed sanitary
sewer service and 18" storm sewer coming into the underground detention
vault. Ok to address at Final.
Topic: Plat
Comment Number: 8
Comment Originated: 07/19/2016
10/18/2016: Anew waterline easement is shown, but needs to be 20' total
width (10' either side of the centerline of the waterline). Please review previous
comment on this.
09/01 /2016: The response to this comment is not sufficient. Since the location
of the waterline is not centered in the easement and since it's not clear how
wide the easement is, a new one will need to be dedicated with this plat.
07/19/2016: Please dedicate a utility easement for the existing waterline. ThE
easement should be 10' on either side of the waterline, approximately 20' in
width through the parcel included in this plat.
7
Department: Traffic Opb, ation
Contact: Nicole Hahn, 970-221-6820,
Topic: General
Comment Number: 2
nhahn@fcgov.com
Comment Originated: 08/02/2016
08/02/2016: We will have to work with you as you develop your landscape
plans to ensure there is good sight distance at the entry to the garage. The
opposing off set through traffic adds some complexity to this movement, and we
want to make this area as visible as possible.
Topic: Traffic Impact Study
Comment Number: 1
Comment Originated: 08/02/2016
08/02/2016: The Fort Collins multimodal transportation level of service was not
addressed in the study. This can be found in Appendix H in LCUASS.
An addendum memo with a narrative related to the multimodal LOS can be
submitted as a supplement to the traffic study.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 07/25/2016
07/25/2016: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Water -Wastewater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcqov.com
Topic: Construction Drawings
Comment Number: 2
Comment Originated: 07/19/2016
07/19/2016: The Utility Department recommends conducting afire flow test,
during the course of design, on the existing 6" waterline that this site is
proposing to tap into to verify that adequate fire flows are available in this
location. If there are not adequate fire flows at this location, this project will be
responsible to upsize the main to the extents required to achieve required fire
flows.
Comment Number: 6
Comment Originated: 07/19/2016
09/01/2016: Please note that it appears as though at least one of the buildings
gets its sanitary sewer service from a manhole that is quite a ways offsite, so
the extents of your limits of disturbance may be more than you currently
anticipate and you may need permission to enter adjacent property to do
demolition work if an easement doesn't already exist.
07/19/2016: The existing sewer and water services to the existing buildings will
need to be identified and shown on a demo plan. The demo plan should then
clearly show which services will need to be removed and abandoned at the
main.
111
PROJECT DA) uM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX'.
Comment Number: 45 Comment Originated:
10/21/2016
10/21/2016: There are spelling issues. See redlines.
Comment Number: 46 Comment Originated:
10/21/2016
10/21/2016: Please provide easement widths as marked. See redlines.
Comment Number: 47 Comment Originated:
10/21/2016
10/21/2016: Please correct the sheet numbering. See redlines.
Comment Number: 48 Comment Originated:
10/21/2016
10/21/2016: Please clarify easement widths as marked. See redlines.
Comment Number: 49 Comment Originated: 10/21/2016
10/21/2016: For clarification, make the easement line as marked the same line
type as the 20' Emergency Access Easement. See redlines.
Topic: Site Plan
Comment Number: 14
Comment Originated: 07/25/2016
10/21/2016: This has not been corrected.
09/07/2016: There are still some rights of way not shown that are on the Plat.
Please show all with correct labels, or remove them all.
07/25/2016: Some of the right of way descriptions shown are incorrect. If they
are going to stay on the plan, they should match what is shown on the
Subdivision Plat.
Comment Number: 15
Comment Originated: 07/25/2016
10/21/2016: This has not been corrected.
09/07/2016: There are still some easements not shown that are on the Plat.
Please show all with correct labels, or remove them all.
07/25/2016: Some of the easement descriptions shown are incorrect. If they
are going to stay on the plan, they should match what is shown on the
Subdivision Plat.
Comment Number: 50 Comment Originated: 10/21/2016
10/21/2016: There are line over text issues. See redlines.
7
DATUM. SUK .jUNDING DEVELOPMENTS HAVE USED 1.46029
UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX�.
Comment Number: 25
Comment Originated: 07/25/2016
10/21/2016: The Basis of Bearings for the Spring Creek Place plat must alsc
be included.
09/07/2016: The Basis Of Bearings & property boundary needs to match the
Subdivision Plat. If you choose to keep the current Basis Of Bearings &
boundary information on the plans, they must be shown as record bearings &
distances per the document they are referencing.
07/25/2016: The Basis Of Bearings statement should match the Subdivision
Plat.
Comment Number: 28
Comment Originated: 07/25/2016
10/21/2016: This has not been corrected.
09/07/2016: There are still some easements not shown that are on the Plat.
Please show all with correct labels, or remove them all.
07/25/2016: Some of the easement descriptions shown are incorrect. If they
are going to stay on the plan, they should match what is shown on the
Subdivision Plat.
Comment Number: 41
10/21/2016: This has not been corrected.
09/07/2016: There are spelling issues. See redlines.
Topic: Lighting Plan
Comment Number: 39
Comment Originated: 09/07/2016
Comment Originated: 09/07/2016
10/21/2016: No plans were provided for review, so we cannot verify this was
addressed.
09/07/2016: Please remove "Bankcenter Square Second Filing" from the
sub -title of all sheets. See redlines.
Topic: Plat
Comment Number: 31 Comment Originated: 09/06/2016
10/21/2016: This has not been addressed.
09/06/2016: Please clarify the dimensioning along the east line of the property.
See redlines.
Comment Number: 42
Comment Originated: 10/21/2016
10/21/2016: Please change the title in the Statement Of Ownership And
Subdivision as marked. See redlines.
Comment Number: 43 Comment Originated: 10/21/2016
10/21/2016: Please add bearings and distances as marked. See redlines.
Comment Number: 44 Comment Originated: 10/21/2016
10/21/2016: Please make changes to note #9 and add notations as marked.
Please provide the following information for the Benchmark Statement in the
EXACT format shown below.
A
Comment Number: 27
Cu-anent Originated: 10/19/2016
10/19/2016: The architectural elevations have been improved, particularly on
the north and south. In addition, the details associated with the south walkway
have been enhanced and clarified. Thank you for responding to our comments
from last round. Staff has one more remaining comment about one architectural
detail that needs clarification. On the Perspective Rendering — South Fagade,
on the second floor of a projecting module, there is a haunch detail that frames
the window and supports a projecting window header. This is a very nice detail
that we would like to see repeated symmetrically. But, it's not clear if this detail
is repeated horizontally or vertically. Please clarify.
Department: Stormwater Engineering
Contact: Basil Harridan, 970-224-6035, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 17 Comment Originated: 08/01/2016
08/01 /2016: No Erosion Control Plans or Report were submitted as part of this
original submittal. These will need to be provided and ESC issues should be
addressed at an FDP level submittal.
Department: Technical Services
Contact: Jeff County, 970-221-6588, icounty@fcgov.com
Topic: Building Elevations
Comment Number: 19
10/21/2016: There are line over text issues. See redlines.
09/07/2016: There are line over text issues. See redlines.
07/25/2016: There are line over text issues. See redlines.
Topic: Construction Drawings
Comment Number: 24
Comment Originated: 07/25/2016
Comment Originated: 07/25/2016
10/21/2016: The benchmark referenced has been reset during bridge work.
Please verify your local control against another City benchmark. You must
provide a second City benchmark to the Benchmark Statement.
09/07/2016: The benchmark referenced is not in our vertical control network, or
one that we are familiar with. Please use a benchmark that is in our network.
07/25/2016: The City has moved to the NAVD88 vertical datum, and as of
January 1, 2015, all projects are required to be on NAVD88 datum. Please
provide the following information for the Benchmark Statement in the EXACT
format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
5
Department: PFA
Contact: Jim Lynxwiler,
Topic: General
970-416-286% mlynxwiler@poudre-fire.org
Comment Number: 3
Comment Originated: 07/08/2016
07/08/2016: FIRE LANE CONNECTION TO THE MAX TRANSIT LINE
> The proposed fire lane connection to the Max Transit line will have to be
approved by the City Transportation Department and Poudre Fire Authority.
Currently, the connection point is undersized at approximately 8'. Any gate
design less than 20' width will require approval by the fire marshal, but shall be
no less than 16' wide. Turning radii may need to be adjusted so as to allow full
vehicle movement.
> In addition, the connection will require an approved electric, functioning gate
for emergency access only. The opening mechanism should comply with
existing Max corridor access standards although an Opticom function may also
be warranted. Further discussion will be needed.
Comment Number: 8
Comment Originated: 10/19/2016
10/19/2016: FIRE LANE SIGNS
The limits of the fire lane shall be fully defined and sign locations labeled on
plans by time of FDP approval.
Comment Number: 9 Comment Originated: 10/19/2016
10/19/2016: EMERGENCY ACCESS EASEMENT
The limits of the fire lane shall be labeled on the Site Plan as an Emergency
Access Easement (EAE).
Department: Planning Services
Contact: Ted Shepard, 970-221-6343, tshepard@fcgov.com
Topic: General
Comment Number: 8 Comment Originated: 08/03/2016
08/03/2016: Standard notes will be provided to be added to the Site Plan.
Carried Over: For note number 12, please add ...to concrete and not interfere
with walkways or landscaping.
Comment Number: 26
Comment Originated: 09/07/2016
09/07/2016: On the west elevation, the architectural elevations indicate that
there are to be screen walls in front of the mesh screens of the parking garage.
Please indicate the height of the screen wall. Is the landscaping shown to be
planted on top of the screen wall? l6m not seeing how the screen wall and
landscaping are integrated. Perhaps a detail would help.
Carried Over: 10/19/2016 - The Plant Schedule indicates that there will Virginia
Creeper but the Landscape Plan is not clear where these will be planted. Be
sure that the screen walls include the climbing vine as indicated in the response
letter. Also, be sure that there is sufficient planting area and irrigation.
4
Department: Light And Power
Contact: Coy Althoff, , CAlthoff@fcgov.com
Topic: General
Comment Number: 1 Comment Originated:
07/29/2016: Both single phase & 3-phase power facilities are running along the
south and the west side of the property lines.
Comment Number: 2 Comment Originated:
07/29/2016: Electric Capacity Fee, Building Site charges and any system
modification charges necessary will apply to this project.
Comment Number: 3
07/29/2016
07/29/2016
Comment Originated: 07/29/2016
07/29/2016: Contact Light and Power Engineering to coordinate the
transformer and electric meter locations, please show the locations on the utility
plans. *'*Please note that minimum clearances around transformers are 3'
around the back and sides and 8' clearance from the front.*"
Comment Number: 4
Comment Originated: 07/29/2016
07/29/2016: Multi -family buildings are treated as commercial services;
therefore a(C-1) form must be filled out and submitted to Light & Power
Engineering. All secondary electric service work is the responsibility of the
developer and their electrical consultant or contractor.
Please provide a one line diagram and a C-1 form to Light and Power
Engineering. The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf
Comment Number: 5 Comment Originated: 07/29/2016
07/29/2016: You may contact FCU Light & Power, project engineering if you
have questions. (970) 221-6700. Please also reference our Electric Services
Standards (ESS) document at the following link.
http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar
ds_FI NAL_17J une2016.pdf
Comment Number: 6 Comment Originated: 07/29/2016
07/29/2016: Please contact Light & Power Engineering if you have any
questions at 221-6700. Please reference our policies, development charge
processes, and use our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers.
Comment Number: 7
Comment Originated: 09/06/2016
09/06/2016: The storage unit and cell tower properties to the north of this
project will likely need to be re -fed from a different direction and possibly with
their own dedicated transformer. System modification charges will apply and it
will likely be necessary that this project dedicates a new utility easement for that
effort.
Comment Number: B
Comment Originated: 10/19/2016
10/19/2016: No changes on behalf of Light & Power at this time. Please
continue communicating with us regarding changes, questions or concerns.
3
Comment Number: 9
Comment Originated: 08/30/2016
10/19/2016: Please see redlines.
08/30/2016: There needs to be an access easement for the drive connection to
the whole foods site along the driveway within the property. The portion of the
multi -use path to the south that deviates from the direct path will also need to be
included in an access easement. Please verify with Utilities which portions of
the water services need to be within a Utility Easement.
Comment Number: 11
Comment Originated: 08/30/2016
10/19/2016: Add a note that this easement will be vacated by separate
document.
08/30/2016: Is there a reason the 12' Utility Easement running through the
property can't be vacated via the Plat? Is this a private easement or an
easement that wasn't originally dedicated to the City?
Comment Number: 13 Comment Originated: 10/19/2016
10/19/2016: Label the waterline easement as a Utility Easement.
Comment Number: 14
Comment Originated: 10/19/2016
10/19/2016: The MAX guideway can't be used for fire access. The current
lease with the City does not allow for emergency access to sites along the
Corridor and the City is not going to be negotiating a new lease to include this
use. Please work with PFA to meet fire access needs.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: Landscape Plans
Comment Number: 8
Comment Originated: 10/18/2016
10/18/2016: Landscape plan updates look good and specifically the addition of
5 gallon shrubs to be planted. Staff highly suggest keeping a very close eye on
installation so that 5 gallon shrubs are indeed installed according to approved
plans (and not 1 or 2 gallon shrubs used as last minute and/or lower cost
solutions). This will help avoid any potential zoning violations down the road.
Comment Number: 9
Comment Originated: 10/18/2016
10/18/2016: Native seed mixes look good. May need to add additional
specifications for proper application by Final Plan. The following will be
imperative to proper establishment of the native seed areas:
1) Seeding at the appropriate time of season and prior to rainfall or snowfall (or
temporary non-timed/regular irrigation used)
2) Appropriate depth of seed planting (not too deep)
3) Active weed management especially in the first growing season.
4) Re -seeding as necessary
5) No mowing lower than 6 inches in height especially within first growing
season (give the wildflowers a chance to grow and out -compete the weeds
rather than working to pull or chemically spray the weeds)
Appropriate installation and maintenance of the native seed areas is critical and
will help avoid any potential zoning violations down the line.
P
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov. com/de velopmenfreview
October 21, 2016
Don Berland
BERLAND DEVELOPMENT GROUP, INC
13394 E CONTROL TOWER RD
Englewood, CO 80112
RE: Spring Creek Place, PDP160020, Round Number 3
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Ted Shepard, at 970-221-6343ortshepard@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com
Topic: General
Comment Number: 5
Comment Originated: 08/01/2016
08/30/2016: Detail will be needed at final on the offsite improvements to the
south as well as the sidewalk connections to the MAX Station. (Curb/driveway
removal, etc)
08/01/2016: More information is needed for the two sidewalks connecting to
the MAX station. It appears that these walks will be crossing the existing drive
aisle. Will this development propose removing the access? Based on existing
conditions, ramps will be needed to get to the MAX station.
Comment Number: 6 Comment Originated: 08/01/2016
08/30/2016: A letter of intent from the whole foods site will be needed prior to
hearing. This offsite easement will be needed to be dedicated to the City and
follow the City's easement dedication process. This easement will need to be
shown on the plat as well.
08/01/2016: An offsite access easement will be needed to connect to the
whole foods site to the south. This agreement will be needed prior to hearing.