Loading...
HomeMy WebLinkAboutDRAKE CROSSING, SAFEWAY FUEL CENTER - PDP - 35-96D - CORRESPONDENCE - REVISIONS (3)We trust that this resubmittal satisfactorily addresses the City Staff's comments and concerns. Sincerely Galloway, Romero & Associates n C. Scales Encl. F:\SAFEWAY1SA2913-Taft & Drake\doc\SA2913-jcs-2nd submittal response.doc 4. PFA: No. 19: Comment noted, no revision required. No. 20: Comment noted, no revision required. No. 21: Comment noted, no revision required. 5. Traffic Operations: No. 1: Comment noted, no revision required. 6. Stormwater — Water — Wastewater: No. 6: A water quality structure has been added at the existing detention pond. No. 7: A spill containment system has been added to the Utility Plan. No. 8: We are waiting to hear back from the City Forester, Mr. Tim Buchanan, to determine if the existing tree can be removed and / or mitigated. No. 9: A Drainage Report Letter is included in this resubmittal. No. 10: Once City staff has approved the Site and Utility design, all necessary easements will be finalized. No. 11: Revised, please see Schedule #30 on the Utility Plan. No. 12: A second water tap has been added. No. 13: There are two (2) sand / oil interceptors on the carwash drain line. No. 14: Please see Schedule #31 on the Utility Plan. No. 15: No surface / roof drains connect to the sanitary sewer system. No. 16: Please see Schedule #10 on the Utility Plan. No. 17: Please see response No. 10 above. No. 18: Additional red line comments have been addressed. 7. Zoning: No. 23: Only proposed items are shown on the Site Plan. No. 28: Please see Schedule #6 on the Site Plan. No. 29: The utility items have been removed from the Site Plan. No. 30: Comment noted, thank you. We will respectfully consider this on our future City of Ft. Collins projects. No. 31: The Site Plan has been revised accordingly. No. 32: The plans have been revised as requested. No. 33: Comment noted, thank you. No. 34: We are matching the materials and colors from the adjacent Safeway grocery store. Color photos of the grocery store are included in this resubmittal. No. 35: Proposed signage locations on the canopy and carwash have been shown. No. 36: Street trees have been added in the locations that were denoted on the red lines. However, the exact tree locations along Valley Forge Avenue have been slightly modified due to conflicts with existing underground utilities. No. 37: The note as requested has been added to the Landscape Plan. No. 38: The planting bed has been extended to reduce the amount of sod. No. 39: According to the City Forester, Mr. Tim Buchanan, the Siberian Elms are a nuisance tree and no mitigation is required. Per on -site meeting held 3/20/2006. F:\SAFEWAY\SA2913-Taft & Drake\do6SA2913-jcs-2nd submittal response.doc Galloway, Romero & Associates Design Engineering Planning 5350 DTC Parkway Greenwood Village, Colorado 80111-3006 (303) 770-8884 (303) 770-3636 fax E-mail: john_scales@graa.com June 5, 2006 Steve Olt City of Fort Collins Current Planning Department 281 North College Avenue P. O. Box 580 Fort Collins, CO 80522-0580 Re: Safeway Fuel Facility — Resubmittal No. 1 Drake Crossing Shopping Center Fort Collins, CO Response to May 19, 2006 Review Comments Dear Mr. Olt: Please accept this first Project Development Plan resubmittal for the Safeway Fuel Facility referenced above. The plans included in this resubmittal have been revised to address the review comments contained within the Staff Project Review dated 5/19/2006. The following are itemized responses corresponding to the Staff's review comments. 1. Current Planning: No. 25: All red -lined plans are included in this resubmittal. No. 26: The Swamp White Oak has been changed to Bur Oak per Mr. Buchanan's request. No. 27: An on -site meeting with Mr. Buchanan was held on March 20, 2006. No. 24: Existing sidewalk at the northwest corner of the site has been shown extending to the south. 2. Engineering: No. 3: The Cover Sheet has been revised as requested. No. 4: The Site Plan and the ALTA Survey have been revised per the comments. No. 5: The Utility Plan and the Grading & Erosion Control Plan have been revised as instructed. 3. Light & Power: No. 2: Comment noted, no revision required. F:\SAFEWAV\SA2913-Taft & Drake\d0c\SA2913-ics-2nd submittal response.doc