HomeMy WebLinkAboutDRAKE CROSSING, SAFEWAY FUEL CENTER - PDP - 35-96D - CORRESPONDENCE -. 1 4 .1,
[5/ 10/061 Show existing sewer service from existing car wash and add
notes regarding abandonment.
Number: 16 Created: 5/ 10/2006
[6/20/06] Include a standard detail for traffic rated cleanout. Provide e-
mail address, and we will send City's detail.
[5/ 10/06] Any sewer service clean -outs in drive areas must be traffic rated.
Bring 4-inch cleanout with screw cap up inside a valve box with a lid
marked "sewer".
Number: 17
[6/20/06]
Created: 5/ 10/2006
[5/ 10/06] The curb stops must be within a utility easement.
Number: 47 Created: 6/ 20/ 2006
[6/20/061 Provide a complete set of utility plans for review (including title
sheet and Std Details).
Be sure and return all red -lined plans if/when you re -submit prior to the
administrative public hearing.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at (970)221-6341.
Yours Truly,
/*V� DA_
Steve Olt,
City Planner
cc: Randy Maizland
Current Planning File #35-96D
Page 5
Department: Stormwater-Water-Wastewater Issue
Contact: Roger Buffington
Topic: Landscape Plan
Number: 48 Created: 6/20/2006
[6/20/06] Add note regarding landscape separation distances as shown on
red -lined Landscape Plan.
Department: Stormwater-Water-Wastewater Issue
Contact: Wes Lamarque
Topic: Stormwater
Number: 7 Created: 5/9/2006
[6/20/061 No utility plan was received by the Stormwater Utility. Will
review at Final Compliance.
[5/9/06] Per conceptual review comment, spill containment for the fuel
pump area is required. The City has a standard detail in electronic form.
Number: 8 Created: 5/9/2006
[6/20/06] Can be resolved at Final Compliance.
[5/9/06] There is an existing pipe outlet into the existing pond/swale that
is in conflict with an existing tree. The tree or the pipe outlet may need to
be removed/moved.
Number: 10 Created: 5/9/2006
16/20/06] Will determine necessary drainage easement locations at Final
Compliance.
[5/9/06] Any drainage facilities within the site are required to be included
within a drainage easement.
Number: 11 Created: 5/9/2006
[6/20/06] Final Compliance item.
[5/9/06] The existing sand and oil separator that is to be abandoned can
remain in place if the manhole is filled with sand and the cone lid is
removed.
Number: 46 Created: 6/ 20/ 2006
[6/20/06] Please revise water quality outlet structure per redlines.
Number: 52 Created: 6 / 23 / 2006
[6/23/06] Stormwater is ready for a hearing.
Department: Stormwater-Water-Wastewater Issue
Contact: Roger Buffington
Topic: Water/Wastewater
Number: 14 Created: 5/ 10/2006
[6/20/06] Revise Note #31 as shown on redlines.
Page 4
[5/8/06] Cover Sheet Comments: Add month and year under title at top of
sheet. Remove Development Data table, Parking Calculations & Signatures
and Approvals info from cover sheet, this info shall be shown on the Site
Plan. Add standard City Approval Block to lower right corner of sheet.
Provide City standard indemnification statements to sheet (see statements
attached to redlines). Add a secondary benchmark for reference. Add a
general notes reference statement referencing LUCASS general notes (see
reference statement attached to redlines).
Topic: Technical Services - Survey
Number: 22
[6/ 13 / 06] No comments
[5/ 12/061 No comments
Department: Light & Power
Topic: Electric utility
Number: 40
[6/ 14/06] No Comment
Created: 5/ 12/2006
Issue Contact: Bruce Vogel
Created: 6/ 14/2006
Department: PFA Issue Contact: Carie Dann
Topic: Fire
Number: 19 Created: 5/ 10/2006
[6/ 22 / 06]
[5/ 10/06] Contractor(s) are required to get permits from the Poudre Fire
Authority (PFA) before removing the old fuel -storage tanks and installing the
new tanks.
Number: 21 Created: 5/ 10/2006
[6/22/061
[5/ 10/06] PFA charges fees for plan review and installation. For more
information please contact Carie Dann at the PFA, 416-2869.
Number: 51 Created: 6/22/2006
[6/22/06] FIRE HYDRANTS: The symbol for existing fire hydrants needs to
be larger, so the hydrant locations are easier to find. Also, the symbol in the
legend for proposed hydrants needs to be eliminated, since no hydrants are
proposed.
Department: Transportation Planning Issue Contact: Kurt
Ravenschlag
Topic: Landscape Plan
Number: 50 Created: 6/21 /2006
[6/ 21 / 06] No comments
Page 3
d. There are several plant material symbols in the LANDSCAPE LEGENDS
that do not appear to be on the plan. If this is the case then they should
be removed. Please see the red -lined plan that is being forwarded -to
you.
e. There are possibly 2 areas along the east - northeast side of the
vehicular use & canopy area, where the existing Siberian Elm trees are
to be removed, that need additional plant materials for screening of this
area from the adjacent streets. This could be done with additional
evergreen trees or shrubs that would satisfy the requirement set forth in
Section 3.2. 1 (E) (4) (b) of the Land Use Code.
Topic: Lighting Plan
Number: 45 Created: 6/ 15/2006
[6/ 15/06] No additional comments on the Lighting Plan, Sheet CU1.2.
Topic: Site Plan - Alta Survey
Number: 41 Created: 6/ 15/2006
[6/ 15/06] These comments relate to the Site Plan only because Current
Planning has no real interest in the ALTA/ACSM Land Title Survey.
a. There is some confusion about the Cover Sheet (CS 1.0), as re-
submitted. Is it intended to be the cover sheet for the Site, Landscape,
Building Elevations, and Lighting Plans set; or, the cover sheet for the
Utility Plans set? The answer to this question is important because it
helps determine what information and signature blocks are needed on
the cover sheet. Please see the red -lined copy of this sheet that is being
forwarded to you.
b. A Vicinity Map must be included on Sheet CS1.1. Also, a north arrow
and scale must be included on this sheet.
c. The UTILITY PLAN APPROVAL block should not be on sheet CS I A and
should be removed.
d. There are numerous items listed in the SITE LEGEND on Sheet CS 1.1
that do not appear on the plan, are not needed on the plan, or are not
consistent with the plan. Please see the red -lined copy of this sheet that
is being forwarded to you.
Department: Engineering Issue Contact: Randy Maizland
Topic: General
Number: 3 Created: 5 / 8 / 2006
[6/ 13/06] Cover sheet still needs to show a secondary benchmark (per
LCUASS) and Appendix E General Notes or General Notes reference note
attached to the red -lined set.
Page 2
MIKAN
STAFF PROJECT REVIEW
City of Fort Collins
Galloway, Romero 8v Associates Date: 06/29/2006
c/o John Scales
5350 -DTC Parkway
Greenwood Village, CO 80111
Staff has reviewed your revisions re -submittal for DRAKE CROSSING,
SAFEWAY FUEL CENTER - PDP (TYPE 1), and we offer the following
comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Building Elevations
Number: 43 Created: 6/ 15/2006
[6/ 15/06] The Canopy Elevations, Sheet 1 of 2, look good. The reference to
"and Monument Sign" in the Sheet Title should be removed since the
monument sign detail is no longer on the sheet. I have noted on this plan
that the mechanical elements on the West Elevation must be painted to
match the building colors. This requirement actually is already taken care of
on Sheet 2 of 2, the Convenience Store and Car Wash Elevations.
Number: 44 Created: 6/ 15/2006
[6/ 15/06] There are no comments on Sheet 2 Of 2, the Convenience Store
and Car Wash Elevations. Nice looking building, consistent with the
Safeway Supermarket building.
Topic: Landscape Plan
Number: 42 . Created: 6/ 15/2006
[6/ 15/06] The following comments relate to Sheet LIA, the Landscape
Plan:
a. There 2 separate LANDSCAPE LEGENDS on the Landscape Plan. One
appears to reference proposed plant materials and one appears to
reference existing plant materials. Probably they should be labeled as
such. '
b. There appear to be some discrepancies between plant material
quantities in the PLANT SCHEDULE and what are actually shown on
the plan. Please see the red -lined plan that is being forwarded to you.
c. A north arrow and scale are needed on the plan.