HomeMy WebLinkAboutMULBERRY / LEMAY CROSSINGS PUD, LOT 2, FILING 2 - FINAL PUD - 36-96E - SUBMITTAL DOCUMENTS - ROUND 6 - ROUTING SHEETProject: iY)
Planner:
Engineer: 6 � ,�
Items Requested
Site land I Plat I Utility Drair
X x x X
X X
Operations
Planning
A Resources
Planning
(Totals 1 T 1 i
Other:
Date: /1/2Z/6c
Tragic Operations:
Redlined Items Being Returned
Other Items Required Site land Plat I Utili Drainage
n X
x
Hote: All redlined items should be returned with the resubmittal/ revisions.
Other Items
Returned
■
Revisions Routing , Shee / I
jill
1
OWN
m
m
WIN
IN
ENGINEERI
No
IN
sot
m
IN
IN
BUILDING INSPECTION
IN
IN
WIN
,.
0mmm
��
FIRE
MIN
maIN&IIN
90,29
�mIN
R.O.W. PLANNING
WATER CONSERVATION
INN
. • •
�m
tmIN
IN
PUBLIC SERVICE
IN
mmm
STATE HIGHWAY DEPARTMENT
mom
0 IN
DITCH COMPANY
W
mmm
MIN
RAILROAD: UP or BN/CS
WNW
wommom
iiii
mmmmmm�
Wiiiiiiii�
immmmmm
iimommom
���e�iiiiiiiiIN