Loading...
HomeMy WebLinkAboutMULBERRY / LEMAY CROSSINGS PUD, LOT 2, FILING 2 - FINAL PUD - 36-96E - CORRESPONDENCE - REVISIONSMr. Ted Sheppard February 26, 2001 Page 4 CLC Associates, Inc. and Goldberg Property Associates, Inc. have worked closely with the City's departments and consultant on the sizing and location of the right-of- way dedication and construction easement. Both of these dedications will be handled under separate document. Public Service Co. Re: 9' public utility easements adjoining 121h Street and E. Magnolia Street.... Site Plan does not show that sidewalks any portion of these easements. However, if sidewalks do occupy these easements, then Utility Easement width will have to be increased accordingly The only portion sidewalk that lies within this Utility Easement is the "wing" of the handicap ramp. Community Planning and Environmental Services The comments listed in your letter of November 7, 2000 and the Planning and Zoning Commission's condition of December 7, 2000 have been incorporated into the On -site Utility Plans and the Final PUD Site Plan; signed photographic mylars of the Final PUD Site Plan will be forwarded under separate cover. Please contact me should you need additional information. Sincerely, CLC ASSOCIATES, INC. Kurt D. Prinslow Vice President KDP:cst Enclosures cc: Mark Goldberg, Goldberg Property Associates, Inc. (without attachments) Ben Drake, Goldberg Property Associates, Inc. (without attachments) Lucia Liley, March and Liley (without attachments) Mr. Ted Sheppard February 26, 2001 Page 3 2. Will need to check the Site Plan against the Plat once an up -dated plat is provided. An up -dated Final Plat has been prepared in conjunction with these Plans; copies have been provided. 3. Show the new property line based on the ROW dedication for the Round -About. Plat Refer to comment #1 under Technical Services. Once revised the Plat needs to be submitted for review. Refer to the attached Plat. 2. The certificate of dedication also needs to dedicate the easements as shown on this plat to the City - please add this. This comment has been addressed and incorporated. 3. We are asking that the additional ROW at the sw corner of the site be dedicated with this document. Refer to comment #1 under Technical Services. 4. Need to show all the easements that were previously dedicated on the plat. Need to show these as existing or show that they are being vacated with this plat. This comment has been addressed and incorporated. 5. Need to provide boundary lines between some of the different easements. This comment has been addressed and incorporated. 6. Some easement labels do not correspond to the labeling shown on the site plan. These documents need to label the easements the same and show the easements in the same locations. ROW An up -dated Final Plat has been prepared in conjunction with these Plans; copies have been provided. ....request the ROW for the roundabout be shown on the plat. Mr. Ted Sheppard February 26, 2001 Page 2 The "redline" sets are being returned for use by the respective departments: Engineering Final PUD Site Plan - Sheet 2 Stormwater Final Drainage Report Enclosed you will find the following plan sets : 3 Folded copies Final Subdivision Plat dated 2-15-01 2 Unfolded copies Final On -Site Utility Plan dated 2-16-01 4 Copies Final Drainage Report and Drainage Plans - stamped and signed 3 Folded copies Site Plan - Sheet 2 of 11 1 Folded copy Landscape Plan - sheet 3 of 11 In addition these revised plans we are offering written comments to the various reviewing agencies: Utility - Stormwater "......To that end it is recommended that the undeveloped portion be parcelled out in a separate lot rather than be left as part of Filing 2 Lot 2. " Please refer to the Final Plat and find that we have heeded their advice and created a new lot - Lot 6. Four (4) signed and stamped copies of the Final Drainage Report have been provided for their signature; please return at least one for our record. Technical Services The Round -About R/W needs to be coordinated with this plat. CLC and Goldberg Property Associates have worked closely with the City's departments and consultant on the sizing and location of the right-of-way dedication and construction easement. Both of these dedications will be handled under separate document. Engineering On -Site Utility Plans The access easements are no longer being shown on the site plan. Why? An access easement for use by the PFA, as well as, users of this shopping center, has been shown on this version of the On -site Utility Plans . CLC Associates, Inc. February 26, 2001 8480 E. Orchard Rd. Suite 2000 Englewood, CO 80111 303/770.5600 303/770.2349 FAX Mr. Ted Sheppard Current Planning City of Fort Collins 281 North College Avenue Fort Collins, CO 80522-0580 RE: Mulberry and Lemay Crossings - Filing 2, Lot 2 On -Site Utility Plans and Final Plat Re -Submittal Dear Mr. Sheppard: A1I,1111YYd1uIn�xN l�nl l.inullYnl,, llu DT@ T 0TT MAR I - 2001 D Accompanying this cover letter are revised sets of the Mulberry and Lemay Crossings - Filing 2, Lot 2 On -site Utility Plans, Final Plat, Site Plan - Sheet 2 of 11, and the Landscape Plan - Sheet 3 of 11 - from the Mulberry and Lemay Crossings - Filing 2, Lot 2 Final PUD Site Plan. The revisions to these plans are based on the written comments and accompanying "red -lines" we received, as well as, the condition of the Planning and Zoning Board's approval. DepartmentlAgency Received Utility - Storm water November 22, 2000 Technical Services November 22, 2000 Engineering November 22, 2000 ROW November 22, 2000 Public Service Co. November 22, 2000 Water / Wastewater November 22, 2000 ( no comments) Community Planning November 7, 2000 P&Z Condition of Approval Dec. 8, 2000 Planning Engineering Architecture Landscape Architecture Land Surveying