HomeMy WebLinkAboutMULBERRY / LEMAY CROSSINGS PUD, LOT 2, FILING 2 - FINAL PUD - 36-96E - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETI
Project:
Date cc
Planner: Tralic Operations:Engineer:
Items Requested
Utili Drainage Rpt Other Items Re uired
EngineeringStormwaterWater/Wastewate
Redlined Items Being Returned
Site Land Plat Utili Drainage fl t Other Items Being Returned
gLand
X
Tragic Operations
Trani. Planning
Tran�l�ll
x
;�
�•�r1�Y�t�� S
Natural Resources
Park Planning
Other:
Note: All redlined items should be returned with the mubmittal/ revislom.
r
rA
Revisions , ' ' ' = • • j
all
,l
04,15
K40
VA
Of
ENGINEERING: PAVEMENT
m
-N
BUILDING INSPECTION
m
LIGHT & POWER
MAPPING / DRAFTING
m
FIX
FAR
IN
ADVANCE PLANNING
WA
'm
mmmommm
o��������
WATER CONSERVATION
im
m
PUBLIC SERVICE
STATE HIGHWAY DEPARTMENT
wAr
DITCH COMPANY
m
RAILROAD: UP or BN/CS
NNW
mom
m
iiimmmmmmOmmom
iiii�
mimmmmmmmm
mrFrRr
i PA
OVNA