5. Please work with Marsha Hilmes-Robinson on the floodplain
comments. She can be reached at 224-6036.
6. A variance for the "dryland access" requirement is needed
from the Water Board. This variance must be done prior to
the City being able to approve and sign the final
dev to ment plans. wcc ddta q i,;arta,« {o,n ro• f(� C►y ,.( rcccr�.
Xf V�a
tJn dubN.N11 +i. ;A4v14a aIve&,IV
Light & Power:
1. Power will come from the existing electric vault in the
north portion of this site. Please coordinate a
transformer location with Doug Martine. He can be reached
at 224-6152.
Planning:
1. Len Hilderbrand of Xcel Energy indicated that the
applicant should contact Connie Woodward, at.225-7843, for
installation of gas service. She will need load
information.
This item could be ready for a Planning and Zoning Board
public hearing if comments are addressed in a timely fashion.
Staff is tentatively putting it on the January 15, 2004 P&Z
agenda. Please see the attached Revision Routing Sheet for the
number of copies of each document to re -submit when addressing
the comments. Also, be sure and return all of the red -lined
plans when you re -submit.
If you have any questions regarding these issues or any other
issues related to this project, please feel free to call me at
221-6341.
Yo rs T y,
t�lt,
City Planner
cc: Sheri Wamhoff, Engineering
Wes Lamarque, Stormwater
Stewart & Associates
Current Planning File #36-96H
Page 10
Number: 11 Created: 12/4/2003
[12/4/03] Combine landscaping details onto one page
We keer d4c ro i %uk. •IFspace.
Number: 12 Created: 12/4/2003
[12/4/03] need landscaping along the drive aisle - See 3.2.1
for landscaping requirements 'r k;j w 4j Otjdl..1.
The following comments were expressed at staff review on
December loth
Engineering:
4 Letters of intent are needed for off -site easements if the
storm drainage is intended to go to the south and east
from this detention pond. The letters must be provided to
the City before going to public hearing. TtiL s4ovftwA�e
+0 ]?,4k S46cel
2. An easement is needed for a portion of the on -site
detention pond.
3. A cross -access and parking agreement is needed with
Supermarket Liquors. _� W/
4. The handicapped ramp is in a utility easement behind the
12th Street right-of-way. This may interfere with some
utilities.
5. what is the status of the existing recycled asphalt drive?
Is it to remain or be eliminated?
Stormwater:
�1 Staff is recommending that the site be drained to 12th
Street. Drainage can be redirected to 12th Street without
much re -grading of the pond required. Then off -site
easements from other property owners would not be
necessary. h.'s wcs c�,tojeJ, to di.�c4av7t ,..fo ;L+4jj..
2. No water quality box outlet detail has yet been provided
for review. br,
3. An easement is needed for a portion of the detention pond
on -site. d-01(1k—
4. Erosion control is needed.
Page 9
0
Department: Transfort Issue Contact: Garold
Smith
Topic: General
�Ntimber: 3 Created: 11/25/2003
[11/25/031 No comments
Department: Transportation Planning Issue Contact: Tom
Reiff
Topic: Site Plan
LVIirmber: 32 Created: 12/9/2003
FYI - Just a reminder, there will be no on -street parking
permitted on 12th Street.
Department: Zoning Issue Contact: Jenny
Nuckols
Topic: ZONING
Number: 5 Created: 12/4/2003
[12/4/03] If customers want to go inside, where are they
supposed to park? If they park at Supermarket Liquors they
will have to walk through the parking lot, down the driveway
and then a long 12th Street - that just isn't very accessible.
Number: 6 Created: 12/4/2003
[12/4/03] From a users point of view, the hours of operation
are very limited - why only stay open till 2:30 p.m. - There
are a lot of coffee drinkers who might want coffee at 3:00,
when they get off work etc.
Number: 7 Created: 12/4/2003
'{12/4/03] Note the building height, on the elevations
t.�c <il r•hu•
Number: 8 Created: 12/4/2003
[12/4/03] Please don't show sign locations on the elevations.
Signs will be reviewed and permitted separately through Zoning
prior to their installation we-iov� sign OF' B4�Id:{f
Number: 9 Created: 12/4/2003
[12/4/03] The dumpster enclosure is only 4 feet tall, this
won't be tall enough to adequately screen a standard dumpster
- Review this or note the type of dumpster that will be used
if different
Number: 10 Created: 12/4/2003
[12/4/03] What is the color scheme for the exterior - please
note on the elevations � A�u
Page 8
Number: 36 Created: 12/9/2003
Please include a water quality outlet box detail per City
standard as well as any other drainage details relevant to
this site. CO/ z ,¢.-,
Number: 37 �""`OY �C`r`heaVteed: 12/9/2003
A drainage easement is required for the limits of the
detention pond and the outfall pipe. ,4_�.#44
Number: 40 Created: 12/9/2003
Please add basin po d summary tables to the drainage plan.
Topic: Erosion/Sediment Control
Number: 39 Created: 12/9/2003
1. Plan needs notes, BMP's, calculations, etc. Rctou 40P&4A__)
Topic: Floodplain
Number: 38 Created: 12/9/2003
1. There are numerous items on the floodplain review
checklist that have not been included on the plans and
he drainage report. See attached review checklist for
required items.
The grading of the driveway is not above the BFE of 4932.
Therefore, it does not meet the dryland access
u �}� requirement. Please review and revise the grading to be
x above the BFE.
3. The cross-section and BFE lines must be shown on the
plans along with a note stating the entire site is in the
floodplain.
4. All "floatable" items - bike rack, trash bin, tables,
chairs, etc. need to be noted as being anchored.
5. Please identify the elevation of any HVAC equipment on
the plans and in the drainage report. It must be 2 ft.
above the BFE.
6. A floodplain use permit and $25 permit fee are required.
7. A FEMA elevation certificate will be required after
construction in order to obtain a CO.
Department: Traffic Operations Issue Contact: Eric Bracke
Topic: traffic
.Number: 2 Created: 11/24/2003
[11/24/031 No issues and the TIS has been waived.
Page 7
contrasting background. (Bronze numerals on brown brick are
not acceptable).
1997 UFC 901-.4.4
Number: 15 Created: 12/8/2003
This comment pertains to the proposed project located at 432
12th street, Lot 3 of Mulberry and Lemay Crossing.
WATER SUPPLY: Commercial
No commercial building can be greater then 300 feet from a
fire hydrant.
Fire hydrants are required with a maximum spacing of 600 feet
along an approved roadway. Each hydrant must be capable of
delivering 1500 gallons of water per minute at a residual
pressure of 20 psi. Ttic -r,o^ E c:s}Iryn �,rc �y� am
1997 UFC 901.2.2.2
[12/8/03]
Number: 16 Created: 12/8/2003
This comment pertains to the proposed project located at 432
12th street, Lot 3 of Mulberry and Lemay Crossing.
HOOD & DUCT FIRE SUPPRESSION SYSTEM:
If grease laden vapors are produced in the preparation of any
of the food items a Hood & Duct Fire Suppression System shall
be required.
Department: Police
Gerdom
Topic: General
INttinber : 49
(12/10/031 No Comments.
Issue Contact: Joseph
Created: 12/10/2003
Department: Stormwater Utility Issue Contact: Wes
Lamarque
Topic: Drainage
Number: 34 Created: 12/9/2003
If the pond is to outlet onto the Supermarket Liquors
property, a drainage easement would be required from the
property line of the development to a designated drainage way
or right-of-way. Having the pond outlet onto the street
adjacent to this property may be a lot simplier. Please
revise. -f kG po�'4 W `t1 C'h44Yed 'fa dIJt- 4�91. Jhrc 1 zti, =.
Number: 35 Created: 12/9/2003
Please change orifice size to one 3/8-inch diameter hole per
row. See drainage report.
Pagc 6
J
Vumber: 45 Created: 12/10/2003
[12/10/031 Locate the driveways. Provide a distance from a
property line. .vc: 0.AAeo{ %,(tf+t•cc 4 o J%vpc,+., I -Inc.
Number: 46 Created: 12/10/2003
[12/10/031 Add the following note with an arrow pointing
toward the new driveway. If pavement is disturbed, st eet
patching to standards is required. U C4�i6�
Number: 47 Created: 12/10/2003
[12/10/031 Provide curb, gutter and sidewalk detail and ,�}'��
detail 2201 if waterline cut into street is to remain.
LNumber: 48 Created: 12/10/2003
[12/10/031 On the landscape plan the detention pond is
labeled as existing grass to remain. This entire area will be
regarded, so the existing grass won't really remain. It will
need to be re -seeded or re -sodded. 14- w,;! be rc e,WAw—,&C�.Hv-Q 2�
LNUmber: 50 Created: 12/12/2003
[12/12/031 Engineering Pavement comments: 12th Street is
less than 5 years old so any cuts will require mill and inlay.,,,
.V O G �..'FS P4 µ'OJtd .
Department: Light & Power Issue Contact: Doug
Martine
Topic: General
Number: 1 Created: 11/24/2003
[11/24/031 The developer will need to coordinate a location
for a pad type electric transformer on the site, and the
remaining electric development charges with Light & Power
Engineering (221-6700) . 7%;; wkr 49
Department: Natural Resources
Topic: General
Number: 4
[11/28/031 No issues.
Issue Contact: Doug Moore
Created: 11/28/2003
Department: PFA Issue Contact: Michael
Chavez
Topic: General
Number: 14 Created: 12/8/2003
This comment pertains to the proposed project located at 432
12th street, Lot 3 of Mulberry and Lemay Crossing.
ADDRESS NUMERALS:
Address numerals shall be visible from the street fronting the
property, and posted with a minimum of 6 inch numerals on a
Pagc 5
I
`dumber: 30 Created: 12/9/2003
[12/9/03] Although the placement of the building does not
satisfy the "build -to,, line standard set forth in Sections
3.5.3(2)(2)(a)&(b) of the LUC, it does satisfy the exception
to the standard as set forth in Section 3.5.3(B)(2)(d)1
regarding the provision of an outdoor patio that directly
relates to the adjacent street and sidewalk (12th Street)
Therefore, the "build -.to" line standard is satisfied. yes
lNumber: 31 Created: 12/9/2003
[12/9/03] The development plan must provide for additional
landscaping (trees and shrubs) in a 5' wide setback area from
the south property line to satisfy Sections 3.2.1(E) (4) (a)&(b)
of the LUC. This uwas Acne —
Topic: Utilities
-Number: 13 Created: 12/8/2003
[12/8/03] Mike Scheid of the East Larimer County Water
District (ELCO) indicated that his comments are included on a
red -lined set of utility plans that are being forwarded to the
applicant with this comment letter.
Department: Engineering Issue Contact: Sheri
Wamhoff
Topic: General
Number: 41 Created: 12/10/2003
[12/10/031 Need letter of intent for off -site easement(s)
needed, prior to hearing. . //
le
(Number: 42 Created: 12/10/2003
[12/10/031 Need off -site easement for the drainage pipe to be
installed ano for the path the flows qo qqff-site.
T' HJJ 1W4J C ♦AIed + eI is t k4V9G l0-+o !Z 4 -it.
Number: 43 Created: 12/10/2003
[12/10/031 Need access easement for the shared driveway.
This can be an easement (private or public) or an access
agreement. If it is to be a private easement or agreement, we
will need to receive a signed copy of this. And I would
recommend that it by filed by the applicant at the county. cL�__
Part of this area is on this site, part of it is off site.
Number: 44 Created: 12/10/2003
[12/10/031 Will need to dedicate an easement to the City for
the area of the detention pond that goes outside of the
existing drainage easement.
Page 4
Number: 54 Created: 12/12/2003
[12/12/03] Are the Metal Halide and Fluorescent light
fixtures the best solution and do they meet the standar set
forth in Sections 3.2.4(D)(3)&(5) of the LUC?
Topic: Site Plan
Number: 18 Created: 12/8/2003
[12/8/03] The drive for this project starts at a 20' width
and narrows down to 15, on the curve near the southeast corner
of the site. Is it possible that this whole drive could be 15'
in width, which would allow for a 5' wide landscape strip
along the south property line? There needs to be some
landscape buffer in this area. "r i3;S Was Ve vi 16 d •
LNttmber: 19 Created: 12/8/2003
[12/8/03] Is there an existing sidewalk on the east side of
12th Street along the Supermarket Liquors property? 7L e-e ! 3 e.0 ff; L04,0A;
LNumber: 20 Created: 12/8/2003
[12/8/03] Is it possible to include 2 or 3 parking spaces on
this site to accommodate the patrons that want to walk into
the building for a drink? The Planning Objectives indicate
that there will be a small indoor seating area for about 15
people plus the outdoor patio, which will probably have
seating. Where will these people park to patronize the coffee
house? If the only parking for this project is to be in the
Supermarket Liquors lot (for both employees and patrons) then
a shared parking agreement with the liquor store is needed. A
copy of the agreement must be provided to the City for review
and to be put on file. This was not Yers;:le .
Number: 28 Created: 12/8/2003
[12/8/03] There appears to be about 5' between the bicycle
rack and the bottom of the steps up to the outdoor patio �(��,� n
(please see red -lined Site Plan). Is this enough space to �J�'"'QLjY�
ensure that bicycles will not block the steps? IA.N PP
kNtimber: 29 Created: 12/9/2003
[12/9/03] The Site Plan is very responsive to the Site Design
standard set forth in Section 4.17(E) (2) (a) in the C -
Commercial Division of the LUC.
Page 3
0
Topic: General
Number: 51 Created: 12/12/2003
[12/12/031 The entry drive should be narrowed down to 15' to
match the width of the drive along the east side of the
building. The existing recycled asphalt emergency drive on the
south property line should either be incorporated into the new
drive for this development or moved a little to the south to
create a 5' wide landscape strip on this property.7ti;rwz-r done.
-Number: 52 Created: 12/12/2003
[12/12/031 On the Site & Landscape Plans, please note what
type of "existing fence" is along the east property line.
ThG fenct r1 wvo
47opic: Landscape Plan
Number: 21 Created: 12/8/2003
[12/8/03] How will the "existing grasses to remain" area east
and north of the drive (between the street, drive, and fence
to the east) be maintained? 71,e- o4cte,%4-10*,t po"d will bG rc-sc�•{c.(
'Number: 22 Created: 12/8/2003
[12/8/03] The first 2 street trees north of the northerly
(exit) drive cut are shown to be spaced at 50' on -center on
Sheet 1 of 2 of the Landscape Plan but 40' on -center on Sheet
2 of 2 of the Landscape Plan. T4'r- .Ijoacrirrq w.ef coyrerf,./
LNumber: 23 Created: 12/8/2003
[12/8/03) The proposed Autumn Purple Ash (shade) street trees
are not on the City's approved street tree list. Please make a
species selection from the approved list. Also, please check
with Tim Buchanan, the City Forester, at 221-6361, to
determine if the Cockspur Hawthorn is an approved ornamental
street tree species. There are several Hawthorns that are on
the lest. kc 7I e..e_ was C kANgCCi i O litGkbe�✓y.
Topic: Lighting
Number: 53 Created: 12/12/2003
(12/12/031 There are a couple of spot lighting levels shown
on the Photometric Plan that exceed the allowable maximum of
10 foot candles. Also, the lighting levels on the exit drive,
near the street, appear to be too high. Please see the red -
lined Photometric Plan that is enclosed with this comment
letter. Are all the lights down directional and shielded to
prevent glare and light spillage? It is difficult to tell from
the plans. See Sections 3.2.4(D)(7)&(8) of the Land Use Cod
( LUC) .
Page 2
hack 0
T a
LM6=FAWM
S AFF PROJECT REVIEW VIA
C':Iv of Furl <.�ollin �. v, ►J'
Beantrees, Inc. Date: 12/12/2003
c/o Eileen Turgeon & Diana May
901 Sailors Reef
Fort Collins, CO. 80525
Staff has reviewed your submittal for MULBERRY & LEMAY
CROSSING, 1ST FILING, LOT 3, BEANTREES PDP - TYPE II, and we
offer the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: Building comments
Number: 17 Created: 12/8/2003
[12/8/03] Rick Lee of the Fort Collins Building Department
indicated that he is forwarding the various codes and
standards that will be enforced by the City. Included are the
minimum accessibility requirements for the installation of the
water closet (toilet room). These documents are enclosed with
the comment letter to the applicant. KC
LNumber: 24 Created: 12/8/2003
[12/8/03] The Site Plan indicates that the building height is
to be 201; however, the scaled building height(s) on the
Building Elevations Plan is 13' to 151, depending on where the
measurement is taken. The Site Plan should be changed to
reflect this. `he rtetIA4- ;r C�a..ye�i fa
,.Number: 25 Created: 12/8/2003
[12/8/03] The signage must be taken off of the Building
Elevations Plan (west and south elevations). This site is not
in the Residential Neighborhood Sign District. The signage
will be enforced (both building and monument signs) by the
Zoning Department per the City's Sign Code allowances and
requirements at time of building permit application.
TkGSl9n23e a.r 4xke, t�j; -JAe bujlo�i+1
tNumber: 26 Created: 12/8/2003
[12/8/03] Show building heights on the Building Elevations
Plan. ffaif4-fl --,1-e 44f, E'l,rva�'ctit
Number: 27 Created: 12/8/2003
[12/8/03] Is the 5' x 5' Trash & Mechanical Enclosure large
enough for both? Does this plan accommodate the possibility
for recycling? Ir