Loading...
HomeMy WebLinkAboutMULBERRY & LEMAY CROSSING, 1ST FILING, LOT 3, BEANTREES - FDP - 36-96K - CORRESPONDENCE - (3)I Department: Stormwater Utility Issue Contact: Basil Hamdan Topic: General Number: 57 Created: 2 / 5/ 2004 [2/5/04] Please have the applicant's engineer call Basil Hamdan, at 224-6035, to set up a meeting and go over the comments left prior to submitting mylars. Topic: Grading Number: 55 Created: 2 / 2 / 2004 [2/2/04] Can site be graded and constructed without obtaining an off -site grading easement from the property to the east. If yes, call out clearly limits of development on plan, if not an off -site grading easement may be needed. This letter, hopefully, represents final staff comments before submittal of mylars for recording. Please be sure and return all red -lined paper plans with any re -submittal. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at 221-6341. Yours Truly, A�J teve Olt, City Planner cc: Susan Joy, Engineering Basil Hamdan, Stormwater Dick Rutherford, Stewart & Associates Current Planning File #36-96H Page 3 M Topic: Erosion/Sediment Control Number: 39 Created: 12/9/2003 [2/3/04j Second Review February 3, 2004 There are no BMP's shown on the plan, and there are no calculations, etc. Please provide. Sediment/Erosion Control Plan Comments Mulberry/Lemay Crossing 1st, Lot 3, Beantree December 9, 2003 1. Plan needs notes, BMP's, calculations, etc... Topic: Floodplain Number: 38 Created: 12/9/2003 [1/30/041 Floodplain Comments 1-28-04 1. Please see wording changes and minor additions in the drainage report. 2. Please change the FEMA map panel to be 080102 004C in the drainage report and on the plans. 3. Because of the floatable material requirement, please show a drawing or further describe how the trash bin is going to be anchored. 12-03-03 1. There are numerous items on the floodplain review checklist that have not been included on the plans and the drainage report. See attached review checklist for required items. 2. The grading of the driveway is not above the BFE of 4932. Therefore, it does not meet the dryland access requirement. Please review and revise the grading to be above the BFE. 3. The cross-section and BFE lines must be shown on the plans along with a note stating the entire site is in the floodplain. 4. All "floatable" items - bike rack, trash bin, tables, chairs, etc. need to be noted as being anchored. 5. Please identify the elevation of any HVAC equipment on the plans and in the drainage report. It must be 2 ft. above the BFE. 6. A floodplain use permit and $25 permit fee are required. 7. A FEMA elevation certificate will be required after construction in order to obtain a CO. Page 2 ze nVq J STAFF PROJECT REVIEW City of FortCollins BEANTREES, INC. Date: 2/ 12/2004 c/o Eileen Turgeon & Diana May 901 Sailors Reef Fort Collins, CO. 80525 Staff has reviewed your submittal for MULBERRY & LEMAY CROSSING, 1ST FILING, LOT 3 (BEANTREES) PDP - TYPE II, FINAL PLAN, and we offer the following comments: ISSUES: Department: Current Planning Issue Contact: Steve Olt Topic: General Number: 58 Created: 2/ 12/2004 [2/ 12/04] The Site Plan, Landscape Plans, Building Elevations Plan, and Photometric Plan are OK for mylars, except they must include the proposed additional 4' x 10' building section that was reviewed by City staff in January, at the applicant's request. Department: Engineering Issue_ Contact: Sheri Wamhoff Topic: General Number: 44 Created: 12/ 10/2003 [2/3/04] The easement will need to be provided with the submittal of the mylars. [ 12/ 10/03] Will need to dedicate an easement to the City for the area of the detention pond that goes outside of the existing drainage easement. Number: 46 Created: 12/ 10/2003 [2/3/04] You did provide this, but please add an arrow from this note to the concrete channel as well. [12/10/031 Add the following note with an arrow pointing toward the new driveway. If pavement is disturbed, street patching to standards is required. Number: 56 Created: 2/4/2004 [2/4/04] The mylars need to be signed by ELCO Water District and Boxelder Sanitation District before we will accept them for signature. Department: Stormwater Utility Issue Contact: Wes Lamarque Topic: Drainage Number: 40 Created: 12/9/2003 [2/2/04] Still no drainage or detention pond summary table included on the drainage plan. Please show basin lines, even if site is entirely within one basin. Page 1