HomeMy WebLinkAboutMULBERRY & LEMAY CROSSING, 1ST FILING, LOT 3, BEANTREES - FDP - 36-96K - CORRESPONDENCE - (3)I
Department: Stormwater Utility Issue Contact: Basil Hamdan
Topic: General
Number: 57 Created: 2 / 5/ 2004
[2/5/04] Please have the applicant's engineer call Basil Hamdan, at
224-6035, to set up a meeting and go over the comments left prior to
submitting mylars.
Topic: Grading
Number: 55 Created: 2 / 2 / 2004
[2/2/04]
Can site be graded and constructed without obtaining an off -site grading
easement from the property to the east. If yes, call out clearly limits of
development on plan, if not an off -site grading easement may be needed.
This letter, hopefully, represents final staff comments before submittal of
mylars for recording. Please be sure and return all red -lined paper plans
with any re -submittal.
If you have any questions regarding these issues or any other issues related
to this project, please feel free to call me at 221-6341.
Yours Truly,
A�J
teve Olt,
City Planner
cc: Susan Joy, Engineering
Basil Hamdan, Stormwater
Dick Rutherford, Stewart & Associates
Current Planning File #36-96H
Page 3
M
Topic: Erosion/Sediment Control
Number: 39 Created: 12/9/2003
[2/3/04j
Second Review
February 3, 2004
There are no BMP's shown on the plan, and there are no calculations, etc.
Please provide.
Sediment/Erosion Control Plan Comments
Mulberry/Lemay Crossing 1st, Lot 3, Beantree
December 9, 2003
1. Plan needs notes, BMP's, calculations, etc...
Topic: Floodplain
Number: 38 Created: 12/9/2003
[1/30/041
Floodplain Comments
1-28-04
1. Please see wording changes and minor additions in the drainage
report.
2. Please change the FEMA map panel to be 080102 004C in the
drainage report and on the plans.
3. Because of the floatable material requirement, please show a drawing
or further describe how the trash bin is going to be anchored.
12-03-03
1. There are numerous items on the floodplain review checklist that have
not been included on the plans and the drainage report. See attached
review checklist for required items.
2. The grading of the driveway is not above the BFE of 4932. Therefore,
it does not meet the dryland access requirement. Please review and
revise the grading to be above the BFE.
3. The cross-section and BFE lines must be shown on the plans along
with a note stating the entire site is in the floodplain.
4. All "floatable" items - bike rack, trash bin, tables, chairs, etc. need to
be noted as being anchored.
5. Please identify the elevation of any HVAC equipment on the plans and
in the drainage report. It must be 2 ft. above the BFE.
6. A floodplain use permit and $25 permit fee are required.
7. A FEMA elevation certificate will be required after construction in
order to obtain a CO.
Page 2
ze
nVq
J STAFF PROJECT REVIEW
City of FortCollins
BEANTREES, INC. Date: 2/ 12/2004
c/o Eileen Turgeon & Diana May
901 Sailors Reef
Fort Collins, CO. 80525
Staff has reviewed your submittal for MULBERRY & LEMAY CROSSING,
1ST FILING, LOT 3 (BEANTREES) PDP - TYPE II, FINAL PLAN, and we offer
the following comments:
ISSUES:
Department: Current Planning Issue Contact: Steve Olt
Topic: General
Number: 58 Created: 2/ 12/2004
[2/ 12/04] The Site Plan, Landscape Plans, Building Elevations Plan, and
Photometric Plan are OK for mylars, except they must include the proposed
additional 4' x 10' building section that was reviewed by City staff in
January, at the applicant's request.
Department: Engineering Issue_ Contact: Sheri Wamhoff
Topic: General
Number: 44 Created: 12/ 10/2003
[2/3/04] The easement will need to be provided with the submittal of the
mylars.
[ 12/ 10/03] Will need to dedicate an easement to the City for the area of the
detention pond that goes outside of the existing drainage easement.
Number: 46 Created: 12/ 10/2003
[2/3/04] You did provide this, but please add an arrow from this note to
the concrete channel as well.
[12/10/031 Add the following note with an arrow pointing toward the new
driveway. If pavement is disturbed, street patching to standards is required.
Number: 56 Created: 2/4/2004
[2/4/04] The mylars need to be signed by ELCO Water District and
Boxelder Sanitation District before we will accept them for signature.
Department: Stormwater Utility Issue Contact: Wes Lamarque
Topic: Drainage
Number: 40 Created: 12/9/2003
[2/2/04]
Still no drainage or detention pond summary table included on the drainage
plan. Please show basin lines, even if site is entirely within one basin.