HomeMy WebLinkAboutMULBERRY & LEMAY CROSSING, 1ST FILING, LOT 3, BEANTREES - PDP - 36-96H - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYPa e1`
Steve Olt-beantree
From:
Eric Bracke
To:
Steve Olt
Date:
10/30/03 1:14PM
Subject:
beantree
I have waived the TIS for the Beantree coffee development. This was based on the fact that virtually all of
the trips are considered "pass -by"
Eric
Kind Regards,
Eric L: Bracke, P.E., P.T.O.E.
Traffic Engineer
(970)224-6062
ebracke@fcgov.com