Loading...
HomeMy WebLinkAboutMULBERRY & LEMAY CROSSING, 1ST FILING, LOT 3, BEANTREES - PDP - 36-96H - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYPa e1` Steve Olt-beantree From: Eric Bracke To: Steve Olt Date: 10/30/03 1:14PM Subject: beantree I have waived the TIS for the Beantree coffee development. This was based on the fact that virtually all of the trips are considered "pass -by" Eric Kind Regards, Eric L: Bracke, P.E., P.T.O.E. Traffic Engineer (970)224-6062 ebracke@fcgov.com