Loading...
HomeMy WebLinkAboutMULBERRY & LEMAY CROSSING, 1ST FILING, LOT 3, BEANTREES - PDP - 36-96H - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESPlanning Obiectives for Beantrees, Inc Beantrees, Inc is a start up drive through specialty coffee business. We will offer a variety of espresso based drinks, hot and cold, brewed coffee, chai and traditional tea, steamers, smoothies, hot chocolate and prepackaged cold drinks. In addition we will offer a limited menu of food items that will compliment coffee drinks including breakfast burritos, specialty breads, biscotti, sweet rolls, breads and bars, and cookies. The business will be located on commercial zoned property located at 432 12t' Street, i.e., Lot 3 of Mulberry and Lemay Crossing, first filing, just north of Supermarket Liquors and east of Super Walmart. The building will be approximately_440 square feet located in the southwest corner of the property. The site is located in the FEMA floodplain. The building will be elevated 24 inches above the 100 year water surface elevation. The building's design will be drive through specific, i.e., with a window dedicated to drive through purchases. Cars will access this window on the east side of the building. A one way drive will be located east of the building. The entrance will be from the existing south curb cut shared with Supermarket Liquors, with the exit to be located north of the building, approximately half way between the entrance and Magnolia Street. A walk up window for pedestrians will be located on the west side of the building and will be easily accessed from the existing sidewalk. The building will have a small indoor seating area for up to 15 customers. A handicap accessible bathroom and ramp will enhance pedestrian and sit-down traffic. The exterior of the building will be tastefully finished in an adobe look with a tiled awning, with an emphasis on visual esthetics from all angles. Hours of operation are tentatively scheduled for 5:30 am to 2:30 pm daily. Per an agreement with Supermarket Liquors, employees will park in their existing parking lot or use a bike rack. No on site parking will be available.