KFC hybrid
planned for
neW , center
By JUUE GORDON g —;)'b 1
JulieGordon@coloradoan.com
Kentucky Fried Chicken has
given business a boost by offer-
ing Taco Bell food at many of its
locations.
Already, there are 28 KFC lo-
cations in the United States that
feature Taco Bell food.
The nearest — at least for
now = is in Loveland.
But KFC is planning to open a
combination store in Fort
Collins; at the Mulberry-Lemay
Crossing shopping center.
It would be the center's first
commercial user other than the
new Wal-Mart Supercenter,
scheduled to open in October.
A large home improvement
store also might move into the area
KFC would be able to attract a
lot of customers at the new com-
bination restaurant by virtue of
being next to Wal-Mart, said
Mark 'Goldberg, president of
Goldberg Property Associates,
developer of the Mulberry-
Lemay Crossing shopping center.
"I think. it will be very good
for them and their customers,"
Goldberg said.
KFC officials submitted a pro-
posal to the planning depart-
ment last week and expect to
hear back in the next three
weeks. The new location would
open early next year.
-,,"We think it will be a really
nice store," said Karen Bellini,
real-estate director/secretary for
Harman' Management Corp.,
which operates 300 KFC restau-
rants 'in Colorado, Utah, Wash-
ingfon`,and California.
The KFC-Taco Bell combina-
tionlocations have been successful
— in some instances more suc-
cessful - than traditional KFC
restatuant%' Bellini said. They are
perfect for families where some
members like KFC and others pre-
fer Taco Bell. Parents can get the
chicken they want and Taco Bell
for their children— all in one stop.
The additional revenue KFC
gener2t9by selling Tam Bell food
can help offset the high cost of de-
veloping'the restaurants, Bellini
said. " I'he ground's not cheap," she
said. "Building is not cheap."
We have also taken into consideration the building as an "island" in terms of the overall
site design. Most fast-food restaurants have the drive -through lane wrapping back around
the front of the building. However, we have turned the drive -through lane away from the
building to link -up with the internal drive to the east, keeping the area in front of the
building open for additional landscaping and pedestrian traffic.
In order to present a unified architectural image across the site, we have taken numerous
measures to match the architecture of the neighboring shopping center. First, we have
incorporated both the center's color and material palettes. The KFC and Taco Bell colors
are being used as accent colors. In addition, a masonry wainscot has been provided
around the entire building. The masonry has then been extended up the faces of the KFC
and Taco Bell tower elements. We have also included the gooseneck light fixtures and
the Galvulume metal roofing found on the neighboring center.
The proposed KFC/Taco Bell restaurant will be open Monday through Thursday from
10:00 AM to 10:00 PM, and Friday through Sunday 10:00 am to 12 midnight. At peak
times there can be as many as eight employees, but during normal business hours there
are four to five employees on duty.
In terms of a development schedule, we anticipate receiving a building permit in the
middle of October. It will then take approximately 75 days to complete the site work and
restaurant. The project will be completed and open by late December.
Hopefully, this letter along with the accompanying PDP submittal package have
adequately addressed all of your and the City's requirements and concerns. If you have
any questions please give me a call at (480) 894-4637. Thank you for your assistance.
Sincerely,
*ate
Matthew Pridemore
Architekton
-- orc n it, kton -.
Matthew Pridemore
Architekton
398 S. Mill Ave. #301
Tempe, AZ 85281
(480) 894-4637
July 17, 2001
Ted Sheppard
Current Planning Department
City of Fort Collins
Dear Mr. Sheppard,
I am writing in regards to a new KFC/Taco Bell project proposed at the southeast comer
of South Lemay Avenue and East Magnolia Street, which is part of the Mulberry and
Lemay Crossings Development. A portion of the aforementioned property is being
leased by our client Harman Management Corporation, which will be maintaining both
the building and landscaping within the leased area boundary. As one will see, our site
and building have been designed to both meet and exceed the City's design principles.
The site has been designed to include a considerable amount of open -space for
landscaping. In addition, the landscaping on our site has been designed to blend in with
the landscaping of the entire center in order to present a unified appearance. Large tree -
lined landscape buffers have been provided along all street frontages. As part of this
design a large "park -like" area as been incorporated to the north of the building. This
area not only welcomes pedestrians onto the property, but it provides a nice area in which
to relax and enjoy their meal. Pedestrian paths have been provided to create a promenade
style entrance to the front of the store from all areas of the surrounding property. Per
City requirements, landscape islands have also been provided in the parking lot to break
up the rows of parking stalls.
Great care has also been taken in the design of the vehicular (car and bicycle) and
pedestrian circulation paths across the site. Safety is the most important design criteria.
The building has been positioned on the site to maximize pedestrian access while limiting
pedestrian/vehicular connections. For example, pedestrians at the corner of Lemay and
Magnolia can reach the restaurant without having to cross a driveway or drive -aisle.
398 S Mill Ave, 301 Tempe, AZ 85281
.. 4Yri 894.4538 F
IT 14111111111111
■o
.o
.o ••
0
.o
.m
Mm
0
..
o
-- --i
o � o
0
O
nElFAT
ZZ
mom=
r a r
r
w
a+ m
R1 iD
O
{Ca
<1 R.
Rt
ai
EXTERIOR nNISH SCHEDULE
AWA
C=
LN
iv
TT
T*%
NORTH ELEVATiON
-------------
............ ... . .. ....
..... ......
10 C3
ID
3-
WEST ELEVATION
IM
Flv,imw=
r••.
V4.
IM
KFC/TACO BELL AT
MULBERRI' AND LEM 4 r CRO551NG5
------------; *------**------- 4-*-----------* i
- - _ - _ _ _ _ - _ SOUTH - - -AVENUE _ - _ _ _ _ _ _ _ _
LANDSCAPE PLAN
i
ryryMynyYV MNII'
)'bI.M
� 4sC•�6arWJY
•
1w J�..Jwa.0 M Y
J' Qv M
• J �lrawrFy
a ��i .w'�/al'
l' U� aY
• N�Gs. YJYWC
�M..�-
• rn
• Ww•�aW�W
ars�w
TfJVM
i �`^��TdNYY/•W/
a Kam• d
MY
OO Yew rpm
•Y4n
L •Cw.lw
«N.N.•
sYor
w su..�
..Y,.,, rJ•r
sis mw
�e.•..
Y rec. r•..mnrlY
.•O•r
OryA
JIMIYW
p%fJJf§rja
�YW.+a
M .oc. vlwWlY
�• +W.-�/Wb'
'U!/�/O/�(/f!�(/�T�
TwrMwu'
YM
Y .' 0.C. mwmYl••
.wwY
I Yrr
J+ .' oc vNyIY
uns
va.' JNu
�� ....ou.•g •umYpW
uxw
u.•
JW
WO.
y
�M
•u�y�.
or vegrq ...n s.Wp�.
M•Yy.
.YYw.Wn. n'I Y�w•.wrf la Ywlo...�.n.
r.wAr�W r.lM:Wuv r+
YYY0. NY�p•yayYyy/MnY YY w.n wlrwY.nrrW
wY1wM �n=rs wyuW Y�iu
•W w•Ywr�wwNlYbr�•W wfWa�
n�«/Y•n�n•W
a nw w ram• wW.w
wYli4u•ayn.NNb.•w
.w ..Y rnrw �•,r. N.wY wxl•n
.v.rWrvJa •••w WII.�
aaW N'Y rr VwY
...r.
�.erlra�w .. o-.J •....w
..w.. TM�..II�w
.�I.•
• A wrlm. rrMnY
.rl wrWh nrm+r.wrrw•rwr
r�wn � r ++rN.u.
�urpw�Wul•rrTw•r•.�•
Cnv� Y�r JYP ry a.�� r1w n• YrN.9.
Y•.YWYI•W Wr WN.n+W wa
w rWJry rW M..
t �e�w�b�r. aV•ru.'.. rs
av ANnww�w
M rvaw nw+,YY+N•W
w«.I>+or
�aNnWWiuwr)'=
a A vws[T Gwwt/Wli��w�.w Wbr\
.nw 9.Y.rN4w w. wY�Iq'IY/r.eJw.
Jya�..nw.Vrunn.^. n'Y—�
Y•Y4
"""•a
n �+Y. W..r.n W w'., �.w�nl.
_ ��Y.W..
r ...n r.. rr.•..Yrwow w ..n�.r rw�r._
n sr..r Npw� rrw •w-• A�n 1rYn wWV�4 NY•wN
•YwNY �+Wr�JrY •'JWrw.
� �q��W W.We•r•r'I •we MwW
rb`�yn. r.mw
n. w�r.....�.�r.r •Ww. m.+rr.
YrwM�.W Yr Y•YN•a•r WN.Ir.
wNmYW
Wy'N4NwIrYWYrynl•. yYa •rlau
a Ywa.wr.wY l.Y'r WJ Y.rua Yn �.
��.b r�W.Jr Nru W^YBuw
(CUSTOM)
00155
7/2/01
2af4
AL.
MULBERRY-LEMAY CROSSINGS, PHASE THREE,
KF:C:/TAC:C BELL, PORTION OF LOT ro, FILING TWO
........................................................ .......................... ....... .... . ................ - - 11 - . - ............................................................................... -
-.- - ---- ---------- - .......... ------------------------------------ - -----
-------
----------------------- ...... ------------------- ------------------- -------- -- - ------- - --- -------
m �l
(CUSTOM)
7/2/01
1 of 4
No Text
Mulberry — Lemay Crossings, Phase Three, K.F.C./Taco Bell, PDP, #36-96F
January 17, 2002 P & Z Meeting
Page 7
C. Transportation and Circulation — Section 3.6
(1.) Section 3.6.4(C) — Transportation Impact Study
This standard requires that a T.I.S. be submitted to identify those facilities
that may be required to meet Level of Service standards for vehicles,
bicycles and pedestrians.
A T.I.S. was done for the entire shopping center in conjunction with the
Preliminary P.U.D. This study assumed that there would be approximately
26,000 square feet of "high -turnover (sit down) restaurant."
While the proposal is considered a "drive-in" restaurant, it is only 3,661
square feet in size. Accordingly, the city traffic operations engineer has
determined that the impact of the K.F.C./Taco Bell is sufficiently
accounted for in the trip generation assumptions for the overall shopping
center. All affected intersections, street widening, and other traffic -related
public improvements for this center have been completed with Filing One
(Wal-Mart).
4. Findings of Fact/Conclusion:
In evaluating the request for K.F.C./Taco Bell at Mulberry — Lemay Crossing
Shopping Center, Staff makes the following findings of fact:
A. The land use, drive-in restaurant, is a permitted use, subject to Planning
and Zoning Board review, in the C, Commercial zone district.
B. The P.D.P. complies with the applicable Development Standards of the
Commercial zone (Article Four).
C. The P.D.P. satisfies the applicable General Development Standards
(Article Three).
RECOMMENDATION:
Staff recommends approval of Mulberry — Lemay Crossing, Phase Three,
K.F.C./Taco Bell P.D.P., #36-96F.
Mulberry — Lemay Crossings, Phase Three, K.F.C./Taco Bell, PDP, #36-96F
January 17, 2002 P & Z Meeting
Page 6
The P.D.P. provides two walkways connecting the north and west
entrances to the public sidewalk along Magnolia Street. Neither of these
walkways cross a drive aisle.
(2.) Section 3.5.3(B)(2) — Orientation to Build -to Lines for Streetfront
Buildings
This standard requires that buildings form a consistent relationship to the
public street in order to form visually continuous, pedestrian -oriented
street fronts with no vehicle use area between the building and the street.
This is the "build -to" line standard, which calls for a 15-foot setback from
Magnolia Street. The P.D.P. satisfies the exception to this standard by
providing an outdoor landscaped space with picnic tables. This is an
attractive space designed for outdoor dining.
(3.) Section 3.5.3(D)(1) — Character and Image and Site Specific
Design
This standard requires that building design contribute to the shopping
center in terms of materials, color and features so the center forms a
cohesive place.
The P.D.P. features a building design the complements the architectural
theme of the overall shopping center. The standardized prototype has
been modified to incorporate similar exterior materials and elements as
the Wal-Mart and the specifications called for on the approved P.U.D. for
Mulberry — Lemay Crossings, Filing Two, Final P.U.D.
(4.) Section 3.5.3(D)(2) — Fagade Treatment
This standard requires that building facades feature no blank walls and
provide sufficient variety to promote a pedestrian scale and visually
interesting architecture.
The P.D.P. provides two types of exterior materials; jumbo brick with
sandblast finish as a wainscot, and synthetic stucco for the walls. The
roofline is capped by a cornice. There are two projecting elements
highlighting the north and west entrances. One of these projections
features a small pitched roof, colonial red, as an accent that matches the
window awnings. The building features an obvious base, middle and top
in compliance with the standards.
Mulberry — Lemay Crossings, Phase Three, K.F.C.iTaco Bell, PDP, #36-96F
January 17, 2002 P & Z Meeting
Page 5
The P.D.P. provides an eight foot wide walkway that connects the
entrance to the crosswalk on Magnolia Street. An eight -foot wide walkway
along the south property line connects Lemay Avenue to the balance of
the shopping center. Crosswalks are provided wherever there is a drive
aisle.
(8.) Section 3.2.2(H) — Drive-in Facilities
This standard requires that drive -through facilities be secondary in
emphasis to other access and circulation functions, and not interrupt
pedestrian access.
The drive -through lane, menu board, pick up window are all located on the
east side of the building facing the internal shopping center, not Lemay
Avenue. A direct sidewalk connection to Magnolia does not cross the
drive -through lane. The stacking for both entering and exiting the drive -
through lane is adequate and does not interfere with walkways.
(9.) Section 3.2.2(K)(2) — Parking
This standard requires that the P.D.P. not exceed 15 spaces per 1,000
square feet or 54 spaces.
The P.D.P. provides 33 spaces which is below the allowable maximum.
(10.) Section 3.2.4 — Lighting
This standard requires that lighting not exceed specified maximum foot-
candles and conform with shopping center lighting.
The P.D.P. provides for illumination levels that do not exceed the
standards. The light source, high pressure sodium, and fixtures, will
match the approved lighting for Mulberry — Lemay Crossing, Filing Two,
Final P.U.D.
B. Mixed -Use, Institutional and Commercial Building Standards — Section 3.5
(1.) Section 3.5.3(B)(1) — Orientation to a Connecting Walkway
This standard requires that at least one entrance face and open directly
onto a connecting walkway.
Mulberry — Lemay Crossings, Phase Three, K.F.C./Taco Bell, PDP, #36-96F
January 17, 2002 P & Z Meeting
Page 4
The P.D.P. provides continuous shrub beds around the parking lot and
drive -through lane.
(3.) Section 3.2.1(E)(5) — Parking Lot Interior Landscaping
This standard requires that at least 10% of the parking lot feature
landscape islands.
The P.D.P. provides 10% interior landscaping in the form of islands.
(4.) Section 3.2. 1 (E) (5) (d) (e) — Walkways, Driveways, Parking Bays
These standards require that connecting walkways and driveways feature
one shade tree per 40 lineal feet and that there be a landscape island
every 15 parking stalls.
The P.D.P. provides shade trees along all walkways and the drive -through
lane. Landscape islands are provided every 10 parking stalls.
(5.) Section 3.2.1(E)(6) — Screening
This standard requires that landscape and building elements screen areas
of low visual interest.
The P.D.P. provides a solid screen for the trash dumpster and screening
on three sides for the electrical transformer. The drive -through lane is
screened by a double row of shade trees and a continuous shrub bed.
(6.) Section 3.2.2(C)(3) — Site Amenities
This standard requires site amenities that enhance safety and
convenience and promote walking or bicycling.
The P.D.P. provides an outdoor gathering space featuring shade trees
and picnic tables located near the entrance.
(7.) Section 3.2.2(C)(5) — Walkways
This standard requires walkways be provided that are direct, continuous
and link street sidewalks with building entries.
Mulberry — Lemay Crossings, Phase Three, K.F.C./Taco Bell, PDP, #36-96F
January 17, 2002 P & Z Meeting
Page 3
B. Development Standards
Section 4.17(E)(2)(a) states:
"Pedestrian -oriented outdoor spaces shall be placed next to activity areas
that generate the users (such as street corners, shops, stores, offices, day
care and dwellings). Because liveliness created by the presence of people
is the main key to the attractiveness of such spaces, to the maximum
extent feasible, the development shall link outdoor spaces to and make
them visible from streets and sidewalks. Sculpture, kiosks or shelters are
encouraged to be prominently placed in outdoor spaces."
The orientation of building is intended to create a visually interesting and
pedestrian -oriented streetscape along Magnolia Street. With the front door
facing Magnolia, and an outdoor lawn area located between building entrance
and public sidewalk, an area is provided for outdoor picnic tables. An eight -foot
wide walkway connects the public sidewalk to the building entrance without
crossing an intervening drive aisle.
It is anticipated that future development of Mulberry — Lemay Crossing, Filing
Two will also orient a building along Magnolia to contribute to the positive
relationship of placing buildings along public streets.
3. Compliance with Applicable General Development Standards:
A. Site Planning and Design Standards — Section 3.2
(1) Section 3.2. 1 (D) (1) (c) (2) — Full Tree Stocking
This standard requires trees be planted in adequate numbers along high
visibility areas and that street trees be planted along public streets.
The P.D.P. provides trees around the building and parking lot. A mix of
shade and evergreen trees are provided. Ornamentals are included for
variety.
(2.) Section 3.2. 1 (E) (4) (a) (b) — Parking Lot Perimeter Landscaping
These standards require that access, circulation and parking areas be
adequately screened by trees and shrubs.
Mulberry — Lemay Crossings, Phase Three, K.F.C./Taco Bell, PDP, #36-96F
January 17, 2002 P & Z Meeting
Page 2
COMMENTS
1. Background:
The surrounding zoning and land uses are as follows:
N: C; Wal-Mart
S: C, Vacant (Lot 6, Mulberry-Lemay Crossings, Filing Two)
E: C; Vacant (Lot Two, Mulberry-Lemay Crossings, Filing Two)
W: CCR; Link `N Greens Golf Course
Historically, the site has been part of a 51 acre irrigated agricultural field. The
area was annexed in 1995 as part of a larger 39 acre annexation that also
included Buffalo Run Apartments. The Mulberry-Lemay Crossings Overall
Development Plan was approved on March 24, 1997. Buffalo Run Apartments
Final P.U.D. was approved on October 2, 1997.
The Planning and Zoning Board denied the Preliminary P.U.D. for the 42.98 acre
community/regional shopping center on November 5, 1998. The Preliminary
P.U.D. was then considered on appeal to City Council, which upheld the denial
on December 15, 1998. The project was then the subject of a voter initiative and
presented to the general electorate. On April 7, 1999, the electorate voted to
overturn the City Council denial and approve the Preliminary P.U.D., as
conditioned by Staff.
Mulberry Lemay Crossings, Filing One, Final P.U.D. was approved by City
Council on March 28, 2000. Mulberry Lemay Crossings, Filing Two was
approved by the Planning and Zoning Board on December 7, 2000. The
Certificate of Occupancy for Wal-Mart was issued in October of 2001.
2. Compliance with Commercial Zone District:
A. Land Use
The land is classified as a "drive-in restaurant' which is permitted as a Type Two
use in the Commercial zone.
ITEM NO. 1
MEETING DATE 1 17 02
STAFF Ted Shepard
Citv of Fort Collins PLANNING AND ZONING BOARD
STAFF REPORT
PROJECT: Mulberry — Lemay Crossings, Phase Three, K.F.C./Taco Bell
P.D.P. #36-96F
APPLICANT: Harman Management Corporation
C/o Mr. Mathew Pridemore
Architekton
398 South Mill Avenue, Suite 301
Tempe, AZ 85281
OWNER: Goldberg Property Associates, Inc.
1120 Lincoln Street, Suite 1101
Denver, CO. 80203
PROJECT DESCRIPTION:
This is a request for a 3,661 square foot drive -through restaurant on 1.08 acres
on a portion of Lot 6 of Mulberry — Lemay Crossings Shopping Center, Filing
Two. The parcel is located on the southeast corner of Lemay Avenue and
Magnolia Street. The property is zoned C, Commercial.
RECOMMENDATION: Approval
EXECUTIVE SUMMARY:
A. The land use, drive-in restaurant, is a permitted use, subject to Planning
and Zoning Board review, in the C, Commercial zone district.
B. The P.D.P. complies with the applicable Development Standards of the
Commercial zone (Article Four).
C. The P.D.P. satisfies the applicable General Development Standards
(Article Three).
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. PO. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
PLANNING DEPARTMENT