From: Eric Bracke
To: Ted Shepard
Date: Wed, Aug 1, 2001 11:26 AM
Subject: Mulberry/Lemay Crossing - Phase 3 PDP
Here are my comments on the above -stated project:
1. The TIS submitted with the plans is dated September 1997 - this is out of date and will require a full
update.
2. Fast food restaurant was not including in the original TIS - this too will require a full update
3. With all of the APF issues in this area and considering the political climate, especially with the P&Z
Board, I would like to see the new study obtain new traffic counts after all the roadways are open and
WalMart is up and running.
4. 1 have serious problems with allowing the project to move forward prior to an updated TIS. My main
concern will be the Vine/Lemay intersection. The project does have some "vested" trips and we will need
to evaluate the differences between the original TIS and the new TIS as well as the actual trips
WallyWorld is generating.
Have fun
Eric
CC: Cameron Gloss; Kathleen Reavis; Ward Stanford