Matthew Pridemore
Architekton
398 S. Mill Ave. #301
Tempe, AZ 85281
Ph: (480) 894-4637
Fx: (480) 894-4638
December 10, 2001
Ted Sheppard
Chief Planner
Current Planning
281 N. CoIlege Ave.
P.O. Box 580
Fort Collins, CO 80522-0580
Mr. Sheppard,
I am writing in regards to the KFC/Taco Bell project at the Mulberry/Lemay Crossings development. This
letter is in response to your written comments dated 12/4/01 and are as follows:
1. The attached "General Notes" have been added to the site plan. Please see Sht 1 of 4.
2. The site lighting plan has been revised to match the light levels for Filing Two. Please see
Sht. E L 1. The site lighting note has also been added to the general notes found on the site plan.
Please see Sht. 1 of 4.
3. The signage note has been added to the general notes found on the site plan. Please see
Sht. 1 of 4.
4. A parking space at the end of the aisle has been striped to provide a turn -around point for cars at
the end of the parking lot.
5. The east -west sidewalk has been aligned with the crosswalk to the east. The cross -walk has beer
angled to account for the shift. Please see Sht. 1 of 4.
6. While there were no comments regarding the exterior elevations, copies have been provided as a
courtesy.
Hopefully, this letter along with the accompanying revised plans has adequately addressed all of your
questions and concerns. If you have any questions please do not hesitate to give me a call at (480) 894-
4637. Thank you for your assistance.
Sincerely,
Matthew Pridemore
Architekton
Account Manager
398 S Mill Ave, 301 Tempe, AZ 85281
480 894.4637 T 480 894.4638 F