Loading...
HomeMy WebLinkAboutMULBERRY AND LEMAY CROSSINGS, 2ND FILING, HOME DEPOT - MAJOR AMENDMENT - 36-96I - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORT0- DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES FIGURE 1: SITE VICINITY MAP PROPOSED HOME DEPOT - NORTH FORT COLLINS NIE/C OF MULBERRY ST. AND LEMAY AVE. FORT COLLINS, COLORADO Rjd mw. DAR �e ps@ ra c on Rejxl No. 2 �'� By.re@m Sal- 301 N. Howes Street Checked By DAR Dow. Apgwed By DAR Dm W. Fort Collins, Colorado 80521 File Nem- 20036085-1 Figwe N -- —-Geotechnical-Frigihed�ing Exploration ----- -.-- -_ - .-___ _._ ....- .__.... lrerracan Proposed Home Depot Store N/E/C East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Project No. 20035085 in the design and specifications. Terracon also should be retained to provide testing and observation during excavation, grading, foundation and construction phases of the project. The analysis and recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this report. This report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either express or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations. contained in this report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing. 15 - Ge6teec—f rllcaf Engineering Exploration — _._:_ .. .. - lrerracon _ .-....._ Proposed Home Depot Store N/E/C East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Project No. 20035085 Corrosion Protection A laboratory test was conducted on the following soil sample for- in -situ resistivity characteristics, as requested in the Home Depot Geotechnical Engineering Guidelines. This value, in our opinion is generally representative for the soils encountered on -site and should be used to determine potential corrosive characteristics of the on -site soils with respect to contact with the various underground materials which will be used for project construction. W.Y�"5ry'- b Lust BonnjiN�ob .' t rEII MI W o�... Dept ,1b t esistivity+OyH[phM Centimeters',. , Lm.n�`'.uRw"f�Ylrv""'NI4ti JM� 1 4 4800 Results of soluble sulfate testing indicate that ASTM Type I Portland cement is suitable for all concrete on and below grade. However, if there is no, or minimal cost differential, use of ASTM Type II Portland cement is recommended for additional sulfate resistance of construction concrete. Foundation concrete should be designed in accordance with the provisions of the ACI Design Manual, Section 318, Chapter 4. Surface Drainage Positive drainage should be. provided during construction and maintained throughout the life of the proposed project. In areas where sidewalks or paving do not immediately adjoin the structure, we recommend that protective slopes be provided with a minimum grade of approximately 5 percent for at least 10 feet from perimeter walls. Backfill against footings; exterior walls, and in utility and sprinkler line trenches should be well compacted and free of all construction debris to reduce the possibility of moisture infiltration. Downspouts, roof drains or scuppers should discharge into splash blocks or extensions when the ground surface beneath such features is not protected by exterior slabs or paving. Sprinkler systems should not be installed within 5 feet of foundation walls. Landscaped irrigation adjacent to the foundation system should be minimized or eliminated. GENERAL COMMENTS Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations 14 - ---------- — --------------------------- Geotechnical Engineering Exploration Proposed Home Depot Store N/EIC East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Project No. 20035085 The soils to be penetrated by the proposed excavations may vary significantly across the site. The preliminary soil classifications are based solely on the materials encountered in widely spaced exploratory test borings. The contractor should verify that similar conditions exist throughout the proposed area of excavation. If different subsurface conditions are encountered at the time of construction, the actual conditions should, be evaluated to determine any excavation modifications necessary to maintain safe conditions. As a safety measure, it is recommended that all vehicles and soil piles be kept to a minimum lateral distance from the crest of the slope equal to no less than the slope height. The exposed slope face should be protected against the elements. Additional Design and Construction Considerations Exterior Slab Design and Construction Exterior slabs -on -grade, exterior architectural features and utilities founded on or in backfill may experience some movement due to the volume change of the backfill. Potential movement could be reduced by: • minimizing moisture increases in the backfill • controlling moisture -density during placement of backfill • using designs which allow vertical movement between the exterior features and adjoining structural elements • placing effective control joints on relatively close centers Underground Utility Systems All piping should be adequately bedded for proper load distribution. It is suggested that clean, graded gravel compacted to 75 percent of Relative Density ASTM D4253 be used as bedding. If utilities are excavated below groundwater, temporary dewatering will be required during excavation, pipe placement and backfilling operations for proper construction. Utility trenches should be excavated on safe and stable slopes in accordance with OSHA regulations as discussed above. Backfill should consist of the on -site soils or imported material approved by the geotechnical engineer. The pipe backfill should be compacted to a minimum of 95 percent of Standard Proctor Density ASTM D698. 13 r _. .------- Geotechnical Engineering Exploration -Proposed Home Depot Store N/E/C East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Project No. 20035085 W2 Subgrade Preparation irerfacan Subgrade soils beneath any fill materials, interior and exterior slabs should be scarified, moisture conditioned and compacted to a minimum depth of 12-inches. The moisture content and compaction of subgrade soils should be maintained until. slab or pavement - construction. Fill Materials and Placement On -site soils free of debris or deleterious materials or approved imported materials may be used as fill material and are suitable for use as compacted fill beneath exterior slabs. Imported soils (if required) should conform to the following: Gradation Percent finer by weight (ASTM C136) 3"..........................................................................................................100 No. 4 Sieve .................. :..................................................................... 30-80 No. 200 Sieve...............................................................................50 (max) • Liquid Limit.......................................................................30 (max) • Plasticity Index..................................................................15 (max) Engineered fill should be placed and compacted in horizontal lifts, using equipment and procedures that will produce recommended moisture contents and densities throughout the lift. It is recommended all fill material to placed on the site be compacted to at least 95 percent of Standard Proctor Density ASTM D698. On -site clay soils for backfill or grading purposes should be compacted within a moisture content range of 1 percent below, to 3 percent above optimum. Imported or on -site granular soils should be compacted within a moisture range of 3 percent below to 3 percent above optimum unless modified by the project geotechnical engineer. Excavation and Trench Construction Excavations into the on -site soils may encounter a variety of conditions. The individual contractor(s) should be made responsible for designing and constructing stable, temporary excavations as required to maintain stability of both the excavation sides and bottom. All excavations should be sloped or shored in the interest of safety following local, and federal regulations, including current OSHA excavation and trench safety standards. 12 Geotechnical Engineering Exploration - ercacon Proposed Home Depot Store N/E/C East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Project No. 20035085 Based upon the subsurface conditions determined from the geotechnical exploration, subgrade soils exposed during construction are anticipated to be relatively stable. For pavement areas, the 2 foot zone of re -processed material to the specified moisture tolerances could lend to creating an unstable subgrade. However, the stability of the subgrade may be affected by precipitation, repetitive construction traffic or other factors.. Overexcavation of wet zones and replacement with granular materials may be necessary. Use of lime, fly ash, kiln dust, cement or geotextiles could also be considered as a stabilization technique, if swell mitigation is required. Laboratory evaluation is recommended to determine the effect of chemical stabilization on subgrade soils prior to construction. Lightweight excavation equipment may be required to reduce subgrade pumping. Site Preparation Strip and remove existing landscaping, fill, debris, and other deleterious materials from proposed building areas as previously mentioned. All exposed surfaces should be free of mounds and depressions that could prevent uniform compaction. The site should be initially graded to create a relatively level surface to receive fill, and to provide for a relatively uniform thickness of fill beneath proposed building structures. All exposed areas which will receive fill, once properly cleared and benched where necessary, should be scarified to a minimum depth of eight inches, conditioned to near optimum moisture content, and compacted. Although evidence of underground facilities such as septic tanks, cesspools, or basements were not observed during site reconnaissance, such features could be encountered during construction. If existing underground utilities conflict with the proposed construction, the relocation of these utilities should be addressed during design stages of the project. If unexpected fills or underground facilities are encountered, such features should be removed and the excavation thoroughly cleaned prior to backfill placement and/or construction. It is anticipated that the majority of the excavations for the proposed construction can be accomplished with conventional earthmoving equipment. Geotechnical Engineering Exploration Proposed Home Depot Store N/E/C East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Project No. 20035085 lrerraron Where the design includes restrained elements, the following equivalent fluid pressures are recommended: • At rest: Cohesive soil backfill (on -site clay) ......................................... 65 psf/ft Cohesionless soil backfill (on -site or imported sand)..............55 psf/ft On -site bedrock materials .......................... not recommended for use • Coefficient of base friction....................................................0.35 • Adhesion at base of footing.............................................500 psf The lateral earth pressures herein do not include any factor of safety and are not applicable for submerged soils/hydrostatic loading. Additional recommendations may be necessary if submerged conditions are to be included in the design. Fill against grade beams and retaining walls should be compacted to densities specified in Earthwork. Compaction of each lift adjacent to walls should be accomplished with hand - operated tampers or other lightweight compactors. Overcompaction may cause excessive lateral earth pressures, which could result in wall movement. Seismic Considerations The project site is located in Seismic Risk Zone I of the Seismic Zone Map of the United States as indicated by the 1997 Uniform Building Code. Based upon the nature of the subsurface materials, a soil profile type Sc should be used for the design of structures for the proposed project (1997 Uniform Building Code, Table No. 16-J). Liquefaction potential is negligible, and the need for seismic response spectrum is not necessary. Earthwork General Considerations The following presents recommendations for site preparation, excavation, subgrade preparation and placement of engineered fills on the project. All earthwork on the project should be observed and evaluated by Terracon. The evaluation of earthwork should include observation and testing of engineered fill, subgrade preparation, foundation bearing soils, . and other geotechnical conditions exposed during the construction of the project. 10 - - ------—--... -.... - - - ._. . Geotechnical Engineering Explora—tion--------- Proposed Home Depot Store N/E/C East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Project No. 20035085 lferracon Aggregate base course and select subbase should be placed in lifts not exceeding six inches and should be compacted to a minimum of 95% Standard Proctor Density (ASTM D698). Asphalt concrete should be composed of a mixture of aggregate, filler and additives, if required, and approved bituminous material. The asphalt concrete should conform to approved mix designs stating the Hveem and/or Superpave properties, optimum asphalt content, job mix formula and recommended mixing and placing temperatures. Aggregate used in asphalt concrete should meet particular gradations meeting Colorado Department of Transportation Grading S, SX or SG specifications. Mix designs should be submitted prior to construction to verify their adequacy. Asphalt material should be placed in maximum 3-inch lifts and should be compacted within a range of 92 to 96% of Maximum Theoretical Density. Preventative maintenance should be planned and provided for through an on -going pavement management program in order to enhance future pavement performance. Preventative maintenance activities are intended to slow the rate of pavement deterioration, and to preserve the pavement investment. Preventative maintenance consists of both localized maintenance (e.g. crack sealing and patching) and global maintenance (e.g. surface sealing). Preventative maintenance is usually the first priority when implementing a planned pavement maintenance program and provides the highest return on investment for pavements. Recommended preventative maintenance policies for asphalt and jointed concrete pavements, based upon type and severity of distress, are provided. Prior to implementing any maintenance, additional engineering observation is recommended to determine the type and extent of preventative maintenance. Lateral Earth Pressures For soils above any free water surface, recommended equivalent fluid pressures for unrestrained foundation elements are: • Active: Cohesive soil backfill (on -site clay) ......................................... 50 psf/ft Cohesionless soil backfill (on -site or imported sand)..............40 psf/ft Passive: Cohesive soil backfill (on -site clay).......................................250 psf/ft Cohesionless soil backfill (on -site or imported sand) ............ 350 psf/ft 9 t - Geotechriical Engineering Exploration lrerracon Proposed Home Depot Store N/E/C East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Project No. 20035085 Local drainage characteristics of proposed pavement areas are considered to vary from fair to good depending upon location on the site. For purposes of this design analysis, fair drainage characteristics are considered to control the design. These characteristics, coupled with the approximate duration of saturated subgrade conditions, result in a design drainage coefficient of 1.0 when applying the AASHTO criteria for design. For flexible pavement design, a terminal serviceability index of 2.0 was utilized along with an inherent reliability of 70%, and a design life of 10 years. Using an estimated design R-value of 10, appropriate ESAL/day, environmental criteria and other factors, the structural numbers (SN) of the pavement sections were determined on the basis of the 1993 AASHTO design equation. In addition to the flexible pavement design analyses, a rigid pavement design analysis was completed, based upon AASHTO design procedures. Rigid pavement design is based on an evaluation of the Modulus of Subgrade Reaction of the soils (K-value); the Modulus of Rupture of the concrete, and other factors previously outlined. The design K-value of 150 for the subgrade soil was determined by correlation to the laboratory tests results. A modulus of rupture of 650 psi (working stress 488 psi) was used for pavement concrete. The rigid pavement thicknesses for each traffic category were determined on the basis of the AASHTO design equation. 'Z�M,t�t, � 'F � � Recommended � J yfYy.� Pavement Thicknesse"nches) hhJYj+� �dT yir. ^+ U6F1 i. k�'{kigwY'�^ j'F 0"-, °Traffic Area ' :sFvd. ',1Tgmrt �Altematrve Asphalt Concrete `� s z ;_ • m „ g x :a w Surface GradInS or = A re ate Base 99 9 . i o - jCourse- `� r flPortland Cementk E y, r �Covnecrete a" �". wxTotal ; ,° ,11 �`.t�� ,€� ad`t'(Y�tFS�i �JJ:R:.j`rawaY Kft ll1 $'' F'�'Ifi,JR�'h�''�4�. 'b`r�hF( �`ni� �S`�:...n. vi.•}�i.3L. .y�r ��1.l.V.wa.....'^i C Ci :itiY'� A 3-1/2 6 9-1/2 Automobile Parking B 5-1/2 5-1/2 Heavy A 4 9 13 Volume Main Traffic B 6 6 Corridors Each alternative should be investigated with respect to current material availability and economic conditions. Rigid concrete pavement, a minimum of 6 inches in thickness, is recommended at the location of dumpsters where trash trucks park and load. Aggregate base course (if used on the site) should consist of a blend of sand and gravel, which meets strict specifications for quality and gradation. Use of materials meeting Colorado Department of Transportation (CDOT) Class 5 or 6 specifications is recommended for base course. Use of materials meeting Colorado Department of Transportation Class 1 specifications is recommended for select subbase. Geotechnical Engineering Exploration lferra�ari !� Proposed Home Depot Store N/E/C East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Project No. 20035085 within the floor slab and relative to the foundation should be limited to 1-inch or less. The controlled fill procedure will not fully eliminate the possibilities of slab heave; but movements should be reduced and tend to be more uniform. For structural design of concrete slabs -on -grade, a modulus of subgrade reaction of 150 pounds per cubic inch (pci) may be used for floors supported on existing fill material and/or native subsoils. Additional floor slab design and construction recommendations are as follows: • Positive separations and/or isolation joints should be provided between slabs and all foundations, columns or utility lines to allow independent movement. • Control joints should be provided in slabs to control the location and extent of cracking. • Interior trench backfill placed beneath slabs should be compacted in accordance with recommended specifications outlined below. • In areas subjected to normal loading, a minimum 6-inch layer of clean -graded gravel should be placed beneath . interior slabs. For heavy loading, reevaluation of slab and/or base course thickness may be required. The concrete should contain polypropylene fibers. It is recommended a moisture vapor barrier be installed if moisture sensitive floor coverings are to be used. • Floor slabs should not be constructed on frozen subgrade. • Other design and construction considerations, as outlined in the ACI Design Manual, Section 302.1 R are recommended. Pavement Design and Construction Design of pavements for the project have been based on the procedures outlined in the 1993 Guideline for Design of Pavement Structures by the American Association of State Highway and Transportation Officials (AASHTO). Areas within proposed pavements on the site will be divided into two categories based upon anticipated traffic and usage. Traffic criteria provided for pavement thickness designs are to include single 18-kip equivalent single axle loads (ESAL's) of 50,000 for automobile parking, and 220,000 for heavy volume and/or fire truck access areas, as provided by the client. 7 - -----..-._....---------rin----------ti Geotechnical Engineering Exploration Proposed Home Depot Store N/E/C East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Project No. 20035085 B = Width of footing foundation (ft) L = Length of footing foundation (ft) W = Weight of footing + weight of soil directly over the top of the footing/block (Ibs) 1rerracon "A unit weight (y) of 120 pcf is recommended for soil (either undisturbed or compacted backfill) at this site. The design uplift resistance should be calculated by dividing the ultimate resistance obtained from the equation above by an appropriate factor of safety. A factor of safety of at least 2 is recommended for live uplift loads in the analysis. , In addition, it is imperative that positive drainage be maintained during construction and throughout the life of the facility to minimize the potential for surface water infiltration. It is Terracon's opinion that sub -excavation, if deemed necessary during a foundation excavation observation, and replacement with controlled fill combined with good positive drainage will minimize the settlement/expansive potential and will create a more stable bearing stratum. Exterior footings should be placed a minimum of 30 inches below finished grade for frost protection and to provide confinement for the bearing soils. Finished grade is the lowest adjacent grade for perimeter footings. Footings should be proportioned to reduce differential foundation movement. Proportioning on the basis of equal total movement is recommended; however, proportioning to relative constant dead -load pressure will also reduce differential movement between adjacent footings. Total settlement resulting from the assumed structural loads is estimated to be on the order of 1-inch or less. Differential settlement is estimated to be on the order of'h-inch within 50-feet and'/<- inch over the length of the building. Additional foundation movements could occur if water from any source infiltrates the foundation soils; therefore, proper drainage should be provided in the final design and during construction. Floor Slab Design and Construction Some differential movement of a slab -on -grade floor system is possible should the subgrade soils become elevated in moisture content. To reduce potential slab movements to within the maximum allowable tolerance allowed by Albertson's, slabs should bear upon a minimum of 3- feet of moisture controlled over -excavated and replaced material. Depending upon the extent of overlot grading, over -excavation and replacement of the existing subgrade soils may be required to achieve the 3-feet depth of controlled fill material. The preparation of the pad should extend horizontally ten feet beyond the building envelope. The maximum differential movement 0eotechnical Engineering Exploration 1ruraron Proposed. Home Depot Store N/E/C East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Project No. 20035085 • Conventional -type Spread Footings bearing on undisturbed native subsoils and/or existing .fill material bearing a minimum of 3-feet above maximum anticipated groundwater levels. Foundations and masonry walls should be reinforced as necessary to reduce the potential for distress caused by differential foundation movement. The use of joints at openings or other discontinuities in masonry walls is recommended. Foundation excavations and foundation subgrade preparation should be observed by Terracon. If the soil conditions encountered differ significantly from those presented in this report, supplemental recommendations will be required. Slab -on -grade construction is considered acceptable for use, provided that design and construction recommendations are followed. Foundation Systems — Conventional Type Spread Footings Due to the anticipated loads, the type of construction proposed and the soil conditions encountered, it is recommended the proposed structures be supported using a conventional type spread footing foundation system founded on undisturbed native subsoils and/or existing fill material a minimum of 3-feet above the maximum anticipated groundwater levels. If areas of the fill material are deemed unsuitable during the foundation excavation observation, the fill material should be overexcavated to a suitable stratum, to be determined at that time, moisture conditioned at or near optimum moisture content, and replaced in uniform lifts which are mechanically compacted to at least 95 percent of Standard Proctor Density ASTM D698. Spread footings bearing uponcontrolled fill material may be designed for a net allowable bearing pressure of 1,500 psf. In addition, the footings should be sized to maintain a minimum dead load pressure of 500 psf. Reinforced concrete foundations, cast in excavations against undisturbed subsoils are recommended for resistance to uplift for the proposed canopy structure. Footing or dead -man foundations may be designed using the cone ' method. The equation for determining the ultimate uplift capacity as a function of footing or dead -man foundation dimension, foundation depth, and soil weight is presented below: T„=0.4xy xD2x(B+L)+W Where: T„= Ultimate uplift capacity (Ibs) y = Unit weight of soil (Ibs/ft3)" D = Depth to base of footing foundation below final grade (ft) 5 I beotec- nical Engineering Exploration Proposed Home Depot Store N/E/C East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Project No. 20035085 1ferracon bedrock below was native sands and gravels. Siltstone/claystone was encountered in Test Boring Nos. 1 through 21 at approximate depths of 17 to 23-feet below existing site grades and extended to the depths explored, approximately 25-feet. Based on the surface elevations obtained from the test borings drilled within the building footprint and the approximate depth at which bedrock was encountered in these borings, we have included, in Appendix A, a bedrock contour map, Figure No. 3, illustrating the general bedrock contour/profile. Field and Laboratory Test Results Field and laboratory test results indicate the native granular soils are medium dense in relative density and exhibit low expansive potential and moderate bearing capabilities. The existing fill material exhibits low expansive potential and moderate load bearing capabilities. The siltstone/claystone bedrock is moderately hard to hard, exhibits moderate to high expansive potential and moderate to high load bearing characteristics. The in -situ fill material appears suitable to support the proposed construction, however, a thorough foundation excavation observation should be performed to verify the competency and consistency of the fill material prior to any placement of concrete. Groundwater Conditions Groundwater was encountered in various borings across the site at approximate depths of 6-1/2 to 10-feet below existing site grades when checked approximately 1 to 2 days after initial drilling operations. These observations represent groundwater conditions at the time of the field exploration, and may not be indicative of other times, or at other locations. Groundwater levels can be expected to fluctuate with varying seasonal and weather conditions. The estimated piezometric surface was developed for the Home Depot building pad area based on the groundwater measurement data obtained from the building related test borings. The groundwater contour map for this portion of the site based on the piezometric data is included with this report as Figure No. 4. The piezometric surface was estimated using linear interpolations between test borings and bore hole groundwater measurements at the time of this study. As illustrated from Figure No. 4, the groundwater flow was estimated to be in the east to slightly southeast directions. ENGINEERING RECOMMENDATIONS Geotechnical Considerations The site appears suitable for the proposed construction from a geotechnical engineering point of view. The following foundation system was evaluated for use on the site for the proposed structures: .4 I= Geotechnical Engineering Exploration Proposed Home Depot Store N/E/C East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Project No. 20035085 Laboratory Testing lleiracon All samples retrieved during the field exploration were returned to the laboratory for observation by the project geotechnical engineer and were classified in accordance with the Unified Soil Classification System described in Appendix B. Samples of bedrock were classified in accordance with the general notes for Bedrock Classification. At that time, the field descriptions were confirmed or modified as necessary and an applicable laboratory -testing program was formulated to determine engineering properties of the subsurface materials. Boring logs were prepared and are presented in Appendix A. Laboratory tests were conducted on selected soil and bedrock samples and are presented in Appendix B. The test results were used for the geotechnical engineering analyses, and the development of foundation and earthwork recommendations. All laboratory tests were performed in general accordance with the applicable ASTM, local or other accepted standards. Selected soil and bedrock samples were tested for the following engineering properties: • Water Content • Dry Density • Water Soluble Sulfates • Swell - Consolidation SITE CONDITIONS • Compressive Strength • Plasticity Index • Expansion • Grain -Size Distribution The area for the proposed development is currently a vacant building pad encompassed by South Lemay Avenue to the west, East Magnolia, Street to the north, 12t' Street to the east and East Mulberry Street to the south. Two retail buildings, Building I and Building J, and associated paved parking and drive areas are situated at the southwest portion of the site and a restaurant building, Building G, is situated at the northwest portion of the site. An existing detention pond is located at the southeast portion of the site. The site has been elevated approximately 4 to 7-feet with overlot grading procedures, is relatively flat and sparsely vegetated with grasses and weeds. North of the site is the existing Wal*Mart Supercenter. SUBURFACE CONDITIONS Soil Conditions Approximately 4-1/2 to 7-1/2 feet of sandy lean clay fill material was encountered at the surface of each test boring. Underlying the fill material and extending to the depths explored and/or the 3 Geotechnical Engineering Exploration Proposed Home Depot Store N/E/C East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Project No. 20035085 11•erracan for the Home Depot Store, given by Home Depot U.S.A., Inc., will be on the order of 5 kips per linear foot, 120 kips, and 650 pounds per square foot, respectively. Final grading plans were not provided prior to the subsurface exploration activities, however, it is anticipated the finished floor elevations of the retail buildings will be at or slightly above existing site grades. SITE EXPLORATION PROCEDURES The scope of the services performed for this project included a site reconnaissance by an engineering geologist, a subsurface exploration program, laboratory testing and engineering analyses. Field Exploration Forty-five test borings were drilled on June 17, 18 and 19, 2003, at the locations shown on the Boring Location Plan, Figure 1. Twenty-two test borings were located within the footprint of the proposed Home Depot building and drilled to approximate depths of 25-feet. Three test borings were located within the footprint of the proposed Building F and were drilled to approximate depths of 15-feet below existing site grades. Twenty test borings were located within the proposed parking and drive areas and were drilled to approximate depths of 10-feet below existing site grades. Test Boring Nos. 25 through 27, P11, P18 through P20 and P22 were not drilled due to .existing paved parking and/or drive areas and the presence of an existing detention basin in -place. The borings were advanced with a truck -mounted drilling rig, utilizing 4-inch diameter solid stem augers. The borings were located in the field with the aid of a hand-held GPS unit. Ground surface elevations at each boring location were obtained by measurements with an engineer's level from a temporary bench mark (TBM) as shown on the Boring Location Plan. The accuracy of boring locations and elevations should only be assumed to the level implied by the methods used. Lithologic logs of the borings were recorded by the engineering geologist during the drilling operations. At selected intervals, samples of the subsurface materials were taken by means of pushing -thin -walled Shelby -tubes and driving split -spoon and/or ring -barrel samplers. Penetration resistance measurements were obtained by driving the split -spoon into the subsurface materials with a 140-pound hammer falling 30 inches., The penetration resistance value is a useful index in estimating the consistency, relative density or hardness of the materials encountered. Groundwater conditions were evaluated in each boring at the time of site exploration and again on June 19, 2003. 2 GEOTECHNICAL ENGINEERING REPORT PROPOSED HOME DEPOT STORE SITE # NW0066 NORTHEAST OF MULBERRY STREET AND SOUTH LEMAY AVENUE FORT COLLINS, COLORADO TERRACON PROJECT NO. 20035085 JULY 14, 2003 INTRODUCTION This report contains the results of our geotechnical engineering exploration for the proposed Home Depot Store and associated paved parking and drive areas to be located northeast of East Mulberry Street and South Lemay Avenue in Fort Collins, Colorado. The site is located in the Southeast 1/4 of Section 12, Township 7 North, Range 69 West of the 6th Principal Meridian, Larimer County, Colorado. The purpose of these services is to provide information and geotechnical engineering recommendations relative to: • subsurface soil and bedrock conditions • groundwater conditions • foundation design and construction • seismic considerations • floor slab design and construction • lateral earth pressures • pavement design and construction • earthwork • drainage The recommendations contained in this report are based upon the results of field and laboratory testing, engineering analyses, and experience with similar soil conditions, structures and our understanding of the proposed project. PROJECT DESCRIPTION The project as we understand it is to construct a Home Depot Store with an approximate 102,000 square foot main store facility, an approximate 19,000 squarefoot garden center, an approximate 7,000 square foot seasonal sales facility and associated loading docks, pickup canopy and paved parking ad drive areas. Maximum anticipated wall, column and slab loads 1 TABLE OF CONTENTS Page No. Letterof Transmittal--------------------------------------------------------------------------------- -------i INTRODUCTION------------------------ —----------------------------- ------------------------------------------ 1 PROJECT DESCRIPTION ------------------------------- — ---------------------------------------------------- 1 SITE EXPLORATION PROCEDURES---------------------------------------------------------------------2 FieldExploration ------------------- ------------------------------------------------------------------------ 2 LaboratoryTesting --------------------------------------------------------------------------- ---------------- 3 SITECONDITIONS ----------- --------- ------------ —----------- ---------------------------- --------------- - ----- 3 SoilConditions ---------------------------- ---------------------------- -------- ------------------------------- 3 Field and Laboratory Test Results --------------------------------- =----------------------------------- 4 Groundwater Conditions -------------------------- —------------------ —------------------------- =-------- 4 ENGINEERING RECOMMENDATIONS-------------------------------------------------------------------4 Geotechnical Cons iderations ------ --------------------------------------------------------------------- 4 Foundation Systems — Conventional Type Spread Footings ---------------------------------- 5 Floor Slab Design and Construction ------------------------------------------------------------------ 7 Pavement Design and Construction ---- —--- ---------------------------------------------------------- 8 Lateral Earth Pressures ------------ -------------------------------------------------------------------- 11 SeismicConsiderations -------------------------- ------------------------------------------------------- 12 Earthwork------------------------------ -------- ------------------------------------------ --------------- = ---- 12 General Considerations------------------------------------------------------ ------------------------- --12 SitePreparation ------------------- — ------------------------------------------------------------------------ 12 Subgrade Preparation ----------- -------------- ---------------------------------------------------------- 13 Fill Materials and Placement --------------------------------------------------------------------------- 13 Excavation and Trench Construction ---------- ------------------- ---------------------------------- 14 Additional Design and Construction Considerations ------------------------------------------ 14 Exterior Slab Design and Construction -- — -------------------------------------------------------- 14 Underground Utility Systems ------ -------------------------------------------------------------------- 13 CorrosionProtection ---------------------------- ---------------------------------------------------------- 15 Surface Drainage ------------------------------------------------ — ---------------------------------------- 15 GENERALCOMMENTS-------------------------------------------------------------------------------------16 APPENDIX A Vicinity Map — Figure 1 Boring Location Plan — Figure 2 Bedrock Contour Map — Figure 3 Groundwater Contour Map — Figure 4 Logs of Borings APPENDIX B Laboratory Test Results APPENDIX C General Notes Pavement Notes Geotechnical Engineering Exploration lrerracon Proposed Home Depot Store N/E/C East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Project No. 20035085 bearing on native soils and/or engineered fill material. Slab -on -grade construction is considered feasible at the site provided the recommendations set forth in the report are followed. We appreciate the opportunity to be of service to you on this phase of your project. If you have any questions concerning this report, or if we may be of further service to you, please do not hesitate to contact us. Sincerely, TERRACON Daniel R. Lambert, P.E. Geotechnical Engineer Copies to: (4) Addressee (3) Galloway, Romero & Associates (3) Little & Associates David A. Richer, P.E. Geotechnical Engineer/Department Manager July 14, 2003 Home Depot U.S.A., Inc. 370 Corporate Drive North Tukwila, Washington 98188 Attn: Naomi Vincent Irerracon 301 N. Howes • P.O. Box 503 - Fort Collins, Colorado 80521-0503 (970)484-0359 Fax: (970) 484-0454 Re: Geotechnical Engineering Report Proposed Home Depot Store #NW0066 Northeast of East Mulberry Street and South Lemay Avenue Fort Collins, Colorado Terracon Project No. 20035085 Terracon has completed a geotechnical engineering exploration for the proposed Home Depot Store and associated paved parking and drive areas to be located northeast of East Mulberry Street and South Lemay Avenue in Fort Collins, Colorado. This study was performed in general accordance with our Proposal No. D2002352 dated April 25, 2003. Terracon performed a comprehensive geotechnical engineering exploration for the Wal"Mart Super Center Store, in April of 1999 and for the interior roadways in October of 2000. For further information and findings thereof, please refer to.our "Geotechnical Engineering Reports" dated July 20, 1999, Project No. 20995107 and October 26, 2000, Project No. 20005217. The results of our engineering study, including the boring location diagram, laboratory test results, test boring records, and the geotechnical recommendations needed to aid in the design and construction of foundations, pavements and other earth connected phases of this project are attached. Approximately 4-1/2 to 7-1/2 feet of sandy lean clay fill material was encountered at the surface of each test boring. Underlying the fill material and extending to the depths explored and/or the bedrock below was native sands and gravels. Siltstone/claystone was encountered in Test Boring Nos. 1 through 21 at approximate depths of 17 to 23-feet below existing site grades and extended to the depths explored, approximately 25-feet. Groundwater was encountered in various borings across the site at approximate depths of 6-1/2 to 10-feet below existing site grades when checked approximately 1 to 2 days after initial drilling operations. Based on the subsurface conditions encountered and the type of construction proposed, it is recommended the proposed structures be supported by conventional -type spread footings Arizona ■ Arkansas ■ Colorado ■ Idaho ■ Illinois ■ Iowa ■ Kansas ■ Minnesota ■ Missouri ■ Montana Nebraska ■ Nevada ■ New Mexico ■ North Dakota ■ Oklahoma ■ Tennessee ■ Texas ■ Utah ■ Wisconsin ■ Wyoming Quality Engineering Since 1965 GEOTECHNICAL ENGINEERING REPORT PROPOSED HOME DEPOT STORE SITE # NW0066 NORTHEAST OF MULBERRY STREET AND SOUTH LEMAY AVENUE FORT COLLINS, COLORADO TERRACON PROJECT NO. 20035085 JULY 14, 2003 �P O Prepared for. HOME DEPOT U.S.A., INC. 370 CORPORATE DRIVE NORTH TUKWILA, WASHINGTON ATTN: NAOMI VINCENT Prepared by. Terracon! 301 North Howes Street Fort Collins, Colorado 80521 Irerraco