HomeMy WebLinkAboutLIVING OAKS - PDP - PDP170009 - CORRESPONDENCE - (3)planted within 4' of water and sewer mains or service lines.
Please be sure to show all water, sanitary sewer, and storm sewer on the
landscape plans and review that separation requirements are being met (it
appears the proposed tree along Matthews does not meet this requirement
currently).
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX6.
Topic: Site Plan
Comment Number: 1
Comment Originated: 03/17/2017
04/17/2017: Some of the sheet titles in the sheet index do not match the sheet
titles on the noted sheets. See redlines.
03/17/2017: Some of the sheet titles in the sheet index do not match the sheet
titles on the noted sheets. See redlines.
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-68207 nhahn@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/14/2017
03/14/2017: Please revise driveway depth to better define parking and backing
movements.
Comment Number: 2 Comment Originated: 03/14/2017
03/14/2017: Please provide signing and striping plans including the additional
on street parking with the final submittal.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcqov.com
Topic: General
Comment Number: 1
Comment Originated: 03/07/2017
03/07/2017: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Department: Water -Wastewater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 4 Comment Originated: 03/14/2017
04/11/2017: Please see updated redlines (pdf).
03/14/2017: Please see redlines.
Comment Number: 5 Comment Originated: 04/11/2017
04/11/2017: For final plan submittal, please add a note to the Landscape Plan
regarding landscape separation requirements. No trees shall be planted with
10' of water and sewer mains or within 6' of service lines. No shrubs shall be
04/05/2017: The line work has improved, but the property line is still a little
difficult to discern. Please make this line a heavier weight and indicate the
corners of the property line with large dots.
03/10/2017: The line work makes it difficult to tell how far back the building is
set from the right-of-way. Please more clearly delineate the sidewalk, property
boundary, and building envelope on the site plan.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 3 Comment Originated: 03/14/2017
04/11/2017: Please see updated redlines (pdf).
03/14/2017: Please see redlined utility plans and drainage report (provided in
pdf format).
Comment Number: 4 Comment Originated: 04/11/2017
04/11/2017: It appears there is less than 1' of freeboard provided (currently
-0.8' is seen). Can you please provide T of freeboard at the driveway spill
east?
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1
Comment Originated: 03/06/2017
03/06/2017: No Comment from Erosion Control. Based upon the submitted
materials it has been determined that this site; disturbs less than 10,000 sq. ft.,
is not in a sensitive area, and is not in a larger development under construction.
Therefore, no submittal of erosion control material is needed at this time.
However, the site still must be swept and maintained to prevent dirt, saw
cuttings, concrete wash, trash & debris, landscape materials and other
pollutants from entering the storm sewer at all times or erosion and sediment
control measures will be required of the site. If you need; clarification concerning
the erosion control section, or if at any time the site does in fact disturb greater
than 10,000 sq. ft., or if there are any questions, please contact Jesse Schlam
970-218-2932 or email @ jschlam@fcgov.com
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 6
Comment Originated: 03/17/2017
04/17/2017: Please add the missing note.
03/17/2017: The City has moved to the NAVD88 vertical datum, and as of
January 1, 2015, all projects are required to be on NAVD88 datum. Please
provide the following information for the Benchmark Statement in the EXACT
format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
plan. Each residential unit will need to be individually metered. If you wish to
gang the meters on one side of the building please place on the opposite side
of the gas meters. The owner is responsible to provide and maintain the
electrical service from the transformer to the meter bank.
Comment Number: 6 Comment Originated: 03/15/2017
03/15/2017: Please contact Tyler Siegmund at Light & Power Engineering if
you have any questions at 970.416.2772. Please reference our policies,
construction practices, development charge processes, and use our fee
estimator at hftp://www.fcgov.com/utilities/business/builders-and-developers
Department: Outside Agencies
Contact: Clay Frickey, 970-224.6045, cfrickey@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/16/2017
03/16/2017: Comment from Comcast - Comcast needs a 5' utility easement on
the west side of the building and along the south side of the property. Current
Comcast facility is in the alley.
Department: PFA
Contact: Jim Lynxwiler, 970-416-28699 Ilynxwiler@poudre-fire.org
Topic: General
Comment Number: 7
Comment Originated: 04/11/2017
04/11 /2017: KEY BOX
A Knox Box is required to be mounted on the building in support of the R-13
sprinkler system. A key to the man -gate may be housed in the main Knox Box.
A separate Knox Box, as currently indicated on the Site Plan, is not necessary
at the gate. Knox Box location may be determined at time of building inspection.
Department: Planning Services
Contact: Clay Frickey, 970-224-60459 cfrickey@fcgov.com
Topic: General
Comment Number: 8 Comment Originated: 04/05/2017
04/05/2017: Your modification request to the parking standard does not include
the four parking spaces you are now providing on -site. This is important
information for the hearing officer to consider and should be included in your
modification request. Please revise the modification request to include the
on -site parking as part of the narrative.
Topic: Site Plan
Comment Number: 1
Comment Originated: 03/10/2017
04/05/2017: Thank you for providing a parking table. On -street parking spaces
should not be factored in to the parking serving the development since those
spaces are available to the general public. Please remove the on -street parking
spaces from the parking table.
03/10/2017: Clarify the amount of parking you will be providing in the parking
table. You should include the parking spaces you are proposing to provide
off -site in addition to the shared vehicle for the site.
Comment Number: 3 Comment Originated: 03/10/2017
the panels, the pattern of installation and the lack of mortar -replaced by
suspension on a frame. The overall effect of building style, material choice, and
construction methodology is thus indirectly referential and one of contrast and
differentiation, representing a modem addition to an area of adjacency that
ranges in age from the 1880s to the 1930s.
Comment Number: 5 Comment Originated: 03/14/2017
03/14/2017: "(4) Visual and pedestrian connections between the site and
neighborhood focal points, such as a park, school or church, shall be preserved
and enhanced, to the maximum extent feasible."
The general visual and pedestrian connections between the site and the park
and Carnegie Library building are not a current concern for historic preservation
staff.
Department: Light And Power
Contact: Tyler Siegmund, 970-416-2772, tsiegmund@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 03/15/2017
03/15/2017: Light and Power has electric facilities along the south side of Oak
St that can be utilized to provide power to the site. Modifications maybe
needed, Light and Power may have to intercept exiting primary lines and cut in
a vault along the Oak St frontage. Is 3phase or single phase power
anticipated?
Comment Number: 2
Comment Originated: 03/15/2017
03/15/2017: Electric capacity fees, development fees, building site charges
and any system modification charges necessary to feed the site will apply to this
development. Please contact me or visit the following website for an estimate
of charges and fees:
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investmen
t-development-fees
Comment Number: 3 Comment Originated: 03/15/2017
03/15/2017: A commercial service information form (C-1 form) and a one line
diagram for the commercial meter will need to be completed and submitted to
Light & Power Engineering. A link to the C-1 form is below:
http://www.fcgov.com/utilities/business/builders-and-developers/development-
forms-guidelines-regulations
Comment Number: 4
Comment Originated: 03/15/2017
03/15/2017: Transformer location will need to be coordinated with Light &
Power. Typically, transformers are placed on the property. Transformer must
be placed within 10 ft of a drivable surface for installation and maintenance
purposes. The transformer must also have a front clearance of 10 ft and
side/rear clearance of 3 ft minimum.
Comment Number: 5
Comment Originated: 03/15/2017
03/15/2017: Electric meter locations will need to be coordinated with Light and
Power Engineering. Please show meter location on the utility plan and site
the site."
The applicants have identified the following areas that address 3.4.7 fl(1). The
proposed setback pattern on the west side of Mathews Street between Oak
Street and Olive Street would reflect two corner anchors with zero lotlines that
frame the streetscape of the block with 16-feet setbacks in the middle, creating
a larger siteline pattern that would carry through to the north upon the
construction of the new MAVD building approved at 221 Mountain Avenue. The
height and width of the three-story building is generally consistent with the range
of buildings in the area of adjacency, which consist of one-story, two-story, and
three-story buildings that are from 38 feet to 83 feet wide. The applicant
suggests that the PV panels should be difficult to see from a pedestrian
viewpoint facing the building's fagade on Oak Street.
Generally speaking, the height, setback, and width of the proposed new building
seem to avoid negatively impacting the exterior integrity and significance of
individually designated and eligible buildings along Oak Street and Mathews
Street based on scale, in part because those buildings are not immediately
abutting the proposed new construction.
Comment Number: 3 Comment Originated: 03/14/2017
03/14/2017: "(2) New structures shall be designed to be in character with such
existing historic structures. Horizontal elements, such as cornices, windows,
moldings and sign bands, shall be aligned with those of such existing historic
structures to strengthen the visual ties among buildings. Window patterns of
such existing structures (size, height, number) shall be repeated in new
construction, and the pattern of the primary building entrance facing the street
shall be maintained to the maximum extent feasible."
Staff feels that the Old Town commercial building typology is not specifically
called for at this site because it lacks immediate proximity to similar buildings
and also does not reflect a predominant historic pattern in the area of
adjacency. The applicant has chosen the typology based on the logic that the
more immediate surroundings lack a clear pattern of character and typology, i.e.
the proposed historic area of adjacency is a varying mix of types and styles.
Additionally, the building would sit in a transition area between the Downtown
District and the Neighborhood Conservation - Medium Density (NCM) District,
so the applicant has an interesting design challenge regarding this section of
the code.
Comment Number: 4 Comment Originated: 03/14/2017
03/14/2017: "(3) The dominant building material of such existing historic
structures adjacent to or in the immediate vicinity of the proposed structure shall
be used as the primary material for new construction. Variety in materials can
be appropriate, but shall maintain the existing distribution of materials in the
same block."
Staff feels that the dominant building material choice of terracotta panels is a
sensitive modern construction material that would visually harmonize with the
existing, varying pattern of brick and stone masonry in the area of adjacency.
However, the panels will differ from the appearance of the traditional building
materials in the area based on the modular installation, the larger -format size of
Topic: General
Comment Number: 6
Comment Originated: 04/10/2017
04/10/2017: Thank you for requested updates to landscape and lighting plans
and for paying special attention to details including labeling street light
replacements as Night Sky Compliant LED and providing manufacture cut
sheets. By final plan please include a luminaire schedule (an example can be
provided) on Lighting Plan so that it is clear which specific Kelvin/CCT shall be
ordered for each fixture.
Department: Forestry
Contact: Molly Roche, mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 2
Continued:
4/13/17:
Comment Originated: 03/17/2017
It appears as though the text "Irrigate Turf — Low Water Usage" is cut off from the
plans. Please be sure this is clearly and accurately labeled on both the Mathews
and Oak Street parkways.
03/17/2017:
Show irrigated turf in the parkway on Mathews and Oak Street. Also, clearly
show the location of the sidewalk along Mathews and Oak as well as the
parkway.
Department: Historic Preservation
Contact: Maren Bzdek, 970-221-6206, mbzdek@fcqov.com
Topic: General
Comment Number: 1
Comment Originated: 03/14/2017
03/14/2017: Land Use Code (LUC) Section 3.4.7, Historic and Cultural
Resources contains the applicable standards for new buildings, where
designated or eligible historic landmarks or historic districts are part of the
development site or surrounding neighborhood context. At its March 15, 2017
preliminary review of the project, the Landmark Preservation Commission will
discuss the appropriate area of adjacency upon which compliance with this
section of the code will be based.
Comment Number: 2
Comment Originated: 03/14/2017
03/14/2017: LUC 3.4.7(F)(1) requires that "To the maximum extent feasible,
the height, setback and width of new structures shall be similar to: (a) those of
existing historic structures on any block face on which the new structure is
located and on any portion of a block face across a local or collector street from
the block face on which the new structure is located.... Notwithstanding the
foregoing, this requirement shall not apply if, in the judgment of the decision
maker, such historic structures would not be negatively impacted with respect to
their historic exterior integrity and significance by reason of the new structure
being constructed at a dissimilar height, setback and width. Where building
setbacks cannot be maintained, elements such as walls, columns, hedges or
other screens shall be used to define the edge of the site and maintain
alignment. Taller structures or portions of structures shall be located interior to
Fort Collins
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
tcgov. com/developmentre view
April 18, 2017
722 W MOUNTAIN AVE
Fort Collins, CO 805212506
RE: Living Oaks, PDP170009, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Clay Frickey, at 970-224-6045 or cfrickey@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa@fcqov.com
Topic: General
Comment Number: 3
Comment Originated: 04/12/2017
04/12/2017: Engineering is in the process of formalizing a response to the
variance requests to allow for a zero setback for the gate and a reduced
driveway width. To summarize, Engineering is okay with the reduced width of
the driveway and a zero setback of the gate with the conditions that every unit
within this project has a garage space. The Final Development Plan Documents
(Elevations, Site/Landscape Plans) should clearly depict the lower levels as
garages and should be labeled accordingly. The sliding doors should be
modified to show actual garage doors. A turning exhibit will also be needed to
show that the turning movements for each unit are feasible for a standard sized
vehicle. An exhibit with sight triangles may also be required.
In the case that this Development doesn't want garage doors or all units will not
have garage doors, Engineering would be in support of the option to remove the
driveway completely and keep the fence along the ROW. A pedestrian gate
could be added her in lieu of the proposed vehicular gate.
Department: Environmental Planning