HomeMy WebLinkAboutMULBERRY AND LEMAY CROSSINGS, 2ND FILING, PORTION OF LOT SIX, HOME DEPOT - PDP - 36-96J - SUBMITTAL DOCUMENTS - ROUND 1 - CORRESPONDENCE-CONCEPTUAL REVIEWconsidered by the Board. (So Noted, we have considered and made separate
application and withdrew the separate application in lieu of a combined application
which is attached)
32. Please note that the first curb cut north of Mulberry on Lemay is not full motion
but restricted to right-in/right-out only by the raised median. (So Noted, it is the intent of
this development that entrance into the sight would be through the full movement
intersection of Magnolia Street and /or 12`h street.)
33. A neighborhood information meeting is required as the site is adjacent to existing
development and the plan represents a change in relationship to the approved plan. The
Planning Department will create the notification map for the neighborhood meeting.(Per
our discussion with Ted Shepard we are actively seeking neighborhood meetings
with all surrounding neighborhoods. We believe we will be able to accomplish these
meetings within the first two weeks of December, 2003.)
We have attached copies of the plans for the above mentioned Major amendment, PDP and
Modification of Parking Standard. We have also included the applications and submittal fees for
the three different submittals. We have combined the Major Amendment and the Modification of
Parking Standard and $200 fee with the Major Amendment fee. We would like to be considered
for the following, for that portion of the site that lies within Mulberry/Lemay Crossings, Filing
Two, Lot Two, Final PUD as a Major Amendment with a Type Two review. And for that portion
of Mulberry/Lemay Crossings Filing two Lot Six we are asking for a review as a PDP. It is our
understanding that this review will take approximately 12 weeks and could be heard by the
Planning and Zoning Board in the month of February, 2004. If you need additional information or
I have not fulfilled the submittal requirement, please let me know as soon as possible. We would
be glad to furnish any missing items immediately.
Sincerely,
VX) W", �' �
Blair B Warehime
Site Development Coordinator
Page 7 of 7
and from the existing restaurant. (So Noted, This sidewalk has been added to our
design and is part of our submittal)
25. The Development Agreement and Development Construction Permit will be
needed. There is a fee associated with the Development Construction Permit. For further
information, please contact Sheri Wamhoff, 221-6605. (So Noted, we have not
contacted Ms Wamhoff but will do so during the Construction Document process.)
26. The Transportation Impact Study (T.I.S.) must also perform a Level of Service
analysis for alternative modes. For further information, please contact Tom Reiff, 224-
2040.
27. Bicycle parking must be provided in a safe and secure location. Be sure that there
is a clear continuous sidewalk system connecting the front entrance to the garden entrance
and the seasonal sales area. (So Noted, Bicycle parking has been anticipated and is
shown on the plan.)
28. Please note that Section 3.4.1(1) requires that elements of the site complement the
visual context of the Poudre River. Careful placement of Cottonwood trees and river
cobbles should be explored. For further information, please contact Doug Moore, 221-
6600. (So Noted, Mr. Moore will be contacted by our landscape architect during the
review process.)
29. A Fugitive Dust Permit will be needed from the Larimer County Health
Department during the construction phase. The trash collection system should include
facilities for recyclable materials. Outside the buffer areas, native plants and grasses are
encouraged over irrigated blue grass sod. For further information regarding these issues,
please contact Doug Moore, 221-6750. (Per the requirements of City a fugitive dust
permit is required for a development larger than 25 acres. The Home Depot
development will not exceed approximately 11.0 acres. It was our intent to follow
the City's regulation and requirements.)
30. One of the key issues is to meet the standard regarding multiple entrances. As we
have discussed, for this standard to be satisfied, the secondary entrance must be open
during normal business hours and 12 months out of the year. (We have addressed a
secondary access and have incorporated it within our submittal. We have modified
our building elevations to provide for this entrance off of Magnolia Street and can
be seen from the street.)
31. The Modification of Standard for the parking distribution standard may be taken
to the Planning and Zoning Board as a "stand-alone" prior to the full P.D.P. The fee is
$200 and a letter and supporting documentation may be submitted anytime. If granted, the
Modification is valid for one year. Prior to expiration of one year, the P.D.P. must be
Page 6 of 7
included with this submittal. Existing and proposed utilities have been
differentiated)
18. Utility Plans must include water and sewer design in both plan and profile.
(Under the revised requirements, water and sewer has been shown in plan view only
for review for the entitlement portion of this development. Plan and Profiles will be
submitted during the construction document phase of the approvals.)
19. Be sure to get the latest layout of the building envelopes and parking lot layout for
Buildings I and J. A Minor Amendment was approved in June of 2002 that revised the
original plan. (A new ALTA was completed for this site and revised building layouts
for Buildings I and J have been provided.)
20. If there are any encroachments by building envelopes into existing easements,
then those affected portions of the easement must be properly vacated. The vacation
procedure is by separate documents coordinated by the Engineering Department (Such
encroachments do exist for Building J. The boundary line for the Detention tract
overlaps the building. The developer through his consultant is modifying this
boundary by separate legal documents and has been coordinating with the
Engineering department.)
21. Check the turning radius by the contractor sales area (We have checked the area
by the contractor sales area and applied an articulated bus turning template. We
believe that this best represents the contractor truck and trailer that will frequent
this site. Regular truck traffic is not allowed by Home Depot across the front of the
store in the Front Drive Isle that is adjacent to the Store entrances.)
22. Please be aware that there is a platted sight distance easement along 12`h Street.
This area is restricted to low -growing shrubs or low screen walls. Be sure to coordinate
parking lot layout, landscaping and service yard screening so that there are no visible
encroachments within the sight distance easement. (So Noted, we have modified our
sight plan accordingly. We have moved the screen wall inside the sight line and have
modified the landscaping.)
23. The City charges a Street cut fee. The fee is tripled if the street is less than five
years old. For further information, please contact Rick Richter, 221-6605. (So noted, and
we believe that we will be impacted by this fee. We will need to relocate an existing
drive way off of Magnolia street and will have to remove up to two water service
stubs to within the existing streets. We have tried not to do any street cutting but it
is not possible at this time.)
24. Be sure to continue the east -west sidewalk all the way out to Lemay so that the
main entrance is connected to a public walk. This will also provide pedestrian access to
Page 5 of 7
it just isn't the same as extended detention. A variance to the requirement would need to
be requested and justified by the existing water quality treatment. Another option would
be to provide some water quality treatment within the new site. One suggestion would be
to depress some parking lot medians to provide extended detention. For further
information regarding the design of the stormwater system, please call Glen Schlueter,
221-6700. (
12. Although the site received a LOMR-Fill from FEMA the building will still have
to meet the 18-inch elevation requirement for the Poudre River. Since the building layout
will change from the approved LOMR-Fill, the design engineer will need to re -determine
the highest BFE (Base Flood Elevation) against the building to determine the elevation
requirement. Please contact Marsha Hilmes-Robinson for all the Floodplain requirements.
224-6036. (Per the FEMA map the Base Flood Elevation for this site is 4933 by
contour. Finished Floor for the building has been established at elevation 4935. This
is two feet above the BFE.)
13. The Street Oversizing Fee will apply, due at the time of building permit issuance.
The fee is based on square footage and land use. In addition, the City collects the Larimer
County Road Impact fee. Please note that these fees are adjusted annually based on the
Denver -Boulder consumer price index. For an estimate of these fees, please contact Matt
Baker, 221-6605. Information on the Street Oversizing Fee is available on the City's
website. (We have contacted Mr. Baker and have included the fees in our project fee
budget)
14. The existing Transportation Impact Study will have to be updated to reflect
current conditions. Please discuss the scope of this study with Eric Bracke, Traffic
Engineer, 221-6630. (Kathleen Krager of Bowers & Krager Inc. has contacted Mr.
Bracke and discussed with him the scope of the study required for this project. The
study amendment is attached to this submittal.)
15. The P.D.P. may require the dedication of new utility easements. This can be done
by separate legal instrument and coordinated by the Engineering Department. (It has
been determined several easements will need to be abandoned and rededicated to
the City and/or utility. It is our plan to do this by separate legal instruments and will
coordinate with engineering.)
16. There may be a repay due to the original developer of the abutting public streets.
(So Noted, and it will be worked out as part of our purchase agreement with the
developer.)
17. A new set of Utility Plans will be required. This will be more efficient than
amending the approved set on a sheet by sheet basis. Be sure the plans indicate very
clearly both existing and proposed utilities. (So Noted, The new plans have been
Page 4 of 7
Lighting plan has been included within the review package.)
6. The site will be served water by the East Larimer County Water District and
sanitary sewer by the Boxelder Sanitation District. There are four water stubs to the site,
two potential service lines and two potential fire lines. Unused stubs shall be abandoned at
the main. Normal tap fees will apply. In addition, there is a raw water requirement as well.
For further information, please contact Mike Schied, civil engineer, 493-2044.
(Coordination with the East Larimer County Water District will be part of the design
review process. Of the four water service stubs to the property only two will be
required. The two to be abandoned have been shown on the plan for abandonment. It
is so noted for the normal tap fees and the addition of the raw water requirement for
the district. We have included these into our project fees.)
7. As mentioned, the sanitary sewer will be provided by Boxelder. The contact
person is Ravi Srivastava, 498-0604. (So Noted.)
8. The site will be served by the Poudre Fire Authority. An automatic fire
extinguishing system must be provided. Addresses must be visible from the street on
which the buildings front. Internal fire lanes must be a minimum of 24 feet wide with
inside and outside turning radii of 25 and 50 feet. A fire hydrant must be located within
300 ft. of the building and capable of delivering a minimum of 1,500 gallons per minute
at 20 p.s.i. residual pressure. A Hazardous Material Impact Analysis must be provided.
For further information, please contact Ron Gonzales, 221-6570. (We have had our Fire
Consultant Contact Mr. Gonzales to fulfill this request and requirement.)
9. The site is located in the Poudre River drainage basin. There. are no development
fees in this basin at this time. The standard drainage and erosion control reports are
required and they must be prepared by a professional engineer registered in Colorado. The
size of this site requires a SW -AM analysis to design the drainage system. (So Noted, we
have attached this report and analysis to the plan submittal for the City's review. It
has been prepared by a professional engineer registered in Colorado.)
10. The overall Mulberry and Lemay Crossing drainage report addressed development
of this site so the drainage patterns and imperviousness should be verified. If there are
differences the drainage engineer will need to design improvements to address the
differences. The design engineer needs to be a registered Professional Engineer in
Colorado. (We have prepared a comprehensive drainage report that addresses the
drainage patterns of the site. We have included any differences and addressed their
resolution.)
11. Normally onsite extended detention is required to treat the runoff. That was not a
requirement at the time the original development was approved. However the design
engineers did address water quality with a wetland pond that does help with water quality,
Page 3 of 7
2. Please be aware that the allowable parking is based on a maximum of five spaces
per 1,000 square feet of gross leasable area. In addition, the parking lot is requiring that
no more than 50% of the parking shall be located between the front door and the primary
street. Also, the large parking lot must be divided into smaller sections by landscape areas
and each section shall not exceed 200 spaces. In addition, 10% of the interior of the
parking area shall be in landscaped areas and no more than 15 consecutive spaces are
allowed without a landscape island. (We are requesting a "Modification to the Parking
Standard as part of this development. We have addressed this issue in our planning
objectives letter that has been provided for your review. The large parking lot is
broken up into five separate sections with the smallest containing 30 spaces and the
largest containing 112 spaces. The interior of the parking area contains pedestrian
respites and shelter areas with landscaping that exceeds the City's requirement to a
total of 14.6%. Please see Planning Objectives for further explanation)
3. Please be aware that outside areas that are used on a temporary basis for the sale of
seasonal inventory only shall be defined by nonpermanent walls or fences. Such an
enclosure shall not inhibit fire access to the building or pedestrian and bicycle access to
the building entrance. If chain link fencing is used, it must be vinyl -clad or covered with a
mesh material. Any such enclosure shall be removed upon the conclusion of the seasonal
sale period. (All areas that will be used for seasonal sales and inventory are fenced
with nonpermanent fences. These include the area northeast of the Garden Center
and the Plaza Area North of the Garden Area. The fencing will be of structural
tubular steel with black powder coating.) Areas in the rear of the store will be
screened by 8 ft. masonry walls.
4. Three-phase electrical power can be extended to the site from 12th Street. The
location of the transformer must be coordinated with Light and Power. Transformers must
be within ten feet of hard surface for emergency change out and screened from public
streets. Normal development charges will apply. Any modification to the existing system
will be at the developer's expense. Street trees must be spaced 40-feet and ornamental
trees 15-feet from streetlights. For further information, please contact Janet McTague,
221-6700. (The transformer will be place within a utility enclosure at the rear of the
store. It will be screened with a masonry wall and a metal gate. Coordination with
Light and Power during the construction document phase will occur. Access to the
transformer will not be restricted and will be paved to the front of the transformer
enclosure. No trees will be within the allowed clear zones for streetlights. It is noted
that all modification to the existing system will be at Home Depot's expense.)
5. Interior parking lot lighting and security lighting will be private and must match
the lighting already used within the center. This means that light poles, pole color, pole
height, wall -mounted fixtures, lamps, wattage and decorative fixtures shall match Filing
One (Wal-Mart). A Lighting Plan will be part of the submittal for P.D.P. (So noted, the
Page 2 of 7
Galloway, Romero & Associates
Design Engineering Planning
5350 OTC Parkway
Greenwood Village, Colorado 80111
(303) 770-8884
(303) 770-3636 fax
E-mail: blair_warehime@graa.com
November 26, 2003
Mr. Ted Shepard
Chief Planner
281 North College Avenue
Fort Collins, CO 80522-0580
(970) 221-6750
RE: Major Amendment -Filing 2 Lot 2, a PPD -Filing 2 Portion Lot 6
and Modification of Standard for Parking Distribution
Dear Mr. Shepard,
I am writing to you in response to your conceptual review letter dated August 12, 2003. Per our
previous conversation we are also requesting a Major Amendment for that portion of the site that
lies within Mulberry/Lemay Crossings, Filing Two, Lot Two and a Project Development Plan for
that portion of the site within Mulberry/Lemay Crossings, Filing Two, Lot Six. This is per your
review and letter dated June 4, 2002. I am also requesting a Modification of Standard to the City
of Ft. Collins parking distribution standard. This is per the Conceptual Review of August 12,
2003 and your review letter dated June 4, 2002. Due to the store and its proposed layout we
believe that the current distribution standard of the city does not provide the correct distribution
for the required layout of our site. Distribution of parking on all sides of the building is possible
but not to the level required by the standard. We request that the maximum of 50% parking in the
front of the store be modified to allow for increased parking in the front field of our store.
We have attached a copy of City staffs comments by the Conceptual Review Team of August 11,
2003 with our reply to each applicable comment for your review:
1. The project is zoned C, Commercial. This zone permits the proposed use, subject
to review by the Planning and Zoning Board. (Noted)
Page 1 of 7