HomeMy WebLinkAboutMULBERRY & LEMAY CROSSINGS, APTS. (BUFFALO RUN) - FINAL PUD - 36-96C - CORRESPONDENCE - RESPONSE TO APPLICANTComn ity Planning and Environment: ervices
Current Planning
City of Fort Collins
October 20, 1997
W.O. Brisben Companies, Inc.
c/o Mr. Scott McFadden
4891 Independence Street, Suite 200
Wheatridge, CO 80233
RE: Mulberry Lemay Crossings P.U.D., Buffalo Run Apartments - Final, #36-96C
Dear Sirs:
On October 2,1997 the Planning and Zoning Board of the City of Fort Collins approved
the above mentioned project with the following condition:
1. Due to the potential or actual limitations on downstream stormwater runoff
capacity in existing County development, and the potential impact that such
limitations create for the on -site detention pond for this development, and
because verification of the actual runoff capacity of the downstream outfall
system is pending, the Utility Plans for this development have not been
completed. Therefore, this Final P.U.D. approval is conditioned upon the
requirement that Final Utility Plans must be prepared by the developer and
4 approved in writing by the Stormwater Utility and the Final Plat and P.U.D.
must be properly recorded in accordance with City requirements before layout
and density are vested for this development and/or construction site work can
commence.
If you have any questions, please call our office at 221-6750.
Sincerely,
T
Ted Shepard
City Planner
TS/gjd
281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020