Loading...
HomeMy WebLinkAboutHARVEST PARK - PDP - 25-98A - CORRESPONDENCE - TRANSPORTATION ISSUEFERon Fuchs - Harvest Park Street Connec"ty Page 1 j From: Marc Virata To: ron fuchs Date: 7/23/99 10:59AM Subject: Harvest Park Street Connectivity Ron, At yesterday's Transportation Coordination Meeting I brought up the additional street connections that you had informally mentioned would be required of the development through your discussions with Terrence. It was viewed at the meeting that these connections are not necessary from a transportation standpoint and that vehicular circulation is not being degraded by not requiring these additional connections. From an Engineering standpoint, it appears we are taking on the responsibility of addtional maintenance of roads that are not needed for vehicular circulation. In addition, if the additional connections are made, additional engineering concerns may arise that will need internal discussion. I understand that these connections are being required from a Current Planning standpoint. I think it would be in everyone's best interests if all the street connections you are requiring be brought up at Wednesday's Development Review meeting. If the connections have to be made, the consequences should be discussed with the entire development review staff, as the staff made their initial comments based on the original development proposal. We run the risk of having the developer and engineer believe that the changes are okay with everyone in the City and continue on this belief, preparing utiltiy plans and potential major redesign work, only to find out that the new street connectivity raises unforseen issues with other departments. I will be out of the office Monday and Tuesday (7/26-7/27). Again, hopefully these issues can be brought up Wednesday with everyone on the Development Review Team. Thanks, Marc P. Virata Development Review Engineer City of Fort Collins (970) 221-6605 x7188 mvirata@ci.fort-collins.co.us CC: Bob Blanchard, Dave Stringer