HomeMy WebLinkAboutHARVEST PARK - PDP - 25-98A - CORRESPONDENCE -10)Please note Advance Planning and Transportation Planning comments
pertaining to the trails system adjacent to the McClelland Drainage Channel.
The trail system will need to be facilitated with the Sage Creek PDP that is under
review at this time. Coordinate all sidewalk/trail systems through out the
development with Transportation Planning Services.
11)The applicant/developer shall coordinate all emergency and utility infrastructure
needs to ensure that all infrastructure provisions are fully met.
Additional comments and the required number of revised plans may be forthcoming as the
various departments and reviewing agencies continue to review this request.
Please provide a written response to each of the above comments with the submittal of
plan revisions. In addition, a revised site development plan drawn to scale which is clearly
dated and labeled shall be submitted to address the above.
The burden of demonstrating compliance with all Land Use Code criteria is with the
applicant. Please contact me at 970.221.6750 and/or e-mail: rfuchs(cDci.fort-collins.co.us if
.you should have any questions or concerns related to these comments...
S i ni�yz.��e;�/i
Ronald G. Fuchs
City Planner
cc: Terence Hoaglund
Marc Virata
Kim Kreimeyer
Transportation Planning
Stormwater
Poudre Fire Authority
Zoning Department
Current Planning File #25-98A
CAMy Documents\Planning Document\Harvest Park #25-98A LUC\Harvest Park second filing comments.doc
N
I
G. Public Service: submitted a response to the checklist and it is attached to this
report.
H. Natural Resources: submitted a checklist that identified their requirements. Their
response is attached to this report.
I. Park Planning: submitted a checklist that identified their requirements. Their
response is attached to this report.
J. Traffic Operations: submitted a response to the checklist and it is attached to this
report.
K. Engineering Department: submitted a checklist that identified their requirements.
Their response is attached to this report.
L. Stormwater: submitted a checklist that identified their requirements. Their response.
is attached to this report.
M. Transportation Planning: submitted a response to the checklist and it is attached
to this report.
N. Current Planning Department: provides the following:
1) Please clean the CAD layers on sheet 1 of 23.
2) Please turn off contour lines.
3) Please label the appropriate road designations, whether connector, collector, et
cetera.
4) Please label the appropriate scale(s) for each illustrative elevation on sheet 23
of 23.
5) Delineate County Road 9 right-of-way improvements and dedications on the
respective site plan.
6) Need to provide some additional screening on the south property line of Block 8
per Section 3.2.1(E) (4).
7) Show all fence locations and details.
8) LETA, Larimer Emergency Telephone Authority reviewed the proposed street
names of Harvest Park PDP. Their comments are attached and need to be
addressed.
9) Please return all redlined documents with plan revisions.
2
r
Commu y Planning and Environmental -vices
Current Planning
City of Fort Collins
November 3, 1999
Mr. Dino DiTullio
Everitt Companies
3030 South College
Fort Collins, CO 80525
RE: Harvest Park
Dear Mr. DiTullio:
This letter is in response to plans for Harvest Park Project Development Plan (City File
#25-98A) submitted on October 6, 1999. Please note that staff reviewed your plans and'
the Planning Division mailed a request for comments to several public agencies and
departments. This development proposal is subject to and shall comply with all
requirements set forth in the City's Land Use Code (LUC), specifically: Articles 2.
Administration (Development Review Procedures); Article 3. General Development
Standards; and, Article 4. [Zoning] Districts.
The City of Fort Collins Land Use -Code (LUC) requires that throughout all land use
proceedings, the burden to comply with all applicable standards rest with the applicant. .
Staff, after reviewing materials submitted by the applicant, finds that revisions/re-design to
the submitted plans dated 10.05.99 are warranted to meet the Land Use Code.
The following lists the agencies and departments that responded and the substance of
their comments:
A. LETA: submitted a response to the checklist and it is attached to this report.
B. Advance Planning: submitted a checklist that identified several requirements. The
checklist is attached to this report.
C. ATT Cable Services submitted a response to the checklist and it is attached to this
report.
D. Light and Power: submitted the response that identified several requirements.
E. Streets: submitted a response to the checklist and it is attached to this report.
F. Zoning .Department: submitted a checklist that identified their requirements. Their
response is attached to this report.
281 North College Avenue - P.O. Box 580 - Fort Collins, CO 80522-0580 - (970) 221-6750 - FAX (970) 416-2020