Loading...
HomeMy WebLinkAboutHARVEST PARK - PDP - 25-98A - CORRESPONDENCE - REVISIONS (4)4) The scale of the elevations on sheet 23 is approximately 1" = 8', but is not precise. 5) County Road 9 improvements will be delineated when those plans are finalized. 6) Additional screening south of Block 8 has been noted. 7) All fence locations have been noted and are detailed. 8) LETA comments are currently being worked out. I appreciate your time in reviewing these plans. If you have any further questions, please feel free to contact me. Z Hoaglund, AS Cc Darwin Horan, The Writer Corporation Dino DiTullio, The Everitt Companies Jim Allen -Morley, The Sear Brown Group Harvest Park Response to PDP comments #2 12/22/99 H. Natural Resources • A preliminary grass seed mix has been added to the plans. A final mix will be worked out with natural resources with the final planting design of the channel. • A detail of the bike/ped crossing of the channel and other information will be shown with the final engineering plans. • The trickle pans in the detention ponds have been eliminated. • The landscape note language has been added to the plans. 1. Park Planning and Development • We have met with the parks department and worked out several issues. • We will continue to work on timing of construction with the parks department. J. Traffic Operations • Utility plan issues will be addressed on the utility plans. • Parking space counts were delineated on the sheet 1 of the previous submittal. • Minor redlines have been corrected. • Per Marc Virata of engineering, none of the crosswalks have been eliminated. • The street names are being worked out with LETA. • Country Main has been changed to Old Mill Road. • Signs have not been proposed for the medians. • The patterned concrete for the traffic circles will not be colored. • The collector designation for County Fair Lane has been changed to a local designation. K. Engineering • The bicycle connection request under CR 9 has been eliminated. • The Roadway width for Harvest Park Lane has been modified. • Letters of intent have been forwarded for offsite easements. • Easements will be corrected with the final plat. • The inconsistencies with roadway and sidewalk widths have been corrected. L. Stormwater • The tree/ stormwater conflict has been resolved by relocating the stormline. • Other issues will be resolved with the utility plans. M. Transportation Planning • Corbett Drive walk widths have been corrected. • We do not see a need to add additional bike racks in this block. Most bikes will be kept within the private residences. • Bike parking has been added to Tract J. • The walk in question has been changed from 6' to 8'. This is getting to be a lot of concrete! • Harvest Park Lane cross sections have been corrected. N. Current Planning Department 1) The CAD layers on sheet one have been cleaned up. 2) Contour lines have been turned off. 3) Road designations have been corrected. Harvest Park Response to PDP comments 42 12/22/99 2 r �S Landscape ArcY>itecture Site Plaxn irig • (arapfiics 719 Pear Street - Fort Collins, CO 80521 - 970.472.912-5 - FAX 970.493.8634 December21, 1999 Ronald G. Fuchs, Project Planner Current Planning Division City of Fort Collins 281 N. College Avenue Fort Collins, CO 80524 Dear Ron, Attached are eight copies of the site plan and plat as requested for the January 5t' hearing. Revisions to Harvest Park Project Development Plans, revised in response to City staff and agency review comments dated November 3, 1999 are addressed as follows: A. LETA • We have worked out most of the street name changes. Some minor ones may occur with final compliance plans B. Advance Planning • We have extended the bike path west between Old Mill Road and the western property line. • This segment is the responsibility of Sage Creek. C. AT&T Cable Service • There are utility easements located on both sides of the private access drives within the single family areas. There are areas for the pedestals to be located. • The areas in questions will be designated as private access, utility and drainage easements on the final compliance plat. • The tracts that aren't specifically labeled are mini -parks. • The areas in questions will be designated as private access, utility and drainage easements on the final compliance plat. D. Light and Power • The street trees and lights have been coordinated. • The storm sewer and lights have been coordinated. • Meter and transformer locations will be provided prior to final design as part of the construction review process. • Utility coordination meetings will be considered as needed. E. Streets No comments at this time F. Zoning Department • The phasing has been designated on the submitted with final compliance plans. G. Public Service No comments at this time. landscape plans. A separate phasing sheet will be Harvest Park Response to PDP comments #2 12/22/99