HomeMy WebLinkAboutHARVEST PARK - PDP - 25-98A - SUBMITTAL DOCUMENTS - ROUND 4 - ALTERNATIVE COMPLIANCE REQUESTDec-27-99 12:03
rSection 16. t ection 3?_3(A) of the Land Use Code of the City of Forc „
P,&-eby amended to read as follows:
purpose It is the city's intent to encourage the use of both active
f^and passive solar energy systems for heating air and water in
6
e'
homes and businesses,as ion as nattiial
„ g . topogiaphy,soil or other
stibsti 6f e', conditions' or:'other: ;natiital .conditions -peculiar io .the
site;a --,preserved. While the use of solar energy systems is
optional, the right to solar access is protected. Solar collectors
require access to available sunshine during the entire year,
including between the hours of 9:00 am and 3:00 pm, MST, on
December 21, when the longest shadows occur. Additionally, a
goal of this Section is to casure that site plan elements do not
excessively shade adjacent properties, creating a significant
adverse impact upon adjacent property owners.Thus, standards
are set forth to evaluate the potential impact of shade caused by
buildings, structures and trees. __�d
Section 17. That ec on _ _ of the land Use Code of the City of Fort
Collins thkereby amended to read as follows: -
trNDesign Standards. The lighting plan shall t the followins
igt standards:
(1) to lighting that may confused with warning,
ency or traffic si is prohibited
(2) Backero ike parking lots shall be illuminated as
unobtrusive possible to meet the functional needs of
safe circ on of protecting people and property.
Foregr d spaces, as building entrances and plaza
sea ' areas, shall ur local livhtin9 that defines the
cc without glare_
(' Light sources shall be concealed shielded to -tile
` and
sltal] feature bares•.cur-off:c ability,so. to rrnnixr ze:-up_
oht. spill-Tig3 glare and unnecess diffusion on
adjacent property.
(4) The style of light standards and fixtures shall be consistent
with the style and character of architecture proposed on the
site. POlCS ^sh811 he anri nnri- (nr a n�hPi wrier �narP�l Yn
P_O1
Dec-27-99 17:26
P_O1
Dhision 3.1. Lh/lnilinn.+
Section 5.1.2. Solo
Solar ener v system shall mean a solar collector or other device or structural design
f =ore of a structure that relies upon sunshine as an energy source and is capable of
collecting, distributing and storing (if appropriate to the technology) the sun's radiant
energy for a beneficial use.
Solar -oriented lot shall mean:
0) a lot with a front lot line oriented to within thirty (30) degrees of a true
cast -west line. When the lot line abutting a street is curved, the "front lot
line" shall mean the chord or straight line connecting the ends of the
curve. For a flag lot, the "liont lot line" shall mean the lot line that is
most parallel to the closest street, excluding the "pole portion of the flag
lot"; or
(2) a lot which, when a straight line is drawn from a point midway between
the side lot lines at the required front yard setback to a point midway
between the side lot lines at the required rear yard setback, is oriented to
within thirty (30) degrees ol' true north along said line; or
(3) a corner lot with a south lot line oriented to within thirty (30) degrees of
a true cast -west line, which south lot line adjoins a public street or
permanently reserved open space, provided, however, that the adjacent
street right-of-way or open space has a minimum north -south dimension
of at least fifty (50) feet. For the purposes of this definition,
"permanently reserved open space" shall include, without limitation,
parks, cemeteries, golf courses and other Similar outdoor recreation areas,
drainage ditches and ponds, irrigation ditches and reservoirs, lakes,
ponds, wetlands, open spaces reserved on plats for neighborhood use and
other like and similar permanent open %pace_
Special habitat features shall mean specially valued and sensitive habitat features
including key raptor habitat features, such as nestt sites, night. roosts and key feeding
areas as identified by the Colorado Division of Wildlife or in the Fort Collins Natural
Areas Policy Plan (NAPP); key production areas, wintering areas and migratory feeding
areas for waterfowl; key use areas for wading birds and shorebirds; heron rookeries; key
use areas for migrant songbirds; key nesting arras for grassland birds; Ibx and coyote
dens: mule deer winter concentration areas as identified by the Colorado Division of
Wildlife or NAPP; prairie dog colonies over filly (50) acres in sire as included on the
Natural Areas Inventory Map, key areas for rare, migrant or resident butterflies as
identified in the NAPP; areas of high terrestrial or aquatic insect diversity as identified
in the NAPP; remnant native prairie habitat; mixed foothill shrubland; foothills
ponderosa pine forest; plains cottonwood riparian woodlands; and any wetland greater
than one-fourth (Y<) acre in size.
Art ele.l. Pgget 38
Stipp. 2
reoriented to achieve solar compliance. Some additional lots could be altered to provide solar
compliance, but we feel this would not enhance the overall design of the conunuuity. The lots in
particular are lots 8, 9, 10, 11, 25, & 26 of block seven, and lots 1, 2, 16, & 19 of block nine. Currently
eight of these lots face two of the parks scattered throughout the community. Reorienting these lots to
meet solar compliance would face them onto a collector, and would not enhance the overall community
character.
In addition, most of the homes have been designed with the major living spaces on one side of the
home, surrounding a mini -courtyard, On the east -west oriented lots, most of these homes would be
positioned to have the major living areas facing south, providing some passive solar gain. On the north -
south oriented ►ots, the majority of these living areas are oriented to the west.
While this project does not meet solar compliance for the required units, if the project is taken as a
whole, the single family attached units are functionary the saute as the duplex units. If these units were
counted, this project would have 307 out of 470 units, or 65.3% of the units meeting solar compliance_
3. Section 3.2.l (D)(2xa) Landscape Standards —Street Trees
This section calls for street trees to be placed in the center of parkway strips at 3040' intervals. While
this plan meets the spacing requirements, we have proposed some parkway strips to be 15 feet wide in
lieu of the standard six feet This occurs on portions of Rock Creek Drive, and Country Main. These
rwo streets provide important connections between destinations. With the larger tree lawns, homes are
set back further from the street, and pedestrians are further separated from the street, enhancing the
pedestrian experience. Within these widened parkway strips, we have proposed staggering the trees
slightly, tauter than centering them within the parkway strip. This allows the trees to be spaced slightly
closer together, providing additional trees. This also plays with depth perception Malang the homes
appear to be set back further, and the pedestrian separated from the street even more than they already
are, without sacrificing safety or other related concerns.
The proposed plantings meet or exceed the intent of the code,
Harvest Park
Alternative Compliance Requests 10/5i99
_ . ]C.�-anclsespe .Arehiceeture Sites �.�*,T,. � - G,t�p�es
719 Pear Siu4a-o : - Fort C�lljxv-% CO 80S21 • 97O.47291?S - F.A7< 97O.493.gd3
Alternative Compliance Requests
1. Section 3.6.3 (A-F) Street Pattern and Connectivity Standards
Section F calls for sweet connections to surrounding neighborhoods to be made at intervals not to
exceed 660 feet. This is not entirely possible at Harvest Park due to existing development and natural
features. Specific areas are where alternative compliance is requested include:
North The north boundary of Harvest Park abuts Wildwood Third Filing, an existing single
family development, and the future Harmony Park, a City of Fort Collins Neighborhood
Park. When this area was originally planned and approved, only one street connection
was provided to Harvest Park which is Corbett Drive, a collector street which has been
continued in Harvest Park. Along the future neighborhood park, we are providing a street
that fronts on the park, providing convenient access for the community to the park.
West The west boundary of Harvest Paris abuts Stetson Creek Third Filing, also a single family
development. This area was also originally planned with only one street connection to
Harvest Park, Rock Creek Drive, a collector, which is being continued in liarvest Park.
The existing development precludes any additional street or pedestrian connections.
South The southern boundary of Harvest Park is the McClleland Drainage channel, immediately
south of which is the proposed Sage Creek Development. The overall distance would
require up to four street connections across the channel between the projects. Since this
drainage area will be rebuilt and enhanced into a natural area, City staff and both project
developers have agreed that two full street connections, and two additional pedestrian
connections would be more appropriate in this locale. The combination of the street and
pedestrian connections do allow full multi -modal connectivity between Elie developments,
as well as to minimize impacts to the natural area -
Even with these restrictions, Harvest Park does promote connectivity by providing direct connections
to the adjacent neighborhoods, these connections provide traffic distribution to four arterials within the
square mile. We have also planted for, or are making, several connections to County Road 9, a mirror
arterial to the east, as required by code.
2. Section 3.2.3 (A-D) Solar Access, Orientation, Shading
Section B calls fur at least 65% of the lots less than 15,000 sq. ft in area in single and two family
residential areas to must conform to the definition of a solar -oriented lot. At Harvest Park, all the lots
are less than 15,000 sq, it. with a mix of single family detached, duplex, and single family attached
wets. Of the 470 units on the site plan, 391 are required to meet solar compliance. 246 units, or 62.9%
of the units meet compliance, with eight additional units required to meet compliance.
When originally submitted, this project had 481 units with 239 out of 365 units, 65.5010, of the units
being in compliance. As comments were made, and the plans revised, solar compliance was eroded.
Many of the single family attached units were changed to duplex units at the request of Poudre Fire
Authority to meet current policies of that agency. These units had an east west orientation, which
further eroded solar compliance. In an effort to achieve solar compliance, as many lots as possible were
Harvest Park
Alternative Compliance Requests 10/5/99
am,
I�ui4C32Scape Atctutecttzra � Site Fl2Lx3xXi 1 .• 4(:33rz%p1Xi4Cs
77:9 V'I aK Stet Fore CvIIi=�, Gb SW21 • 970.A72.9225 - F-AX 970-a93.8634
FAX TRANSMITTAL
Date: December 271999
To: Ron Fuchs
Fort Collins Current planning
281 North College Avenue
Fort Collins, CO 80524
CC:
Job No: 80535
Project: Harvest Park
Fax No: 320-254-3341
Pages (Inchwk g This Page): 3.
If you do not receive all of the pages, please call (970) 472-9125.
Icon
Attached is copy of the alternative compliance requests you asked for.
Thanks,
Terence C. Hoaglund, ASLA