Loading...
HomeMy WebLinkAboutHARVEST PARK - PDP - 25-98A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEET (3)Project: fig, .L sT Planner: ��ti / , cTraffic Operations: Engineer: 41' xzc Date: Items Requested Redlined Items Being Returned Site land I Plat Utility I Drainage Rpt Other Items Required Site land I Plat Utility I Drainage Rpt Other Items Being Returned Engineering n- I X x Stormwater k X k" Water/Wastewate Traffic Operations X �, Trans. Planning �( X Transfort Natural Resources x Park Planning b A%F #6 x, Totals - -Z Other: Note: All redlined items should be returned with the resubmittal/ revisions. Revisions Routin' i / WE / FILE: PROJECT PLANNER ENGINEERING: PAVEMENT No IN • �.®....�--.-- BUILDING INSPECTION MAPPING / DRAFTING • , ..---...--REA/DOE/PRPA .-- ADVANCE PLANNING R.O.W. PLANNING WATER CONSERVATION POST OFFICE PUBLIC SERVICE STATE HIGHWAY DEPARTMENT DITCH COMPANY RAILROAD: UP or BN/CS ON mom ON l m�---o----- .....-ON mom_ Imp mmos�smmmmmmm NO mmmmmm iiimmmmmm �■���iiiiiiiiIN rin Mmmmmmommmm