HomeMy WebLinkAboutHARVEST PARK - PDP - 25-98A - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEET (3)Project: fig, .L sT
Planner: ��ti / , cTraffic Operations:
Engineer: 41' xzc
Date:
Items Requested
Redlined Items Being Returned
Site land I Plat Utility I Drainage Rpt Other Items Required
Site land I Plat Utility I Drainage Rpt Other Items Being Returned
Engineering n- I X
x
Stormwater k X
k"
Water/Wastewate
Traffic Operations
X
�,
Trans. Planning
�(
X
Transfort
Natural Resources
x
Park Planning
b A%F #6
x,
Totals
-
-Z
Other:
Note: All redlined items should be returned with the resubmittal/ revisions.
Revisions Routin' i /
WE /
FILE: PROJECT PLANNER
ENGINEERING: PAVEMENT
No
IN
•
�.®....�--.--
BUILDING INSPECTION
MAPPING / DRAFTING
• ,
..---...--REA/DOE/PRPA
.--
ADVANCE PLANNING
R.O.W. PLANNING
WATER CONSERVATION
POST OFFICE
PUBLIC SERVICE
STATE HIGHWAY DEPARTMENT
DITCH COMPANY
RAILROAD: UP or BN/CS
ON
mom
ON
l
m�---o-----
.....-ON
mom_
Imp
mmos�smmmmmmm
NO
mmmmmm
iiimmmmmm
�■���iiiiiiiiIN
rin
Mmmmmmommmm