HomeMy WebLinkAboutMULBERRY & LEMAY CROSSINGS, APTS. (BUFFALO RUN) - PRELIMINARY PUD - 36-96A - SUBMITTAL DOCUMENTS - ROUND 2 - TRAFFIC STUDYHCS: Unsiqnalized Intersections Release 2.1d-
_ _
Paae 1
Center For Microcomputers in Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (904) 392-0376
-----------------------------------------------------------------------
-------------------- Streets: (N-S) (N-S) 12th (E-W)
linco)n
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst. ................. . mid
Date of Analysis.......... 5/22/97
Other Information ......_..am pn short range
Iwo -way Stop -controlled Intersection
Eastbound I Westbound Northbound
Southbound
L T R L T R L T
R ;
----I----
L T R
---- ----
!---- --- ----!---- ---- ----I---- ----
No. Lanes 0 1 < 0 ; 0 > 1 0 1 0
1
0 0 0
Stop/Yield ; N; N;
Volumes 175 151 5 505 10
5
PHF .9 .9; .9 .9 .9
.9!
Grade 0 0 0
MC's (%)
SO/RV's (%)
CV's (%)
PCE's ;1.10 :1.10
----------- -----------------------=----------------------------------
1.10:
Adjustment Factors
Vehicle Critical
Follow-up
Maneuver Gap (tg)
Time (tf)
__________________________________________________________________
Left Turn Major Road 5.00
2.10
Right Turn Minor Road 5.50
2.60
Throuqh Traffic Minor Road 6.00
3.30
Left Turn Minor- Road 6.50
3.40
HCS: Unsiqnalized Intersections Release 2.1d
Worksheet for TWSC Intersection
--------------------------------------------------------
Step 1: RT from Minor Street NB SB
Conflicting Flows: (vph) 202
Potential Capacity: (pcph) 1094
Movement Capacity: (pcph) 1094
Grob. of Queue -Free State: 0.99
-------------------------------------------
Step 2: LT from Major Street Wb
Conflicting Flows: (vph)
211
Potential Capacity: (pcph)
1360
Movement Capacity: (pcph)
1360
Prob_ of Queue -Free State:
0.99
TH Saturation Flow Rate: (pcphpl)
1700
RT Saturation Flow Rate: (pcphpl)
Major LT Shared Lane Prob.
of Queue -Free State:
0.99
-------------------------------------------
Step 4: LT from Minor Street
NB
-------------------------------------------
Conflicting Flows: (vph)
770
Potential Capacity: (pcph)
379
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance Factor:
0.99
Capacity Adjustment Factor
due to Impeding Movements
0.99
Movement Capacity: (pcph)
-------------------------------------------
376
Intersection Performance Summary
EB
Avg. 95%
Flow Move Shared Total Queue Approach
Rate Cap Cap Delay Length LOS Delay
Movement (pcph) (pcph) (pcph)(sec/veh) (veh) (sec/veh)
________ ______ ______ ______ _______ _______ _____ _________
NB L 12 376 9.9 0.0 B
7.7
NB R 7 1094
3.3 0.0 A
WB L 7 1360 2.7 0.0 A
Intersection Delay =
0.2 sec/veh
0.0
Page 2
HCS: Unsianalized Intersections Release 2.1d Paae 1
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville. FL 32611-2083
Ph: (904) 392-0376
------------------- -----------
Streets: (N-S) 12th (E-W) lincoln
Major- Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... mid
Date of Analysis.......... 5/22/97
Other Information........ am Pm short range
Two-way Stop -controlled In errection
Eastbound Westbound Northbound Southbound
L T R L T R L T R. L T R
No. Lanes 0 1 < 0 0 > 1 0 1 0 1 0 0 0
Stop/Yield N; N
Volumes 410 51 5 165 20 5
PHF .9 .9; .9 .9 .9 .9
Grade 0 0 0
MC's (%) I
SU/RV's (%) ; ;
CV's (%)
PCE's ;1. 10 :1.10 1.10;
----------------------------------------
Adjustment Factors
Vehicle
Critical
Follow-up
Maneuver
Ciao (tq)
--------------------
Time (tf)
---------------------------
Left Turn Major
----------------
Road
5.00
2.10
Riaht Turn Minor
Road
5.50
2.60
Throuqh Traffic
Minor Road
6.00
3.30
Left Turn Minor
Road
6.50
3.40
HCS: Unsiqnalized Intersections Release 2.1d Page 2
Worksheet for TWSC Intersection
-------------------------------------------
Step 1: RT from Minor Street NB
Conflicting Flows:
(vph)
459
Potential Capacity:
(pcph)
811
Movement Capacity:
(pcph)
811
Prob. of Queue -Free
State:
0.99
------
Step-2: LT from Major
Street -------------
WB
_________________________________________________
Conflicting Flows:
(vph)
462
Potential Capacity:
(pcph)
1033
Movement Capacity:
(pcph)
1033
Prob. of Queue -Free
State:
0.99
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prob.
of Queue -Free State:
0.99
-------------------------------------------------
Step 4: LT from Minor
Street
NB
------
----------------------------
Conflicting Flows:
(vph)
648
Potential Capacity:
(pcph)
446
Major LT, Minor TH
Impedance Factor:
0.99
Adjusted Impedance
Factor:
0.99
Capacity Adjustment
Factor
due to impeding Movements
0.99
Movement Capacity:
_________________________________________________
(pcph)
443
SB
-EB
SB
Intersection Performance Summary
AVq.
95%
Flow
Move Shared Total
Queue
Approach
Rate
Cap Cap Delay
Length LOS
Delay
Movement
(pcph)
(pcohl (pcph)(sec/veh)
(veh)
-----
(sec/veh)
---------
-------
NB L
------
24
----- ------ -------
443 8.6
-------
0.0 B
7.8
NB R
7
811 4.5
0.0 A
WS L
7
1033 3.5
0.0 A
0.i
Intersection Delay =
0.3 sec/veh
HCS: Unsionalized intersections Release 2.1d Page
Center For Microcomputers In Transportation
University of Florida
512 Weil Hall
Gainesville, FL 32611-2083
Ph: (9041 392-0378
Streets: (N-S) access (E-W) lincoln
Major Street Direction.... EW
Length of Time Analyzed... 60 (min)
Analyst ................... mid
Date of Analysis.......... 5/22/97
Other Information ......... am pm short range
Two-way Stop -controlled Intersection
Eastbound Westbound I Northbound Southbound
L T R L T R ; L T R L T R
�---- ---- --- ---- ---- -----__- ____--_-___- __-_ ----
No. Lanes 0 1 < 0 0 > 1 0 ; 0 > 0 < 0 0 0 0
Stop/Yield N; N;
Volumes 185 30: 5 510 1 20 5;
PHF .9 .9; .9 .9 .9 .9;
Grade 0 0 0 ;
MC's (%)
SU/RV's (%);
CV's (%)
PCE's 11.10 ;1.10 1.10;
-----------------------------------------------------------------------
Adjustment Factors
Vehicle Critical Follow-up
Maneuver Gap (tg) Time (tf)
------------------------------------------------------------------
Left Turn Major Road 5.00 2.10
Right Turn Minor Road 5.50 2.60
Through Traffic Minor Road 6.00 3.30
Left Turn Minor Road 6.50 3.40
HCS: Unsionalized Intersections Release 2.1d
Worksheet for TWSC Intersection
-------------------------------------------
Step 1: RT from Minor- Street NB
Conflicting Flows:
(vph)
222
Potential Capacity:
(pcph)
1069
Movement Capacity:
(pcph)
1069
Prob. of Oueue-Free
State:
0.99
----------------------------------------------------
Step 2: LT from Major
Street
WR
----------------------------------------------------
Conflicting Flows:
(vph)
239
Potential Capacity:
(pcph)
1319
Movement Capacity:
(pcph)
1319
Prop. of Oueue-Free
State:
0.99
TH Saturation Flow
Rate: (pcphpl)
1700
RT Saturation Flow
Rate: (pcphpl)
Major LT Shared Lane
Prop.
of Queue -Free State:
0-99
----------------------------------------------------
Step 4: LT from Minor
Street
N8
----------------------------------------------------
Conflicting Flows:
(vph)
796
Potential Capacity:
(pcph)
366
Major LT, Minor TH
Impedance Factor:
0.99
Aajusted impedance
Factor:
0.99
Capacity Adjustment
Factor
due to Imoedina Movements
0.99
Movement Capacity:
____________________________________________________
(pcph)
363
Intersection Performance Summary
Avc.
95%
Flow
Move Shared Total
Queue
Rate
Cap Cap Delay
Length LOS
Movement (pcph)
(pcph) (pCDh)(seC/veh) (veh)
-------- ------
Na. L 24
------ ------ -------
363 >
------- ----
427 9_1
0.1 6
N0 R
1069 >
1319 2.7
J.0 4
intersection belay = 0.3 sec/veh
Se
Approach
Deiav
(sec/veh)
9.1
0.0
F
HCS: Unsionalized Intersections Release 2_.1d
Faroe 2
HCS: Unsipnalized intersections Release 2.1d
-----------------------------------------------------------------------
Page1
Center- For Microcomputers In Transportation
Worksheet for TWSC Intersection
University of Florida
________________________________________________________
512 Weil Hall
Step 1: RT from Minor Street
NB
SF
Gainesville, FL 32611-2083
--------------------------------------------
Ph: (904) 392-0378
Conflicting Flows: (vph)
462
Streets: (N-S) access (E-W) Lincoln
Potential Capacity: (pcph)
808
808
Major- Street Direction.... EW
Movement Capacity: (pcph)
0.99
Length of Time Analyzed... 60 (min)
Prob. of Oueue-Free State:
Analyst.........mid
________________________________________________________
Step 2: LT from Major Street
WB
Ee
Date of Analysis.......... 5/22/97
Other Information........ am pm short range
Conflicting Flows: (vph)
467
Two-way Stop -controlled Isection
-
Potential Capacity: (pcph)
1027
Eastbound I Westbound Northbound
I Southbound
Movement Capacity: (pcph)
1027
- k T R L - R
Prob- of Queue -Free State:
0.99
L i L
L__ _T__
TH Saturation Flow Rate: (PcPhPI)
1700
0 1< 0 0> t 0 0> 0 < 0
0 0 0
RT Saturation Flow Rate: (pcphpl)
No. Lanes
Stop/Yield N; N;
Major LT Shared Lane Prob.
Volumes 410 10; 5 180 30
5;
of Queue -Free State:
—
0.99
—
PHF .9 .9� .9 .9 .9
.9i
------------------------------------
-----------——
Step 4: LT from Minor- Street
N8
SR
Grade 0 0 0
Grace
i
MC's (%)
Conflicting Flows: (vph)
668
SU/RV's (%)I
Potential Capacity: (pcph)
435
CV's (%)
PCE's ;1.10 :1.10 1.10;
Major LT, Minor TH
impedance Factor:
0.99
Adjusted impedance Factor:
::-94
Capacity Adjustment Factor
due to Impeding Movements
0-99
Adjustment Factors
Movement Capacity: (pcph)
------------------------------------------------------
432
VehicTe Critical
Maneuver Gap (tg)
Follow-up
Time (tf)
intersection Per_formance Summary
------------------------------------------------------------------
Left Turn Ma for Road 5.00
5.50
2.10
2.60
" " -
Flow Move Shared Total
95%
Queue
Approach
Right Turn Minor Road
6.00
3.30
Rate Cap Ca: Delay
Length LOS
Delay
Throuon Traffic Minor Road
Turn Road 6.50
3-40
Movement (ocph) (Pcph) (pcpn)(s=_c%ver)
(ven)
1seclvehi
Left Minor
________ ______ ______ ______ _______
_______ _____
---------
NE. L 36 432 >
467
0.2 -
8.5
Nc R1 608 >
WE L 7 1027 :-`.
0.C. -
0.1
intersection Delay =
0-5 sec!veh
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2"4d 05-22-1997
Center For Microcomputers in Transportation
-------------------------------------------- --------------------
Streets: (E-W) lincoln (N-S) lemav
Analyst: Matt File Name:
Area iype: Other 5-22-97 am Pm
Comment: short range
_______________________ --------- --
Eastbound Westbound Northbound Southbound
: L T R : L T R : L T R L T R
---- --- ----'---- ---- - -- ---- ----
,
No. Lanes 1 1 1 < 1 1 1 1 1 1 : 1 1 <
Volumes 25 180 451 40 125 55! 35 3220 70! 170 565 75
PHF or PK15 ',0.90 0.90 0-9010.90 0.90 0.90;0.90 0.90 0.9010.90 0.90 0.90
Lane W (ft)112.0 12.0 ;12_.0 12.0 12.0;12.0 12.0 12.0!12.0 12.0
Grade 0 0 i 0 0
% Heavy Veh; 1 2 1! 1 2 i; 1 1 1; 1 1 1
Parking ;(Y/N) N ;(Y/N) N ;(Y/N) N 1(Y/N) N
Bus Stops 0; 0: 0! 0
Con. Peas 0! 0; 0; 0
Fed Button !(YIN) Y 14.5 s;(Y/N) Y 11.5 s;(Y/N) Y 14"5 s;(Y/N) Y 11.5
Arr Type i 3 3 3 3 31 3 3 i; 5 3
RTOR Vols ; 0; 0; 0! 0
Lost Time !3.00 S.00 3.00!3.00 3.00 3.00!3.00 3.00 3.00!300 3.00 3.00
Prop. Share:
Prop. Prot.; !
_______________________________________________________________________
Signal Operations
Phase Combination 1 2 c - 5 6 b
EB Left !NB Left
Thru Thru '
Right Right
Peds Peds
WB Left * !SB Left
Thru Thru
Right Right
Peds Peds
NB Right !E6 Right
55 Right !WB Right
Green ;Green 30.0P
Yellow/AR ellowiAR
Cycle Length: 6 se_s chase comcination order: its #51
_______________________________________________________________________
.-•ter=ection =_rformance Summary
Lane Grouc: Aci Sat vic q/C Approach:
Mvmts i,a: F�ow Ratic• Ratio Delay LOS relay LOS
_____ ____ _______ _____ _____ _____ ___ _____ ---
EB L 1242 0.O61 0.367 9.4 S 1r,.61 B
TR 64s 1E07 0"377 0.567 10.E b
wa L 307 b38 0. 143 0.367 9.7 E• 9.8 B
T 683 1863 0203 0.3b7 9.9 B
R 586 1599 0"104 0.367 9.5 E.
NB L 125 235 0.311 0.533 6.4 B 6.1 B
T - 1003 1881 0.355 0.533 6.2 E.
R E53 1599 0.091 0.533 5.2 E
SB L 367 688 0.515 0.533 7.9 B 9.5 6
TR - 986 1648 0.721 0.533 9.9 B
intersection Delay = 8.8 sec/veh intersection LOS = B
Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.561
- --------- ------------ -------------------- - -- ---------- ----------
HCM: SIGNALIZED INTERSECTION SUMMARY Version 2.4d OS-22-1997
Center For Microcomputers In Transportation
-----------------------------------------------------------------------
_____________________________
Streets: (E-W) lincoln (N-S) lemay
Analyst: Matt File Name:
Area Type: Other 5-22-97 am pm
Comment: short range
Eastbound I Westbound Northbound Southbound
: L T R; L T R; L T R; L T R
:---- --------;---- ---- ----;---- -------:---- --- ----
No. Lanes ; 1 1 < : 1 1 1 : 1 1 1 1 1
Volumes 60 115 451 110 220 205; 45 590 25; 75 460 30
PHF or PK15:0.90 0.90 0.90:0.90 0.90 0.90;0.90 0.90 0.90:0.90 0.90 0.90
Lane W (ft):12.0 12.0 :12.0 12.0 12.0;12.0 12.0 12.0:12.0 12.0
Grade : 0 0 ; 0 0
% Heavy Veh; 1 2 1; 1 2 1; 1 1 1; 1 1 1
Parking ;(Y/N) N ;(Y/N) N ;(Y/N) N :(Y/N) N
Bus Stops 0; 0; 0: 0
Con. Peas ; 0; 0; 0; 0
Ped Button :(YIN) Y 14.5 s;(Y/N) Y 11.5 s!(Y/N) Y 14.5 s;(Y/N) Y 11.5
Arr Type 3 3 3 3 3; 2 3 3; 3 3
RTOR Vols 0; 0; 0: 0
Lost Time :3.00 3.00 3.0013.00 3.00 3.0013.00 3.00 3.00:3.00 3.00 3.00
Prop. Share; I
Prop. Prot.;
_______________________________________________________________________
Signal Operations
Phase Combination 1 2 3 4: - 6 7 8
EB Left * ;NB Left
Tnru ' Thru '
Right ' Right
Peas Peas
W8 Left ' ISB Left
Thru '" ; Thru
Right Right
Peds reds
NB Right :EB Right
SB Right !WB Right
Green 20.OP !Green 30.0P
Yellow/AR 5.0 !Yellow/AR 5.0
Cycle Length: 60 secs Phase combination order: a1 #41
_______________________________________________________________________
intersection Performance Summary
Lane Group: Adj Sat v/c 9/C Approach:
Mvmts Cap Flow Ratio Ratio Oeiav Lu5 Delay LOS
_____ ____ _______ _____ _____ _____ ___ _____ ___
CB L 315 658 0.213 0.367 1u. 0 a 10.2 B
TR 654 1784 0.272 0.367 10.2 B
wB L aDt 1094 0.304 0.36' 10.4 B 10.7
T - 683 186E. 0.357 0.367 10.7 E
R 586 1599 0.389 0.367 10.9 6
N6_ L 174 327 0.267 0.533 6.1 .6 8.4 6
T 1003 1881 0.654 0.533 8.7 B
R 855 1599 0.033 0.533 S.1 B
SB L .125 235 0.662 0.533 15.9 C 8.6 6
TR 994 1864 0.547 0.533 7.5 6
Intersection Delay = 9.3 sec/veh Intersection LOS = B
Lost Time/Cycle, L = 6.0 sec Critical v/c(x) = 0.551
-----------------------------------------------------------------------
it
1 !.
APPENDIX A
Table 1
Short Range Peak Hour Operation
Level of Service
Intersection AM PM
Lemay/Lincoln (signal) B B
Lincoln/Access (stop sign)
NB LT/RT B B
WB LT A A
Lincoln/12th (stop sign)
NB LT B B
NB RT A A
WB LT A A
sA--1 /1
28/15
/ —/16/8
9/26 - J�
10/27
N
N
AM/PM
112
N
0/1
I Buffalo Run y
I Site t
SITE GENERATED PEAK HOUR TRAFFIC Figure 3
I LEasts I N
PUo I AM / PM
_ L
Rounded to the Nearest
5 Vehicles.
to
� 55/205 �-�125/220 140/110 520 �18
%— 5151510
25/60 r 420/215 - 410/185
115 180
/ � 10/30 � � � 4/NC
45/45 Q�
ocr 'n 410/', ~76
� rssisos
I Buffalo Run g
I Site t
SHORT RANGE TOTAL PEAK HOUR TRAFFIC Figure 4
9
c4
g=
n
-�
45/170
— 88/187
r-19/89
19/45 --�
155/80 —�
37/39
AM/PM
A&
N
1996 PEAK HOUR TRAFFIC Figure 1
AL
TRIP DISTRIBUTION Figure 2
Based upon review of existing and short range future
employment data, a simplified gravity model was used to determine
the trip distribution. This trip distribution is shown in Figure
2. Figure 3 shows the assignment of the site generated traffic at
the key intersections. Based upon the site plan layout, it was
assumed that the center access would accommodate 65 percent of the
site generated traffic. The remainder would utilize the 12th
Street access. When developments occur to the south, there will
be other opportunities for access to Lemay Avenue via 12th Street
to Mulberry Street to the south.
Background traffic at the Lemay/Lincoln intersection was
determined by factoring the 1996 counts by 2.0% per year on Lincoln
Avenue and almost 5.0% per year on Lemay Avenue. These factors
were obtained from information contained in the "North Front Range
Regional Transportation Plan," 1994. Traffic forecasts from two
recently approved developments (Kawulok PUD and Lincoln East PUD)
were added to the background traffic. Figure 4 shows the
background plus site generated peak hour traffic at the key
intersections. This reflects a short range (year 2000) condition.
Table 1 shows the peak hour operation at the key
intersections. Calculation forms are provided in Appendix A. The
key intersections are expected to operate acceptably. While
traffic volumes will not warrant auxiliary lanes, it is expected
that widening on the south side of Lincoln Avenue, adjacent to the
site, will enable striping of center left -turn lanes at 12th
Street and the proposed private access to Lincoln Avenue. The
distance from the 12th Street access to Lincoln Avenue is
sufficient so as not to cause a queue of vehicles from blocking the
proposed access.
It is concluded that, in the short range future, the operation
at the key intersections will be acceptable with the development
and occupancy of Buffalo Run. Other than the improvements required
adjacent to the property, no additional geometric or control
improvements are required.
MEMORANDUM
M
LO
o
C
M
C)
LO
TO: Scott McFaddan
0
Eric Bracke, Fort Collins Traffic Engineer
CC
CD
Ted Shepard, Fort Collins Planning Department
0
0
°
U
rn
'FROM: Matt Delich
0
ii
DATE: May 28, 1997
a
J
>
SUBJECT: Buffalo Run Traffic Study
3
(File: 9734MEM1)
w
C)
N
Q
a>
This memorandum documents the traffic engineering
oco
T
analyses related to development and occupancy of Buffalo Run,
W
o
an affordable residential complex located in the southeast
=
rn
quadrant of the Lemay/Lincoln intersection in Fort Collins.
w
w
The analyses assumed development of this project without the
0
0
proposed power center to the south. A short range analysis
N
d
was requested. The scope of this study was discussed with
rl-
N
staff.
N
These evaluations used information contained in the
"Lincoln East PUD Site Access Study," August 1996. Figure 1
shows the 1996 peak hour traffic count at the Lemay/Lincoln
intersection. As documented in the cited study, this
intersection operates at level of service B during the peak
hours with the existing signal control and geometry.
The proposed development will have two accesses to
Lincoln Avenue. One is a private driveway, located
approximately 850 feet east of Lemay Avenue. The other is a
Uj
driveway accessing future 12th Street, which is located 1400
4.
z
feet east of Lemay Avenue. The site driveway to 12th Street
FE
is approximately 150 feet south of Lincoln Avenue. Twelfth
z
Street will also serve development to the south in the future.
UAs
part of future development to the south, access to Buffalo
z
Run also will be provided via a future private road on the
.I
W
south edge of the property. This road will be built by other
W
o
developments.
Buffalo Run is an affordable residential development
7
o
a
consisting of 144 apartment dwelling units. Using land use
N
a
code 220 from Trip Generation, 5th Edition, ITE, the following
Q
F-
trip generation is expected:
W
Ca
_
Daily - 1000 trip ends
U.Morning
in - 16 trips
H
Morning out - 48 trips
Q
Afternoon in - 45 trips.
Afternoon out - 26 trips