HomeMy WebLinkAboutMULBERRY & LEMAY CROSSINGS, APTS. (BUFFALO RUN) - PRELIMINARY PUD - 36-96A - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject: (�l
w
Planner:
Engineer:
Traffic Operations:
Date:
Items Requested
Redlined Items Being Return
Other:
Note: All redlined items should be returned with tfie resubmittal/ revisions.
Site land Plat Utility Drainage Apt Other Items Required
Engineering /
ed
Site land Plat Utility Drainage Rpt Other Items Being Returned
Stormwater,y
Water/Wastewate
Traffic Operations
Trans. Planning
/
Transfort
Natural Resources
Park Planning
Totals
2
�
y
Ahk
Ahk
Revisions Routing Sheet
FILE: PROJECT PLANNER
......-....._
PAVEMENT.......
-.-.--
ME!
Ellm
BUILDING INSPECTION
m
MAPPING / DRAFTING
....
PSA
`N
Ell
IN
—
Ell
mmm
lm0
m
ADVANCE PLANNING
mmmmomm
mmm
WATER CONSERVATION
POST OFFICE
Ell
Mill
PUBLIC SERVICE
NUL
GG
DITCHCOMPANY
������►
MM
Nommmom
RAILROAD: UP or BN/CS
Elm
Ell
mm
ii�������■����
ON
wommm
NEI
Ell
E�
�NoNow
Ell
Ell
mm
MEIN
WE
neY.