HomeMy WebLinkAboutMULBERRY & LEMAY CROSSINGS, APTS. (BUFFALO RUN) - PRELIMINARY PUD - 36-96A - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTChecksheet - Buffalo Run Apartment Application for Preliminary Planned
Unit Development
/Application - 1 copy
.7 Filing Fee - $1472 for PUD and $656 for Plat
3.Legal Description of property - 2 copies
*./APO list of all owners of record within 1,000 feet of property
,,!/Planning Objectives - 25 copies
W /Completed Point Charts - 25 copies
4' Energy Conservation Worksheet - 25 copies
'z' Architectural Elevations - 5 folded copies
%Site Plan - 25 folded copies
q4. Landscape Plan - 16 folded copies
`N. Utility Plans - 10 unfolded copies
12. Street Cross Sections - 5 unfolded copies
Physiographic Date - 2 copies
aC Preliminary Drainage Report - 4 unfolded copies
Preliminary Subdivision plat - 21 folded copies
16. Traffic Impact Analysis - To be provide upon revision
17. Hazardous Materials Analysis - not applicable
AM)
City of Fort Collins
Current Planning
%* ?, 1 tom%
SUBMITTAL CIIECKSHEET
The following checksheet is to be used in the preparation of a complete submittal of a
Preliminary PUD Plan
1. Application form (1 copy)
2. Filing Fee: +_W per sheet of subdivision plat
3. Legal description of property (2 copies) on 8 1/2" x 11" sheet
4. A current list of names and addresses of all owners of record of real
property within 500 feet `
5. Planning Objectives (25 copies)
6. Completed point charts (3 copies)
7. Energy conservation worksheets (3 copies)
8. Architectural elevations (5 folded copies)
9. Site plan (25 folded copies)
10. Landscape plan (16 folded copies)
11. Utility plans (10 unfolded copies)
12. ,Street cross sections (5 unfolded copies)
13. Physiographic data (2 copies) C
14. Preliminary drainage report and plans and grading plans (4 copies)
15. Preliminary subdivision plat (21 folded copies) j _
16. Traffic impact analysis (4 copies)
17. Hazardous materials impact analysis (4 copies)
18. Other documentation tt%tee
19. Signage (circle one) 0
Large
S.F. 100 or more D.U.
M.F. 100 or more D.U.
Non -Res 50,000 S.F. or more
Non -Res w/regional impact
Small
S.F. up to 100 D.U.
M.F. up to 100 D.U.
Non -Res 25,000-50,000 S.F.
All other projects not listed