March 15, 2001
Page 4
Mr. Schlueter replied that staff has not really got into yet what the design or fix will be for
that intersection.
Member Craig asked Mr. Schlueter to involve Mr. DiMirando in the process.
Mr. Schlueter replied he would.
Member Craig asked what the city was going to do to improve the health and safety of
the children.
Tom Reiff, Transportation Department replied that the Engineering Department has
identified the north shoulder of Vine Street to be improved by paving the soft shoulder
that is currently there. That would add approximately 6 feet of bike lane and give or
take an additional 4 feet of pavement for the sidewalk portion of it. It will go from Lancer
to the other edge of Lancer all the way out to Taft Hill. The County will also make
improvements to their portion of the street.
Member Craig asked when the construction would occur.
Mr. Reiff replied that the actual construction will not take place until the asphalt plants
open in the spring and then it will be phased in. He was not sure what the time frame
would be. He sees this as being completed by summer.
Member Colton moved for approval of the Lincoln Junior High School Addition,
#40--W.
0-45'D
Member Bernth seconded the motion.
The motion was approved 5-0.
Project:
Project Description:
Recommendation:
Settler's Green at Rigden Farm PDP —
Modification of Standards
Request for two Modifications to Section
3.5.3(D)(3) of the Land Use Code.
Approval with Conditions
Planning and Zoning Board Minutes
March 15, 2001
Page 3
Recommendation: Approval
Hearing Testimony, Written Comments and Other Evidence:
Lynn DiMirando, 1529 West Vine spoke about his concerns with health and safety of the
kids that go back and forth to Lincoln Junior High, traffic and parking with the new
addition and wastewater runoff.
Planner Shepard responded that there should be a presentation from the applicant.
Ron Daggett, Poudre School District gave the applicant's presentation. He stated that
this project is an addition to the Junior High School and will contain a gymnasium, three
or four classrooms, some work areas and a variety of things for the youth. Poudre
School District will use the building during the normal school days from 7:00 a.m. until
3:00 p.m. The Boys and Girls Club will use the facility in the afternoon, evenings,
weekends and summer months.
Mr. Daggett responded to some of the health and safety concerns. He stated that he
has been in contact with someone from the city Engineering Department. He stated
there are plans for some crosswalk work as well as shoulders and bicycle lanes in that
area. As far as parking and traffic goes, he did not foresee any increase in traffic or
parking. The children who attend the Boys and Girls Club do not drive automobiles.
They will be riding school buses or walking to the site. There is adequate parking on
the site and if that becomes an issue, they will increase the parking. Lincoln is the
largest Junior High site in the district and there is plenty of room to increase parking.
Mr. Daggett responded to the issue of wastewater runoff. He stated he could resolve
that by rebuilding the intersection so the water would not run across Vine Drive into Mr.
DiMirando's front yard. They have already provided detention on the site to take care of
the runoff from the new building. The issue is the historic runoff.
Glenn Schlueter, Stormwater Department added that the School District has agreed to
design a detention pond and also to rebuild the intersection. That would be an offsite
improvement that we would normally not require, so if they are willing to do that it would
be great.
CITIZEN INPUT
Mr. DiMirando felt that raising the intersection any more would just create more
problems. He submitted pictures of the intersection for the Board to view.
Planning and Zoning Board Minutes
March 15, 2001
Page 2
17. #43-98E Coyote Ridge 6th Annexation and Zoning
18. #3-01 2021 Timberline Lane Rezoning
19. #12-97D Harmony Technology Park, Hewlett Packard — Project
Development Plan
Member Colton and Chairperson Gavaldon declared a conflict of interest on Item
19, Hewlett Packard.
Member Bernth declared a conflict of interest on Item 18, 2021 Timberline
Rezoning.
Lynn DiMirando, citizen asked for Item 3, Lincoln Jr. High School Addition be pulled for
discussion.
Betty Aragon, citizen, asked for Item 7, Poudre Development Rezoning be pulled for
discussion.
Member Craig asked for Item 4, Settlers Green at Rigden Farm, PDP, Modification of
Standards be pulled for discussion.
Member Carpenter moved for approval of the Consent Agenda items 1, minus the
May 18th minutes, 2, 5, 6, and 8.
Member Bernth seconded the motion.
The motion was approved 5-0.
Project:
Lincoln Junior High School Addition, Site Plan
Advisory Review, #13-98B
Project Description: Request to expand Lincoln Junior High School
by constructing a new building containing
19,497 s.f. The building would feature
classrooms, computer lab, gymnasium,
recreational facilities and kitchen. The
predominant after school user would be the
Boys and Girls Club of Larimer County. The
site is approximately one acre and zoned UE,
Urban Estate.
Council Liaison: Scott Mason
Chairperson: Jerry Gavaldon
Vice Chair: Mikal Torgerson
Staff Liaison: Cameron Gloss
Phone: (H) 484-2034
Phone: (W) 416-7431
Chairperson Gavaldon called the meeting to order at 6:35 p.m.
Roll Call: Colton, Bernth, Craig, Gavaldon, Carpenter and Meyer(late). Member
Torgerson was absent.
Staff Present: Gloss, Eckman, Jones, Moore, Shepard, Olt, Grubb, K. Moore, Reiff,
Schlueter, Wamhoff, Virata, Wilder, Bracke, Daggett.
Agenda Review: Director of Current Planning Cameron Gloss reviewed the Consent
and Discussion Agendas:
Consent Agenda:
1.
Minutes of the May 18 (Continued), October 19, 2000 and
January 18, 2001 Planning and Zoning Board Hearings.
2.
# 6-01
Harris Bilingual Elementary School Expansion — Site Plan
Advisory Review
3.
#40-00
Lincoln Junior High School Addition — Site Plan Advisory
Review
4.
#56-98J
Settler's Green at Rigden Farm, PDP — Modification of
Standards
5.
Modifications of Conditions of Final Approval
6.
#7-01
Staley Annexation and Zoning
7.
#1-01
Poudre Development Rezoning
8.
#2-01
Speights PUD, Lots 6 & 7 and the West Half of Tract A
Rezoning
Discussion
Agenda:
9.
Recommendation to City Council for Adoption of the Transfort
Strategic Operating Plan
10.
#40-98
Cathy Fromme Natural Area Annexation and Zoning
11.
#40-98A
Cathy Fromme 2"d Natural Area Annexation and Zoning
12.
#43-98
Coyote Ridge 1st Annexation and Zoning
13.
#43-98A
Coyote Ridge 2"d Annexation and Zoning
14.
#43-98B
Coyote Ridge 3`d Annexation and Zoning
15.
#43-98C
Coyote Ridge 4th Annexation and Zoning
16.
#43-98D
Coyote Ridge 5th Annexation and Zoning