Loading...
HomeMy WebLinkAboutLINCOLN JR. HIGH ADDITION - SITE PLAN ADVISORY REVIEW - 13-98B - CORRESPONDENCE - (3)Wow PROJEC, r CR�,IMENT SHECity of Fort Collins RE ppp Current Planning pEG P�pNN�NG DATE: November 30, 2000 TO: PFA PROJECT: #40-00 LINCOLN JR. HIGH ADDITION — SITE PLAN ADVISORY REVIEW — TYPE II (LUC) All comments must be received by TED SHEPARD in Current Planning no later than the staff review meeting: December 20, 2000 Note- Please identify your redlines for future reference SPRINKLER REQUIREMENTS: This proposed building shall be fire sprinklered. 97 UFC 1003.2.9 NOTE: Poudre Fire Authority requires a "Knox Box" to be mounted on the front of . every new building equipped with a required fire sprinkler system or fire alarm system. 97 UFC 902.4; PFA POLICY 88-20 /,2,/20/Zovo Signature CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat Site _Drainage Report _Other _Utility Redline Utility _Landscape Runk m� City of Fort Collins I oomft City of Fort Collins Current Planning PROJEC, f COMMENT SHEET E�EeNIIED DATE: November 30, 2000 TO: Light & Powq�vosT ploNING PROJECT: #40-00 LINCOLN JR. HIGH ADDITION — SITE PLAN ADVISORY REVIEW — TYPE II (LUC) All comments must be received by TED SHEPARD in Current Planning no later than the staff review meeting: December 20, 2000 Note- Please identify your redlines for future reference jF PSP 77/1s Tl-"7 ,L0 v'= /4 Sv/,flRr3TE ELc�cT/2�G sc52✓lac o,2 /� T/1c= CxIsT,i✓�j S a�OOL iC�-L'� I G SLC� ✓1 G(c w/L L %�v GG//�n/4Fa, /�S n W i L L,1 Nlrc LCD 7W G 0. ✓ c T �\ v° �.✓!, /i✓6c/Z ge%y' CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat _Site _Drainage Report _Other. _Utility _Redline Utility _Landscape ldomoonok City of Fort Collins �L Commu y Planning and Environmental Building and Zoning Department CAY-of Fort Collins Codes and Standards Amended 5/12/99 Amended 11/19/99 AIX; / Amended 11/29/00 vices All construction within the City of Fort Collins shall comply with current adopted editions of the Uniform Codes: 1997 Uniform Building Code 1991 Uniform Mechanical Code 1997 Uniform Plumbing Code 1999 National Electrical Code 1995 Model Energy Code with amendments for residential Fort Collins Nonresidential Energy Code, an amended version of ASHRAEAES 90.1-1989 Accessible and Usable Buildings and Facilities, ICC/ANSI Al17.1-1998, as State adopted . standard Wind Load: design for 100 MPH Exposure B or 100 MPH Exposure C if building site has flat open terrain extending outward for %2 mile in any full quadrant. Dead Load: 15 PSF min. Snow Load Live Load: 30 PSF Seismic Zone 1 . Staff Contacts For questions pertaining to commercial construction, please contact Rick Lee. For questions that pertain to residential and/or multi -family, please contact Dick Valdez. Both can be reached at 221-6760. For questions pertaining to required contractor and sub -contractor licensing, please contact Delynn Coldiron at 221-6767. Submittals All submittals for review of construction documents and release of building permit, shall include: (1) Completed building permit application per building. (1) Completed application checklist for commercial and/or residential. (2) Complete sets of Colorado professional "Wet Stamped" plans, include: site plans, engineered foundations, architectural, engineered structural, mechanical, electrical, and plumbing drawings. Completed Energy Code compliance forms. 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6760 • FAX (970) 224-6134 PROJEC, F COMMENT SH E 7 ED City of Flirt Collins' �VEp, Current Pllnnning R E C E fig'` " Li NO D DATE: Novemb eiQS P2G TO: Building Insp. PROJECT: #40-00 LINCOLN JR. HIGH ADDITION — SITE PLAN ADVISORY REVIEW — TYPE II (LUC) All comments must be received by TED SHEPARD in Current Planning no later than the staff review meeting: December 20, 2000 Note- Please identify your redlines for future reference Please find attached the various codes that the Fort Collins Building Department will enforce. From the brief information provided I notice that EIFS is proposed for the exterior wall finish and an often - missed element to this is the weather resistive barrier requirements of 1402.1. Fully adhered rigid insulation does not satisfy this section. Also please verify the occupancy separation between B & E occupancies which your description suggest. Date:12/18/99- Plans Analyst Rick Lee CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS _Plat Site Drainage Report _ Other �- -Utility _Redline Utility _Landscape City of F� ort Collins PROJE(!oI' COMMENT SHEETE C E 11, D . City of Flirt Collins DEC 0 6 2000 CurrentTlanning CURRENT Pr an,NU1G DATE: November 30, 2000 TO: Public Service PROJECT: #40-00 LINCOLN JR. HIGH ADDITION — SITE PLAN ADVISORY REVIEW — TYPE II (LUC) All comments must be received by TED SHEPARD in Current Planning no later than the staff review meeting: December 20, 2000 Note- Please identify your redlines for future reference {�^ W,�I� a� 1' wcATcry a� ,�W� ^NYaitSeAL 4AS Ll.r iN ca�uju,?�— W I'(H. AVoj 7ftaV wiiL(. 06 (. A"e;AOLS- -TZ) -Vra- 3i� D13jVtzf CHECK HERE IF YOU WISH TO RECEIVE COPIES OF REVISIONS r Plat Site _ Drainage Report _Other ,0 Utility _Redline Utility Landscape I& -- City of Fort Collins LETTER OF TTRANSMITTAL To:. , roE Frx_ ye- _( AuGnT - F,cyE Date: / - / G - D t Project: L/A/Gac.n/ 7X-. /1/6- Zi00)7—rQrJ TRANSMITTED HEREWITH ARE: m/ Redlined Utility Plans See attached sheet for number of copies to resubmit. Resubmit copies to: ❑Current Planning ❑Engineering w Redlined Storm Drainage Report See attached sheet for number of copies to resubmit. Resubmit copies to: ❑Current Planning ❑Engineering ❑ Development Agreement Please sign, seal, date, and return all copies of this agreement. Changes in the agreement take two (2) days to process if they are acceptable to the City. Please take this into account in your schedule. Again, all copies must be returned. ❑ Original Mylars Needing Revisions Please return with the "post -it" notes intact. ❑ Original Mylars with City Signatures Please return one (1) mylar and four (4) signed and stamped blueline print copies for our files. ❑ Development Construction Permit Application Please fill out and return to Engineering counter with application fee and all required attachments. ❑ Development Construction Permit for your Signatures Please sign (but do not date) and return. ❑ Attached is your Copy of the Development Construction Permit ❑ Draft Development Agreement For your review and comments. Please call with your comments or questions. Let me know if everything is okay. ❑ Attached is your Copy of the Development Agreement. Zother: &4- [J Fx,in 8,VX/Z ryT PLRrvNllv l sn/s,_ Transportation Services --- Engineering Department 281 North College Avenue — P.O. Box 580 — Fort Collins, CO 80522-0580 — (970) 221-6750 12. Please add building envelope dimensions to the site plan. 13. Please note the attached comments and redlines from Engineering, Stormwater, Water and Wastewater, Public Service, Light and Power and Poudre Fire Authority. This concludes Staff comments at this time. As always, please call if you have any questions or concerns about these comments. It is our intention to schedule a public hearing at the time that comments are reasonably addressed. Sincerely: Ted Shepard Chief Planner Enc. promote the campus concept by adding an east -west sidewalk, framed by shade trees and connecting to cross -walks that allow pedestrian access over to the school. 4. At the recommendation of the Parks and Recreation Department, a sidewalk should be added to the north side of the site between the gym and the private drive. This would then allow future users of Huidekoper Park to park in the parking lot and gain access to the neighborhood park. 5. It would be helpful to show the location of the existing Transfort bus stop on the plans. Be sure there is a continuous sidewalk connecting this stop to the building entrance. 6. Staff is not clear on the function of the west building entrance. It appears that the sidewalk, connection ties into the travel lane of the private access drive for the school. Is it the desire to connect over to Huidekoper neighborhood park? If so, a crosswalk should be added. Have you considered adding a north -south sidewalk on the west edge of the site so this west building entrance connects to the sidewalk network? It appears that the pedestrian system is incomplete. 7. Staff recommends creating a stronger connection between the existing parking lot and the building entrance. Perhaps an existing parking space could be removed in favor of a sidewalk. This would visually tie the parking lot to the entrance. 8. Be sure to indicate handicap ramps for all sidewalks. 9. Please indicate a bike rack near the entrance. 10. Regarding the architectural elevations, Staff has the following comments: A. The north elevation looks a little bleak. Would it be possible to add some horizontal reveals to match the one EIFS band? B. Would it not be a good idea to improve day -lighting in the gym by adding a row of windows similar to east and west elevations? C. Could horizontal reveals be added to the west elevation of the gym as well? D. Could the top of the flat roofs feature a top or cap element? This would help add some relief and may be more effective than simply a metal flashing. 11. Staff recommends that foundation shrubs be lengthened to cover the three sides of the gym to help mitigate the mass of the structure. Commu I Planning and Environmental vices Current Planning City of Fort Collins January 10, 2001 Mr. Joe Frye Vaught -Frye Architects 401 West Mountain Avenue Fort Collins, CO 80521 Dear Joe: Staff has reviewed the request for the Lincoln Junior High School, Classroom/Facility Addition, Site Plan Advisory Review, and offers the following comments: There appears to be an opportunity to strengthen the connections between the proposed building and the existing school to create a more cohesive campus setting. For example, Staff recommends that the 24-foot wide north -south drive aisle on the east side of the building be converted to a bike and pedestrian walkway only. This would create a safer pedestrian environment. Such a walkway could be 10 feet wide and thus be able to act as a vehicle access for limited purposes. Such a walkway could be framed by shade trees to help establish the connection to the school. There are two private drives and one public drive on three sides of the site. There is a parking lot on the east side. It is difficult to imagine more than just an occasional need for an additional drive aisle on the east side that features two- way traffic. If there is an operational aspect of the Facility/Classroom Addition that we are not aware of that necessitates this drive, then all we ask is that its width be reduced, and that the sidewalk be detached with shade trees in the parkway strip. 2. Perhaps the five parking spaces directly in front of the building could be reduced to just two handicap spaces with a small area for backing out. It appears that there is ample parking in the parking lot for Facility/Classroom Addition and the three regular spaces could be eliminated. Lancer Drive is a very wide street which can easily accommodate parallel parking should there be a need for overflow parking. 3. There appears to be an unfinished landscape island on the north side of the existing parking lot. Staff recommends that this area could be improved to 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750, • FAX (970) 416-2020