Loading...
HomeMy WebLinkAboutLINCOLN JR. HIGH ADDITION - SITE PLAN ADVISORY REVIEW - 13-98B - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject: Planner: T�I�,eaL�� Engineer: Ka h' p . C oc��f-- Traffic Operations: ,?evle,=) Date: zv Items Requested Site land Plat Utility I Drainage Rpt Other Items Required Redlined Items Being Returned Site land Plat Utility Drainage fl t Other Items Being Returned itormwater X 4 x �14 _ x n Rater/Wastewater x X rid l�r�e ti TraUiic Operations _ Trans. Planning;Ltvst J �� Transfort - rn � Natural Resources Park Planning Totals Other: Note: All redlined items should be returned with the resubmittal/ resdsiom. Revisions Sheet f-vjva-A v% Routing l A, Date: VA 111 ENGINEERING: PAVEMENT BUTLDING INSPECTION LIGHT & POWER MAPPING / DRAFTING M • • -...-.----.-all .0 EADVANCE PLANNING M got WATER CONSERVATION POST OFFICE PUBLIC SERVICE STATE HIGHWAY DEPARTMENT mom RAILROAD: UP or BN/CS 3rti P 0VNd