HomeMy WebLinkAboutLINCOLN JR. HIGH ADDITION - SITE PLAN ADVISORY REVIEW - 13-98B - SUBMITTAL DOCUMENTS - ROUND 3 - ROUTING SHEETProject:
Planner: T�I�,eaL��
Engineer: Ka h' p . C oc��f--
Traffic Operations:
,?evle,=)
Date: zv
Items Requested
Site land Plat Utility I Drainage Rpt Other Items Required
Redlined Items Being Returned
Site land Plat Utility Drainage fl t Other Items Being Returned
itormwater
X
4
x
�14
_
x
n
Rater/Wastewater
x
X
rid l�r�e
ti
TraUiic Operations
_
Trans. Planning;Ltvst
J ��
Transfort -
rn �
Natural Resources
Park Planning
Totals
Other:
Note: All redlined items should be returned with the resubmittal/ resdsiom.
Revisions Sheet f-vjva-A
v% Routing
l A,
Date:
VA 111
ENGINEERING: PAVEMENT
BUTLDING INSPECTION
LIGHT & POWER
MAPPING / DRAFTING
M
• •
-...-.----.-all
.0
EADVANCE
PLANNING
M
got
WATER CONSERVATION
POST OFFICE
PUBLIC SERVICE
STATE HIGHWAY DEPARTMENT
mom
RAILROAD: UP or BN/CS
3rti P 0VNd