HomeMy WebLinkAboutMULBERRY AND LEMAY CROSSING (FORMERLY LEMAY TOWNE CENTER) - ODP - 36-96 - CORRESPONDENCE - (3)the traffic study, please contact Fred Jones, 221-6820.
23. Bicycle and pedestrian linkages should be prioritized as an integral part of the initial site
planning. Sidewalks and paths should not be placed in residual spaces left over after the
parking lot layout is established. There must be direct pedestrian connections from the
perimeter buildings out to the public street sidewalks. There must be strong, identifiable
and safe pedestrian'connections linking the apartments to the commercial shopping center.
The apartments must allow space for bike racks.
24. The City has also recently adopted Capital Improvement Expansion Fees for residential
units based on the size of the unit. There are five categories. A copy of these fees is
available from the Planning Department. As an affordable housing project, your fees are
delayed and not due upon the issuance of building permits.
25. In addition, the City assesses a Street Oversizing Fee of $554 per unit.
26. The City also assesses a Neighborhood Parkland Development Fee. There are five
categories based on unit size. A copy of this fee schedule is available from the Planning
Department.
27. All trash enclosures must be screened with materials to match the building's exterior.
Enclosures must be on all four sides with a swinging gate. Trash areas should be mounted
on concrete, not asphalt. Enclosures must contain sufficient space for storing containers
for recyclable materials.
28. Areas of low visual interest must be screened. Areas include electrical and gas meters,
outside HVAC equipment, eta
29. Upon submittal, please include a context diagram showing the relationship to all
surrounding land uses. The diagram should indicate how connections by all modes are
made to surrounding properties_ Also, please indicate the location of outdoor spaces that
contribute to the urban environment.
30. The project is eligible for priority processing and fee delays as an affordable housing
project.
31. This letter is not meant to be the definitive document in determining the ultimate fees that
must be paid on a per unit basis. As the developer, you are strongly encouraged to visit
with all the utility providers, public and private, to obtain more accurate estimates of the
fees that will be due.
32. A community information meeting has been scheduled for Thursday, January 23, 1997 to
discuss the Wal-Mart proposal. This meeting will take place at the City Streets Facility on
North Lemay Avenue beginning at 7:00 p.m. Please be prepared to make a brief
presentation.
encouraged to coordinate with the civil engineering consulting firm that is preparing the
Wal-Mart submittal for details on drainage constraints. Development of the site must be
closely coordinated with the drainage improvements planned for the shopping center.
14. At the time of Preliminary P.U.D., a Drainage Report, Drainage and Grading Plan, and
Erosion Control Plan will be required meeting the specifications of the Stormwater Utility.
15. If this site is developed prior to the shopping center without a proper outfall, then storm
flows' will have to be directed on the shopping center property. This will necessitate an
offsite easement from this property owner. A letter of intent from the intervening owner
demonstrating a willingness to grant a temporary drainage easement will be required at the
time of submittal for a Preliminary Plan. At the time of submittal for a Final Plan, this
easement should be granted and a copy given to the Stormwater Utility. For further
information, please contact Glen Schlueter, 221-6589,
16. Both Lincoln and Lemay are classified as arterial streets according to the City's Master
Street Plan. As developer, you will be required to dedicate a sufficient amount of land so
that there is 57.5 feet of public right-of-way along your frontage of Lincoln as measured
from the center line in to your property. For Lemay, you will be required to dedicate an
additional 7.5 feet to the existing right-of-way.
17. Along both arterials, a 14 foot wide utility easement must also be dedicated on your
property immediately abutting the right-of-way.
18. The service road should intersect with Lincoln at a ninety degree angle. If a ninety degree
angle is not feasible, then all issues associated with sight distance and safety must be
addressed. The width of the service drive will be determined by the average daily trips as
calculated by a Traffic Impact Study.
19. Both Lincoln and Lemay must be improved along your frontage with detached sidewalks,
vertical curbs, and gutters. The parkway strip between walk and curb will be public but
must be planted with street trees and ground cover with maintenance by the developer.
After establishment, the long term maintenance of the street trees will be by the City
Forester.
20. Please be advised that Diamond Shamrock is preparing an interim design for
improvements to the Lincoln/Lemay intersection. Please contact David Jones, Galloway
and Romero, 303-770-8884, for information.
21. Utility Plans will be required with a Preliminary submittal. For further information
regarding engineering standards and submittal requirements, please contact Mike Herzig,
221-6750.
22. A traffic impact analysis will be required. The study should analyze the level of service
and the impacts on all affected intersections. For information on the scope and details of
6. For your information, the City has a 24 inch diameter water line in Lemay. A repay is due
to the City for a portion of this line. The City has a 15 inch sanitary sewer line in Lemay.
Due to the curvature of Lemay on the northwest corner of the site, a portion of this sewer
line may run under the western -most buildings as shown on the Site Plan. Proper
separations must be maintained from the sewer line easement. For further information,
please contact Roger Buffington, 221-6681.
7. The parking lot must be designed to meet the City's Parking Lot Development Guide.
This will require landscaping in the form islands to break up long, linear rows of parked
cars. Eight handicap parking spaces will be required. Based on a per bedroom, per unit
calculation, 308 parking stalls will be required. Parking along perimeter streets should be
screened.
8. The property is located in the Residential Neighborhood Sign District. Signage in this
district is more restrictive than in the commercial areas.
9. The site will be served by the Poudre Fire Authority. Hydrants must be spaced every 800
feet. A knox-box will be required. The alarm for the automatic fire extinguishing system
must send a signal to the central office/clubhouse and then to the monitoring agency.
Water pressure must meet minimum flows as measured in gallons per minute. Water lines
must be looped but looping will not be allowed between the two eligible water providers.
For further information, please contact Roger Frasco, Assistant Fire Marshal, 221-6570.
10. The site must provide access for fire and emergency vehicles. Drive aisles must feature an
inside turning radius of 20 feet and an outside turning radius of 40 feet. Areas identified
by the Fire Marshal for emergency equipment must be painted with a red curb and signed
"No Parking - Fire Lane." All internal private drives must be constructed of adequate
roadbase and asphalt thickness to support the heaviest fire -fighting apparatus.
11. The buildings will be reviewed by the 1991 Uniform Building Code. Handicap
accessibility will be reviewed by 1992 ANSI. All ground floor units must be handicap
accessible. The same amount of bedroom mix offered in the project as a whole must be
offered for handicap units as well. Since the buildings will be equipped with an automatic
fire extinguishing system, there may be some trade-offs available in other site design
requirements. The City has recently adopted a new Energy Code for residential and non-
residential (office/clubhouse) buildings. For further information, please contact Sharon
Getz, Plans Examiner, 221-6760.
12. The site is located in the Poudre River Drainage Basin. Development of this site will be
regulated by the City of Fort Collins Stormwater Utility. Presently, there is no Storm
Drainage Fee in this particular basin. The site may be located in the floodplain. Although
Lemay Avenue acts as a levee, it may not have been accepted as such by FEMA. Please
check with Mike Grimm, Floodplain Administrator, 221-6589, for verification.
13. Establishing a positive drainage outfall for the project may be problem. You are
AMal =I CONCEPTUAL REVIEW STAFF COMMENTS
City of Fort Collins
MEETING DATE: December 16, 1996
ITEM: Buffalo Run Apartments, Southeast Corner of Lincoln and Lemay
APPLICANT: Mr. Scott McFadden, 4891 Independence, Suite 200, Wheatridge,
CO. 80033.
LAND USE DATA: Request for 168 multi -family dwelling units on nine acres located at
the southeast corner of East Lincoln Avenue and North Lemay
Avenue. Buildings would be three stories in height. Some
buildings may exceed the 40 foot height limitation to create varying
roof pitches. Site would include a clubhouse/recreation center and
outdoor playground.
COMMENTS:
Three-phase power is available from existing facilities on the south side of Lincoln. These
facilities would have to be brought to the site via underground conduit. With gas heat,
single phase power should be sufficient. A minimum distance of 13 is required between
building and back of sidewalk for proper separation of electrical and gas facilities and the
water stop box. Normal development charges will apply based on linear front footage
along public streets and on square footage of the site.
2. The location of the electrical transformer will need to be coordinated to be compatible
with streetscaping and landscaping. Transformers should not be visible from public right-
of-way. Screening can be by landscaping, berming or by solid enclosure meeting the
clearance specifications of Light and Power. The transformer must be within 10 feet of
hard surface on one side for emergency change -out by a boom truck.
3. Electrical utility easements must be platted on a subdivision plat that is approved by the
City Planning and Zoning Board.
4. The developer is responsible for street lighting on private streets. For further information
regarding electrical service please contact Bruce Vogel, Light and Power, 221-6700.
5. Water and sanitary sewer can be provided by both the City of Fort Collins and the ELCO
Water District and the Boxelder Sanitation District. The City has utilities in Lemay but
areas to the east are generally served by the two special districts. As with Wad -Mart, the
City is prepared to discuss utility extensions with the special districts and the applicants to
see what makes the best sense in serving the site.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. PQBox 580 Fort Collins, CO80522-0580 (970)221-6750
PLANNING DEPARTMENT
U ,
munity Planning and Environmental Services
Currer -inning
City of Fort Collins
December 19, 1996
Mr. Scott McFadden
4891 Independence
Suite 200
Wheatridge, CO 80033
Dear Mr. McFaddedn:
For your information, attached is a copy of the Staffs comments concerning the
Request for 168 multi -family dwelling units presented before the Conceptual Review
Team on December 16, 1996.
The comments are offered informally by Staff to assist you in preparing the detailed
components of the project application. Modifications and additions to these comments
may be made at the time of formal review of this project.
If you should have any questions regarding these comments or the next steps in the
review process, please feel free to call me at 221-6750.
Sincerely,
Ted Shepard
City Planner
TS/vrm
cc: Eric Bracke, Streets Department
Stormwater Department
Project Planner
File