HomeMy WebLinkAboutMULBERRY AND LEMAY CROSSING (FORMERLY LEMAY TOWNE CENTER) - ODP - 36-96 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTChecksheet
The following check sheet is to be used in the preparation of a complete submittal of an Overall
Development Plan:
I. Application form (I copy).
2. Filing feo4S6eMJ: "r--r Act
j 3. Overall development plan (25 foldedcopies).��"`�
4. List of names of owners of land included in overall development plan.
5. A current list of names and addresses of all owners of record of real property
within 500 feet.
6. Planning objectives (25 copies).
7. Legal description of property (2 copies on 8-1/2" x I I" sheet).
v 8. Conceptual drainage plan (4 copies).
✓" 9. Traffic impact analysis (4 copies).
-- - 10. Other documentation as determined by special circumstances.
4.6