Maple Hill, 3rd Replat
Administrative Hearing
Findings, Conclusions, and Decision
September 10, 2007
Page 4 of 4
3. Compliance with Article 3 of the Land Use Code — General Development
Standards
A. Section 3.3.1 [B] — Lots
The proposed lots continue to comply with the design standards in that each lot
has vehicular access to a public street, and the side lot lines are at substantially
right angles or radial to the street. The redesign does not impact the layout of
roads, driveways, utilities, drainage facilities and other services.
B. Section 3.3.1 [C] (1) - Public Sites, Reservations, and Dedications
The plat indicates the proper dedication for street rights -of -way, and drainage
and utility easements as needed to serve the shifted lots. The water and sewer
service lines have been appropriately adjusted.
SUMMARY OF CONCLUSIONS
A. The Maple Hill , Third Replat Project Development Plan is subject to
administrative review and the requirements of the Land Use Code (LUC).
B. The Maple Hill, Third Replat Project Development Plan is consistent with the
Gillespie Farm Overall Development Plan.
C. The Maple Hill, Third Replat Project Development Plan satisfies the development
standards of the LMN zoning district.
D. The Maple Hill, Third Replat Project Development Plan complies with all
applicable General Development Standards, including the Plat Standards,
contained in Article 3 of the Land Use Code.
DECISION
The Maple Hill, Third Replat Project Development Plan, #29-OOK, is hereby approved
without condition.
Dated this 11 th day of September 2007, per auty granted by Sections
1.4.9(E) and 2.1 of the Land Use Code. � I A
eron uios
ning and oning Director
Maple Hill, P Replat
Administrative Hearing
Findings, Conclusions, and Decision
September 10, 2007
Page 3 of 4
FACTS AND FINDINGS
1. Site Context
The surrounding zoning and land uses are as follows:
N: L-M-N; Existing and Future single-family Residential (Lind Subdivision)
S: L-M-N; Existing recreation center and future development (Maple Hill
Subdivision)
E: L-M-N; Future single-family residential (Maple Hill Subdivision)
W: R; Future single-family residential (Maple Hill Subdivision)
The Maple Hill project is part of a larger 320-acre parcel that was annexed in
1978.
The parcel is located within the Mountain Vista Area Plan adopted by City
Council in March of 1999. The 160-acre Gillespie Farm Overall Development
Plan was approved in February of 2001 and amended in October of 2002.
The original Maple Hill subdivision was approved on September 9, 2003. This
approved project represents the first and largest phase of a residential
subdivision that is located on 136.89 acres at the southeast corner of Turnberry
Road (previously named County Road 11) and Richards Lake Road. This was
followed by a replat in August 2004 which resulted in an increase of 10 single
family lots and a decrease in seven duplex lots for an overall gain of three lots.
2. Compliance with Article 4 and the LMN Zoning District Standards:
The plat complies with the standards found under Article Four of the Land Use
Code. The applicant's request to reconfigure Lots 5 and 6 of Block 2, and Tract
C, complies with the following standard:
Section 4.4(D) — Land Use Standards
Since there are no new lots or residential units associated with the replat, the
PDP will continue to comply with the minimum density requirement of the zoning
district and the approved Gillespie Farm ODP.
There was no evidence introduced at the hearing to contradict the Staff Report;
therefore, the Hearing Officer finds that the Subdivision is in conformance with
the applicable requirements found in Article 4 of the Land Use Code.
Maple Hill, 3fd Replat
Administrative Hearing
Findings, Conclusions, and Decision
September 10, 2007
Page 2 of 4
NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established
no controversy or facts to refute that the hearing was
properly posted, legal notices mailed and notice
published.
The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the
hearing at approximately 4:30 PM on September 10, 2007 in Conference Room A at
281 N. College Avenue, Fort Collins, Colorado.
HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE:
The Hearing Officer accepted during the hearing the following evidence: (1) Planning
Department Staff Report; (2) application, plans, maps and other supporting documents
submitted by the applicant and the applicant's representatives to the City of Fort Collins;
and (3) a tape recording of testimony provided during the hearing. The LUC, the City's
Comprehensive Plan (City Plan), and the formally promulgated policies of the City are
all considered part of the evidence considered by the Hearing Officer.
The following is a list of those who attended the meeting:
From the City:
Shelby Sommer, Associate Planner
From the Applicant:
Mark Foster
Larry Buckendorf
From the Public:
None.
Written Comments:
None:
City of Fort Collins
Plannii. Development and Transportati Services
Planning and Zoning
CITY OF FORT COLLINS
ADMINISTRATIVE HEARING OFFICER
TYPE I ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS AND DECISION
ADMINISTRATIVE HEARING DATE
PROJECT NAME:
CASE NUMBER:
OWNER/APPLICANT:
HEARING OFFICER:
PROJECT DESCRIPTION:
September 10, 2007
Maple Hill, Third Replat PDP
#29-00 K
Maple Hill Investments
c/o Mark Foster
7251 W. 201h St, #C-200
Greeley, CO 80634
Cameron Gloss
Planning and Zoning Director
The Applicant has submitted a request to replat a portion of the Maple Hill Subdivision
which is generally located at the southeast corner of Richards Lake Road and Turnberry
Road.
The purpose of the replat is to accommodate an existing irrigation well. The replat
includes Lots 5 and 6 and Block 2, and Tract C of the Maple Hill Subdivision. Lots 5
and 6 are proposed to be moved approximately 30 feet to the west, and which results in
Tract C being reconfigured to accommodate the existing well. There are no new
buildings or lots associated with the replat, and the square footage of the lots and tract
will remain the same.
SUMMARY OF HEARING OFFICER DECISION: Approval
ZONING DISTRICT: Low Density Mixed Use Neighborhood- L-M-N.
STAFF RECOMMENDATION: Approval