HomeMy WebLinkAboutMAPLE HILL RECREATION CENTER - PDP - 29-00J - DECISION - FINDINGS, CONCLUSIONS & DECISIONcf/Gjv l""A J'Ae5:- 'T
Pe_� ivy %JE�9.G/N 6
S1 eze4,a✓ v�lot✓r�7� lee[. re 4pd.,vPY
Pa' S7T; � 4 7� 1
Maple Hill Recreation Center, end Replat
Administrative Hearing
Findings, Conclusions, and Decision
December 17, 2004
Page 6 of 6
DECISION
The Maple Hill Recreation Center, Second Replat Project Development Plan, #29-OOJ,
is hereby approved by the Hearing Officer subject to the following condition:
At the time of the filing for a Final Plan on the Maple Hill Recreation Center, Second
Replat Project Development Plan, the applicant shall provide within the Neighborhood
Center, in addition to the outdoor spaces described in Section 4.4 (D)(3)(e), two (2) or
more of the following uses: mixed use dwelling units; community facilities; neighborhood
support/recreation facilities; schools; child care centers; places of worship or assembly;
convenience retail stores; offices; financial services and clinics; personal or business
service shops; standard or fast food restaurants (without drive-in or drive -through
facilities); small animal veterinary clinics; and artisan or photography studios or
galleries.
Dated this 30th day of December 2004, per authority granted by Sections
1.4.9(E) and 2.1 of the Land Use Code.
j'
Cameron Gloss
Current Planning Director
Maple Hill Recreation Center, end Replat
Administrative Hearing
Findings, Conclusions, and Decision
December 17, 2004
Page 5 of 6
center. The neighborhood center is integrated with the surrounding residential
area is readily accessible by streets and sidewalks. As mentioned, outdoor
spaces are provided in the form of a park and pavilion.
3. Compliance with Article 3 of the Land Use Code — General Development
Standards
A. Section 3.3.1 [B] — Lots
The proposed lots comply with the design standards in that each lot and tract has
vehicular access to a public street, and the side lot lines are at substantially right
angles or radial to the street. The design does not impact the layout of roads,
driveways, utilities, drainage facilities and other services necessary to serve the
Project.
B. Section 3.3.1 [C] (1) - Public Sites, Reservations, and Dedications
The plat indicates the proper dedication for drainage and utility easements as
needed to serve the Project.
SUMMARY OF CONCLUSIONS
A. The Maple Hill Recreation Center, 2"d Replat, Project Development Plan is
subject to administrative review and the requirements of the Land Use Code
(LUC).
B. Maple Hill Recreation Center, 2"d Replat, Project Development Plan complies
with the Mountain Vista Subarea Plan.
C. The Maple Hill Recreation Center, 2"d Replat, Project Development Plan is
consistent with the Gillespie Farm Overall Development Plan.
D. The Maple Hill Recreation Center, 2"d Replat, Project Development Plan
satisfies the development standards of the LMN zoning district except for the
required number of land uses contained within a Neighborhood Center as
identified under Section 4.4(D)(3)(c). A non-residential or mixed use unit must
be added to the proposed Neighborhood Center in order for the Project
Development Plan to be found compliant.
E. Maple Hill Recreation Center, 2"d Replat, Project Development Plan complies
with all applicable General Development Standards, including the Plat Standards,
contained in Article 3 of the Land Use Code.
Maple Hill Recreation Center, /nd Replat
Administrative Hearing
Findings, Conclusions, and Decision
December 17, 2004
Page 4 of 6
Testimony was offered at the hearing by one neighboring residential landowner.
This owner, speaking as a representative to the adjacent Country Club Heights
subdivision, submitted a letter into the record that summarized the
neighborhood's specific comments as they relate to the larger Maple Hill
development, including concerns raised in a previous letter dated August 17,
2004. In his testimony and within the letter, he expressed support for the
Recreation Center, 2Id Replat, PDP application, but also reiterated the
neighborhood's previously stated concerns about the land use transition in
density between existing low density development to the west.
The Neighborhood Letter also specifically requested that the Maple Hill
Subdivision construct the frontage road in a timely manner in order to address
existing and anticipated future traffic impacts.
The Hearing Officer understands the neighboring property owners' desire for the
ultimate improvements to Turnberry Road to be completed as soon as possible;
however, the proposed recreation center facility and replat must be judged under
the existing applicable regulations of the City of Fort Collins Land Use Code.
There is no authority for the Hearing Officer to mandate that the Applicant
exceed the requirements based on the applicable standards.
2. Compliance with Article 4 and the LMN Zoning District Standards:
A. Section 4.4(D) — Land Use Standards
There was no evidence introduced at the hearing to contradict the Staff Report;
however, the Hearing Officer finds that the PDP is not in conformance with the all
applicable requirements found in Article 4 of the Land Use Code. Only one non-
residential use, a recreation center and pool, is provided within the Neighborhood
Center where a minimum of two or more non-residential or mixed -uses is
required.
The applicant has proposed construction of a freestanding 400 square foot park
pavilion located on the abutting future multi -family parcel as a way to satisfy the
required second use. While the pavilion is an amenity benefiting neighborhood
residents and the general public, it is listed separately as a "publicly accessible
outdoor space" under Section 4.4(D)(3)(e) and helps to directly fulfill the outdoor
space requirements outlined in this section. The pavilion use cannot be used to
meet the Neighborhood Center land use requirements.
All other land use standards of this section are met. At least 90% of dwelling
units within Maple Hill are within'/4 of a mile of the proposed neighborhood
Maple Hill Recreation Center, tnd Replat
Administrative Hearing
Findings, Conclusions, and Decision
December 17, 2004
Page 3 of 6
Written Comments:
Letter from Joseph W. Bleicher to Cameron Gloss dated December 17, 2004
FACTS AND FINDINGS
1. Site Context
The surrounding zoning and land uses are as follows:
N: L-M-N; Vacant (Lind Property -Under Development by Centex Homes)
S: L-M-N; Vacant (Poudre School District Future School Site)
E: L-M-N; Vacant (Irrigated Agriculture)
W: R; Existing Single Family Detached in Unincorporated Larimer County
The Maple Hill project is part of a larger 320-acre parcel that was annexed in
1978. Also in 1978, on the Maple Hill parcel, the Nineteenth Green Subdivision
was approved consisting of 58 single family lots on 28.9 acres. Although this
subdivision was approved and recorded, it expired due to lack of activity in the
mid-1980's.
The parcel is located within the Mountain Vista Area Plan adopted by City
Council in March of 1999. The 160-acre Gillespie Farm Overall Development
Plan was approved in February of 2001 and amended in October of 2002.
The original Maple Hill subdivision was approved on September 9, 2003. This
approved project was the first and largest phase of a residential subdivision that
is located on 136.89 acres at the southeast corner of Turnberry Road and
Richards Lake Road.
The original approved plan included 449 single family detached dwelling units
and 78 duplex dwelling units for a total of 527 dwelling units. The project set
aside 7.16 acres for a neighborhood park that will be developed by the City of
Fort Collins at some point in the future. An off-street bicycle/pedestrian path is
provided.
A future phase includes multi -family on 16.90 acres.
On August 31, 2004, the Hearing Officer approved Maple Hill First Replat. This
amendment to the original plan resulted in replatting five blocks and adjusting the
mix of housing types. The replat also resulted in an increase of 10 single family
lots and a decrease in seven duplex lots for an overall net gain of three lots. This
increased the total number of units from 527 to 530.
Maple Hill Recreation Center, end Replat
Administrative Hearing
Findings, Conclusions, and Decision
December 17, 2004
Page 2 of 6
STAFF RECOMMENDATION: Conditional Approval
NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established
no controversy or facts to refute that the hearing was
properly posted, legal notices mailed and notice
published.
PUBLIC HEARING
The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the
hearing at approximately 3:00 PM on December 17, 2004 in Conference Room A at 281
N. College Avenue, Fort Collins, Colorado.
HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE:
The Hearing Officer accepted during the hearing the following evidence: (1) Planning
Department Staff Report; (2) application, plans, maps and other supporting documents
submitted by the applicant and the applicant's representatives to the City of Fort Collins;
and (3) a tape recording of testimony provided during the hearing. The LUC, the City's
Comprehensive Plan (City Plan), and the formally promulgated policies of the City are
all considered part of the evidence considered by the Hearing Officer.
The following is a list of those who attended the meeting:
From the City:
Ted Shepard, Chief Planner
Katie Moore, Development Review Engineer
From the Applicant:
Mike Sollenberger
Stephani Christova, VF Ripley Associates
From the Public:
Joseph W. Bleicher, 2509 Turnberry Road
Kirvin Knox, 2505 Turnberry Road
City of Fort Collins
Commu-_ cy Planning and Environmental _cervices
Current Planning
CITY OF FORT COLLINS
ADMINISTRATIVE HEARING OFFICER
TYPE I ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS AND DECISION
ADMINISTRATIVE HEARING DATE
PROJECT NAME:
CASE NUMBER:
I_1J»[y_1►116
OWNER:
HEARING OFFICER:
PROJECT DESCRIPTION:
December 17, 2004
Maple Hill Recreation Center, Second
Replat PDP
#29-OOJ
Mr. Michael Sollenberger and Mr.
Thomas Dougherty
c/o VF Ripley Associates
401 W. Mountain Ave., Suite 201
Fort Collins, CO 80521
Mr. Michael Sollenberger and Mr.
Thomas Dougherty
220 East Mulberry Street
Fort Collins, CO 80525
Cameron Gloss
Current Planning Director
The Applicant has submitted a request to build a clubhouse and pool serving as a
Neighborhood Center for the Maple Hill development. The recreation center will be
located on one acre at the northwest corner of Maple Hill Drive and Bar Harbor Drive.
The one-story clubhouse would contain 1,650 square feet. The swimming pool would
measure 42 feet by 75 feet. The pool area would be secured with perimeter fencing.
The request includes a replat of Tract W and Lot 1 of Block 32 of Maple Hill Subdivision.
SUMMARY OF HEARING OFFICER DECISION: Conditional Approval
ZONING DISTRICT: Low Density Mixed Use Neighborhood- L-M-N.
281 North College Avenue • PC. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6750 • FAX (970) 416-2020