HomeMy WebLinkAboutMAPLE HILL RECREATION CENTER - PDP - 29-00J - REPORTS - RECOMMENDATION/REPORT W/ATTACHMENTSJoe Bleicher
2509 Turnberry Road
Fort Collins, CO 80524
Jan Spruill
2305 Turnberry Road
Fort Collins, CO 80524
Gary and Margie Boyack
2109 Turnberry Road
Fort Collins, CO 80524
Steve and Cindy Stansfield
2413 Turnberry Road
Fort Collins, CO 80524
Joe Coyte
2309 Turnberry Road
Fort Collins, CO 80524
Mac Danford
2301 Turnberry Road
Fort Collins, CO 80524
Joe Bunton
2601 Turnberry Road
Fort Collins, CO 80524
Kirvin Knox
2505 Turnberry Road
Fort Collins, CO 80524
C.K. Bixler
2609 Turnberry Road
Fort Collins, CO 80524
Page 2
that neighborhood input is an essential part of the City's review process. Our
neighborhood needs to be informed of proposed changes not only affecting Maple Hill
but those involving KB Homes directly to our north, Centex Homes to our northeast,
and other future developments which will affect the traffic flow along our homes.
We still strongly believe that all of the concerns which were raised in our enclosed
letter of August 17, 2004, remain valid, especially those that related to our frontage
road. Centex Homes has since constructed roads, built a 6-foot high privacy fence
parallel to Turnberry Road, and started actual home construction. Maple Hill has since
constructed roads that exit perpendicular to our homes onto Turnberry Road. The
concerns we have raised in the past, such as lights from exiting vehicles shining into our
homes, will soon become real problems that must be mitigated. As we experience
more of the adverse effects on quality of life, safety, and home values that result from
the greatly increased traffic from development, it becomes even more essential to make
meaningful progress in achieving a timely implementation of our frontage road.
We appreciate the opportunity to review and comment on this project and ask that this
letter be made a part of the hearing file. In the coming year, it is our fervent hope that
we can successfully work with the City, the developers, and other parties to promptly
achieve a timely, reasonable, and equitable plan to resolve our ongoing concerns on our
frontage road and related issues. Please contact me if I can provide any assistance.
Sincerely,
Joseph W. Bleicher
For Homeowners in the Country Club Heights Subdivision
Enclosure: Neighborhood Letter of August 17, 2004, on Maple Hill, PDP #29-OOH
cc: Mayor Ray Martinez
Mayor Pro Tern Bill Bertschy
Council Member Eric Hamrick
Council Member Kurt Kastein
Council Member Marty Tharp
Council Member David Roy
Council Member Karen Weitkunat
Commissioner Kathay Rennels
Commissioner Tom Bender
Commissioner Glenn Gibson
,/Mr. Ted Shepard
Mr. Brad Lenz
AAW, 5*" puNd
Joseph W. Bleicher
2509 Turnberry Road
Fort Collins, CO 80524
Phone (970) 407-0531
December 17, 2004
Mr. Cameron Gloss
Planning Director
City of Fort Collins
281 North College Avenue
Fort Collins, CO 80522
Dear Mr. Gloss:
p rt LA
9E�
Our neighborhood, the Country Club Heights Subdivision, appreciates the opportunity
to provide written comments on the Maple Hill Recreation Center and Second Replat,
#29-00J, a project to build a clubhouse and pool for the Maple Hill neighborhood.
We continue to have very strong concerns with the adverse effects of ongoing and
future developments on our neighborhood integrity, quality of life, safety, and home
values. In our earlier letter of August 17, 2004, on the Amended First Replat, we
clearly stated that it was a major concern for us since these homes would be directly
across from our existing homes and would be highly visible. Despite our strong
opposition, this replat was approved on August 31, 2004, by the Hearing Officer and it
will result in smaller lot sizes and smaller duplexes which would be even less
compatible with our existing large homes on 150 foot wide lots with large spacing
between the homes.
In this final decision, the Hearing Officer determined that the land use transition
standard of the Land Use Code can be met "...if the landscape treatment within Tracts
abutting Turnberry Road can provide a visual transition to development to the west.
This would require landscape materials of sufficient variety, number, and size and
within the appropriate location to create an attractive streetscape in keeping with the
character of the surrounding area."... "Planning staff will review plans during the Final
Plan process to assure that the type and size of the plant materials sufficiently buffer
proposed development from Tumberry Road and abutting properties to the west." Our
neighborhood would certainly appreciate the opportunity to participate in this review.
Regarding the specific request to build a clubhouse and pool for the Maple Hill
neighborhood, we do not have any opposition to the proposed scope and location of
the project. This is based both on the distance that the project is away from our home
and the plans of the City, as discussed above to ensure that landscaping plans will
buffer our homes from the development. We would like to again state that we believe
of these City Plan Priciples and Policies which tailor City Plan's city-wide perspective
to individual neighborhood, districts, corridors, edges.
Policy ENV-3.3 Water Demand Management Policy.
The landscape plan for the project will utilize the following xeriscape principles:
Plant material with a low to moderate water requirements
Limited turf areas
Effective use of soil amendments
An efficient irrigation system
Appropriate maintenance
PRINCIPLE AN-1: New neighborhoods will be integral parts of the broader
community structure.
Policy AN —1.1 Relationships to Residential Districts.
Policy AN —1.2 Street Network.
Policy an —1.6 Pedestrian Network.
The overall project provides well-connected street, bicycle and pedestrian trails and
sidewalks within the site and vehicular and pedestrian connections to adjacent properties.
Principle AN-2. A wide variety of open lands, such as small parks, squares, greens,
Play fields, natural areas, gardens, greenways, and other outdoor spaces should be
integrated into the neighborhoods.
Policy AN —2.1 Neighborhood Parks and Outdoor Spaces.
Policy AN- 2.2 Ownership of Outdoor Spaces.
The proposed neighborhood center will be accessible from streets, the bike trail and
pedestrian walks within the site and adjacent developments. A Homeowner's Association
will maintain the neighborhood center.
PRINCIPLE LMN — 2: The size, layout and design of a Low Density Mixed — Use
Neighborhood should make it conductive to walking, with all the dwellings sharing the
street and sidewalk system and a neighborhood center.
The proposed neighborhood center is located so it will be accessible within the development.
Thank you for your consideration and we look forward to working with you during the
development review process.
Best Regards,
Stefani Christova
VF Ripley Associates
October 26, 2004
Mr. Ted Shepard
Fort Collins Planning Department
281 North College Avenue
Fort Collins, CO 80524
RE: Statement of Planning Objectives for Maple Recreation Center
Preliminary Development Plan
Dear Mr. Shepard,
The Neighborhood Center is a part of a 160- acre property located at the southeast corner of
County Road 11 and County Road 52.
The neighborhood center will have a recreation complex plus one other use allowed as part
of the neighborhood center in the LMN District. The trail, adjacent to the project site, will
cross the overall site in a diagonal direction from the northwest corner to the southeast and
will include bike / pedestrian ways. The trail will relate to the trail alignment as identified in
the Mountain Vista Subarea Plan.
No known natural areas, habitats and features are within the overall development boundaries
have been identified from the Natural Habitats and Features Inventory Map.
Mountain Vista Subarea Plan Principles and Policies achieved by the proposed plan
include:
A. Land Use
PRINCIPLE MV-LU-1: The Mountain Vista Subarea will have a balance of residential,
commercial, and civic facilities.
The project will be a part of a low -density mixed -use development with single family and
multi -family homes. The proposed neighborhood center will provide community facilities
within the neighborhood.
B. Transportation
Policy MV-T-2.6: Bike routes and pedestrian connections will be developed to link the
subarea to the Downtown and Poudre River Trail. These facilities will make logical and
coordinated connections to the comprehensive city-wide bicycle, pedestrian, and transit
systems.
Bike / pedestrian trail will cross diagonally across the overall site, adjacent to the
Neighborhood Center. The trail is consistent with the Mountain Vista Subarea Parks Master
Plan and will connect with trial systems outside of the project site.
City Plan Principles and Policies achieved by the proposed plan include:
PRINCIPLE LU-4: More specific subarea planning efforts will follow the adoption
SITE
PROPOSED (Mountain Vista Site)
#29-OOJ Recreation Center and 2nd Replat 12/3/04 N
Type I (LUC)
1 inch : 600 feet
4. Findings of Fact:
In evaluating the request for Maple Hill Recreation Center and Second Replat,
Staff makes the following findings of fact:
A. The P.D.P. continues to comply with the Mountain Vista Subarea Plan.
B. The P.D.P. continues to comply with the Gillespie Farm Amended Overall
Development Plan.
C. The P.D.P. continues to satisfy the applicable development standards of
the L-M-N zone district.
D. The P.D.P. continues to satisfy the applicable General Development
Standards of Article Three.
E. In order to ensure the second use within the neighborhood center, a
condition of approval is recommended regarding the obligation and timing
of a park pavilion.
RECOMMENDATION: Staff recommends approval of Maple Hill Recreation
Center and Second Replat P.D.P., #29-OOJ, subject to the following condition:
At the time of the filing for a Final Plan on the Maple Hill
Recreation Center, the applicant shall file a Minor Amendment
to the Gillespie Farm Amended Overall Development Plan.
This amendment shall indicate a park pavilion, minimum of
400 square feet, to be located on the multi -family parcel,
abutting the regional bicycle trail and, to the maximum extent
feasible, close to the pool and clubhouse. If the multi -family
parcel is to be phased, such park pavilion shall be included in
the first phase. This Minor Amendment shall be approved
prior to, or in conjunction with, the Maple Hill Recreation
Center Final Plan.
6
A. Section 3.2.1 - Landscaping and Tree Protection
Street trees are provided for already by the overall Maple Hill Final
Compliance Plan. The clubhouse features foundation shrubs. The pool
area is generously landscaped with a mix of evergreen and deciduous
trees.
B. Section 3.2.2 — Access Circulation and Parking
There is no off-street parking as users are expected to come from the
Maple Tree neighborhood. (On -street parking will be available along the
two public streets.) Bike racks are provided. Public sidewalks are
provided along both public streets. A ten -foot wide bicycle/pedestrian trail
abuts the site and will enhance connectivity.
C. Section 3.2.4 — Site Lighting
All fixtures will be sharp cut-off and down -directional.
D. Section 3.3.1(B) — Plat Standards — General Provisions - Lots
The Second Replat creates a re -shaped lot that has the proper lot size for
the planned facilities. This new lot fronts on two public streets. Side lot
lines are at substantial right angles to street lines.
The Replat does not impact the layout of roads, driveways, utilities,
drainage facilities and other services within the larger project. The public
streets remain interconnected to the abutting subdivision to the north (Lind
Farm) and street stubs are provided to the south (Poudre School District).
E. Section 3.3.1(C) — Public Sites, Reservations and Dedications
The Second Replat continues to dedicate rights -of -way for public streets,
drainage easements and utility easements as needed to serve the area
being platted.
F. Section 3.5.1 — Building and Project Compatibility
As mentioned, the building features a residential architectural character.
There will be a six/twelve pitched roof topped by a decorative cupola. The
exterior materials and color will complement the neighborhood.
G. Section 3.5.3(B) - Relationship of Buildings to Streets and Walkways
The building is brought up to the corner of two public streets. There is a
direct connecting walkway between the entrance and the public sidewalk
along Bar Harbor Drive. Along both public streets, the building does not
exceed the 15-foot build -to line.
5
At the time of the filing for a Final Plan on the Maple Hill
Recreation Center, the applicant shall file a Minor Amendment
to the Gillespie Farm Amended Overall Development Plan.
This amendment shall indicate a park pavilion, minimum of
400 square feet, to be located on the multi -family parcel, next
to the regional bicycle trail and, to the maximum extent
feasible, close to the pool and clubhouse. If the multi -family
parcel is to be phased, such park pavilion shall be included in
the first phase. . This Minor Amendment shall be approved
prior to, or in conjunction with, the Maple Hill Recreation
Center Final Plan.
E. A neighborhood center shall be a maximum of five (5) acres in size,
excluding schools, parks and outdoor spaces as defined in subparagraph
(e) of this Section.
The neighborhood center is one acre in size.
F. The design of neighborhood centers shall be integrated with surrounding
residential areas by matching the scale of nearby residential buildings;
providing direct access from surrounding residential areas; creating usable
outdoor spaces; orienting building entrances to connecting walkways; and,
to the extent reasonably feasible, maintaining/continuing the architectural
themes or character of nearby neighborhoods.
The clubhouse is a residential -looking structure. It contains only 1,650
square feet and features a pitched roof and will match the scale of the
nearby residential buildings. The center is accessible from two public
streets and the bike trail. Usable outdoor space is provided by the pool
area. The building is oriented to the public streets.
G. A publicly accessible outdoor space such as a park, plaza, pavilion or
courtyard shall be included within or adjacent to every neighborhood
center to provide a focal point for such activities as outdoor gatherings,
neighborhood events, picnicking, sitting and passive and active recreation.
A seven acre future public park is located directly across the street from
the neighborhood center.
3. Compliance with General Development Standards:
The First Replat complies with the following applicable General
Development Standards:
4
A. At least 90% of the dwellings in projects greater than 40 acres shall be
located within 3,960 feet (314 of a mile) of either a neighborhood center
contained within the project, as measured along street frontage, and
without crossing an arterial.
A neighborhood center is planned for the northwest corner of Maple Hill
Road and Bar Harbor Drive indicated on the P.D.P. as Block 32, Lot 1.
The most remote lot from this center is Block 21, Lot 1, which is located in
the extreme southeast corner of the P.D.P. which is 2,400 feet from the
center as measured along public streets. Therefore, 100% of the lots are
within 3/4 of a mile of the future neighborhood center.
B. A neighborhood center shall be planned as an integral part of surrounding
residential development and located where the network of local streets
provides direct access to the center.
The neighborhood center has been planned as part of Maple Hill P.D.P.
and is bounded on two sides by public streets and served by the
bicycle/pedestrian path along its entire western boundary.
C. Neighborhood centers with retail uses or restaurants located on arterial
streets shall be spaced at least three thousand nine hundred sixty (3,960)
feet (three-quarters j%j mile) apart.
The neighborhood center does not contain retail or restaurant uses. In
any event, the neighborhood center is not located on an arterial street.
D. A neighborhood center shall include two (2) or more of the following uses:
mixed -use dwelling units; community facilities; neighborhood
support/recreation facilities; schools; child care centers; places of worship
or assembly; convenience retail stores; offices, financial services and
clinics; personal or business service shops; standard or fast food
restaurants; small animal veterinary clinics; and artisan or photography
studios or galleries. No drive-in facilities shall be permitted.
The center contains a neighborhood support/recreation facility consisting
of the clubhouse and pool.
The second use is a community facility, consisting of a 400 square foot
park pavilion (picnic shelter) to be located on the future multi -family parcel.
This parcel borders the clubhouse/pool on the west and north. This
pavilion will be open to the general public, not just pool association
members. The location next to the regional bicycle trail will provide shade
and respite for trail users. Further, by being located adjacent to the pool,
the pavilion can double as a picnic shelter for pool parties. In order to
obligate the construction of this community facility to the multi -family
development, the following condition of approval is recommended:
3
COMMENTS:
Background:
The surrounding zoning and land uses are as follows:
N: L-M-N; Vacant (Lind Property -Under Development by Centex Homes)
S: L-M-N; Vacant (Poudre School District Future School Site)
E: L-M-N; Vacant (Irrigated Agriculture)
W: R; Existing Single Family Detached in Unincorporated Larimer County
The Maple Hill project is part of a larger 320-acre parcel that was annexed in
1978. Also in 1978, on the Maple Hill parcel, the Nineteenth Green Subdivision
was approved consisting of 58 single family lots on 28.9 acres. Although this
subdivision was approved and recorded, it expired due to lack of activity in the
mid-1980's.
The parcel is located within the Mountain Vista Area Plan adopted by City
Council in March of 1999. The 160-acre Gillespie Farm Overall Development
Plan was approved in February of 2001 and amended in October of 2002.
The original Maple Hill subdivision was approved on September 9, 2003. This
approved project was the first and largest phase of a residential subdivision that
is located on 136.89 acres at the southeast corner of County Road 11 (soon to
re -named Turnberry Road) and Richards Lake Road.
The original approved plan included 449 single family detached dwelling units
and 78 duplex dwelling units for a total of 527 dwelling units. The project set
aside 7.16 acres for a neighborhood park that will be developed by the City of
Fort Collins at some point in the future. An off-street bicycle/pedestrian path is
provided.
A future phase includes multi -family on 16.90 acres.
On August 31, 2004, the Hearing Officer approved Maple Hill First Replat. This
amendment to the original plan resulted in replatting five blocks and adjusting the
mix of housing types. The replat also resulted in an increase of 10 single family
lots and a decrease in seven duplex lots for an overall net gain of three lots. This
increased the total number of units from 527 to 530.
2. Compliance with L-M-N Standards:
There are seven specific standards relating to neighborhood centers in the L-M-N
zone. All but two of these were able to be satisfied with the overall Final
Compliance Plan while two need to be reviewed with this P.D.P. For a
comprehensive analysis, all seven are reviewed in this subsection.
0A
ITEM NO.
MEETING DATE -/ i-Oy
STAFF jeD
Citv of Fort Collins HEARING OFFICER
STAFF REPORT
PROJECT: Maple Hill Recreation Center, Second Replat, PDP, #29-OOJ
APPLICANT: Mr. Michael Sollenberger and Mr. Thomas Dougherty
c/o V-F Ripley
401 W. Mountain Avenue, Suite 201
Fort Collins, CO 80521
OWNER: Mr. Michael Sollenberger and Mr. Thomas Dougherty
220 East Mulberry Street
Fort Collins, CO 80524
PROJECT DESCRIPTION:
This is a request to build a clubhouse and pool for the Maple Hill neighborhood.
The recreation center will be located on one acre at the northwest corner of
Maple Hill Drive and Bar Harbor Drive. The one-story clubhouse would contain
1,650 square feet. The swimming pool would measure 42 feet by 75 feet. The
pool area would be secured with perimeter fencing. The request includes a
replat of Tract W and Lot 1 of Block 32 of Maple Hill Subdivision. The parcel is
zoned L-M-N, Low Density Mixed -Use Neighborhood.
RECOMMENDATION: Approval With Conditions
EXECUTIVE SUMMARY:
The P.D.P. continues to comply with the Mountain Vista Subarea Plan and the
Gillespie Farm Amended Overall Development Plan. The P.D.P. continues to
satisfy the applicable development standards of the L-M-N zone district and the
applicable General Development Standards of Article Three. The
recommendation of conditions with approval pertains to the timely filing of a
Minor Amendment to the O.D.P., and indicating on a subsequent P.D.P. the
location and design of a park pavilion on the future multi -family parcel.
COMMUNITY PLANNING AND ENVIRONMENTAL SERVICES 281 N. College Ave. PO. Box 580 Fort Collins, CO 80522-0580 (970) 221-6750
PLANNING DEPARTMENT