Loading...
HomeMy WebLinkAboutTHE GREEN SOLUTION - PDP/FDP - FDP150045 - REPORTS - RECOMMENDATION/REPORTStaff Report —The Green Solution, FDP150045 Administrative Hearing 03-16-16 Page 8 ATTACHMENTS: 1. Zoning & Site Vicinity Map 2. Applicant's Statement of Planning Objectives 3. Planning Document Set (Site Plan, Landscape Plan, Elevations, Lighting Plan, Subdivision Plat) 4. Utility Plan 5. Shared driveway easement Staff Report —The Green Solution, FDP150045 Administrative Hearing 03-16-16 Page 7 The planned rear building has further been articulated through the use of projecting brick pilaster elements and trellises with climbing vines to create building bays of human -scaled proportions. H. Section 3.5.1(E) — Building Materials Materials for the building will be comprised primarily of brick and stucco, matching materials used on other nearby structures. The new building addition will utilize the same brick color and pattern already utilized on the front of the building to create consistency in design. Section 3.5.3(C)(2) — Orientation to Build -to Lines for Streetfront Buildings As part of the redevelopment of the site, the existing asphalt vehicle use area between the front of the building will be torn out and replaced with landscaping, meeting standards that do not permit vehicle use areas between buildings and the street. For the construction of a new building, build -to line standards would also require the building to be located at least 10 and no more than 25-feet from the front property line. The existing building is located further than this 25-foot requirement, but as described in the code section concerning redevelopment of existing buildings, there is no reasonably feasible means to achieve this element of the build -to line standard. 4. Findings of Fact/Conclusion: In evaluating the request for The Green Solution consolidated Project Development Plan/Final Plan, FDP150045, Staff makes the following finds of fact: A. The consolidated Project Development Plan/Final Plan complies with the applicable procedural and administrative requirements of Article 2 of the Land Use Code. B. The consolidated Project Development Plan/Final Plan complies with relevant standards located in Article 3 — General Development Standards. C. The consolidated Project Development Plan/Final Plan complies with relevant standards located in Division 4.22 Service Commercial District (C-S) of Article 4 — Districts. RECOMMENDATION: Staff recommends approval of The Green Solution, FDP150045 Staff Report — The Green Solution, FDP150045 Administrative Hearing 03-16-16 Page 6 C. Section 3.2.2(K) — Parking Lots — Required Number of Off -Street Spaces As part of the proposed redevelopment, onsite parking will be altered to meet current code standards. Although the location of the parking along the north property will not change, the number and orientation of parking will be modified. The current parking configuration features 13 diagonal spaces that do not meet standards for width and depth. After the proposed improvements, 10 wider, perpendicular spaces will remain with associated landscape islands, curb, walkways, and handicap spaces. Minimum parking requirements for general retail are calculated based on two spaces for every 1,000 square feet of floor area. For the proposed 4,800 square foot building, a minimum of 10 vehicle spaces are required, and 10 spaces are proposed. D. Section 3.2.2(J) — Setbacks The reconfigured parking area has been pushed further east of North College Avenue to meet minimum setback requirements for vehicle use areas along an arterial street of 15-feet. E. Section 3.2.4 — Site Lighting New building lighting will provide security illumination for building surrounds and the parking area. All light fixtures will comply with Land Use Code standards and will be fully shielded and down -directional. Light sources will use a lower color temperature range to reduce the perceived harshness of some types of LED lighting. F. Section 3.2.5 — Trash and Recycling Enclosures The proposed redevelopment will construct a new trash and recycling enclosure along the rear (east) property line. The enclosure is consistent with Land Use Code requirements and will be built on a concrete pad with separate walk-in access without the need to open the main gates. G. Section 3.5.1(C) - Building Size, Height, Bulk, Mass, Scale The existing building and new addition will be similar in size, height, bulk, mass, and scale to its surroundings. Within the immediate context are other one-story buildings of similar height and scale. Staff Report —The Green Solution, FDP150045 Administrative Hearing 03-16-16 Page 5 3.2.1(D)(2) — Street Trees Canopy shade street trees were previously installed along the College Avenue frontage as part of a capital improvement project along College Avenue in 2014. 3.2.1(E)(2) —Landscape Area Treatment The proposal includes new landscaping areas to meet current Land Use Code requirements. A large area of asphalt located between the building and College Avenue will be removed and planted with turf, trees, and various shrubs. Foundation plantings will also be provided along the new building addition's north -facing elevation. 3.2.1(E)(4) — Parking Lot Interior Landscaping New landscape islands will define the beginning and end of the reconfigured parking aisle with planted shrubs and trees. The new islands meet Land Use Code requirements that 6% of the parking lot interior be landscaped. 3.2.1(E)(5) — Parking Lot Perimeter Landscaping The parking area for the project will remain abutting the north property line and features no perimeter screening, consistent with the lack of setbacks as described in Land Use Code Section 3.2.2(J) for buildings and uses with collective parking. Parking is accessed from a shared private driveway providing parking access to three businesses: 810 N College Avenue (The Green Solution), 814 N College Ave (Poudre Liquors), and 830 N College Ave (Chippers Lanes). Attachment 5 includes the original right-of-way and easement language describing access for this property. B. Section 3.2.2(C)(4) — Bicycle Facilities The development will add four new protected bicycle parking spaces near the front entrance under a building canopy. The new bike parking spaces meet the four bicycle parking spaces required by the Land Use Code for a retail establishment. Staff Report — The Green Solution, FDP150045 Administrative Hearing 03-16-16 Page 4 2. Compliance with Article 4 of the Land Use Code — Service Commercial (C-S), Division 4.22: The project complies with all applicable Article 4 standards as follows: A. Section 4.22(8) — Permitted Uses Retail marijuana stores are a permitted use in the Service Commercial zone district. subject to Basic Development Review. This development is being processed as an Administrative (Type 1) review, as the development application was submitted prior to Land Use Code changes made in December 2015 altering the review process for retail marijuana stores from Administrative (Type 1) review to Basic Development Review in the Service Commercial district. 8 Section 4.22(D) — Land Use Standards The maximum building height in the C-S district is 3-stories. The existing building and new addition are 1-story in height and comply with this zone district requirement. 3. Compliance with Article 3 of the Land Use Code — General Development Standards: The project complies with all applicable General Development Standards as detailed below. A. Section 3.2.1 — Landscaping and Tree Protection The proposed landscaping plan is consistent with the applicable requirements of Land Use Code Division 3.2.1, Landscaping and Tree Protection, with additional explanation for specific subsections below: 3.2.1(D) — Tree Planting Standards Seven new trees will be planted onsite to meet tree stocking standards. The new trees will be positioned in a front -yard area and within new islands defining the reconfigured parking area. The new trees meet standards for size, quantity, and minimum species diversity. One tree has been upsized to serve as mitigation for the removal of an existing Box Elder on the south side of the property. Staff Report —The Green Solution, FDP150045 Administrative Hearing 03-16-16 Page 3 Map: The Green Solution Site & Zoning Vicinity Map 1 inch = 300 feet The Green Solution Staff Report — The Green Solution, FDP150045 Administrative Hearing 03-16-16 Page 2 • The consolidated Project Development Plan/Final Plan complies with relevant standards located in Division 4.22 Service Commercial (C-S) of Article 4 — Districts. COMMENTS: 1. Background The existing building was constructed in 1952 in Larimer County and the site was later annexed into Fort Collins as part of the North College Annexation in December 1959. The site has been utilized for a variety of retail and office -related uses and is currently occupied as a medical marijuana center. The surrounding zoning and land uses are as follows: Direction Zone District Existing Land Uses North Service Commercial (C-S) Indoor Recreation & Retail South Service Commercial (C-S) Vehicle Sales & Retail East Service Commercial (C-S), Community Commercial — North College (C-C-N) Retail, Single -Family Homes West Service Commercial (C-S), Public Open Lands(P-O-L) Retail, Restaurant, Natural Area A zoning vicinity map is presented on the following page: ;arof t Collins PROJECT: ITEM NO 1 MEETING DATE STAFF March 16, 2016 Ryan Mounce ADMINISTRATIVE HEARING OFFICER The Green Solution, FDP150045 APPLICANT: Kyle Speidell The Green Solution, LLC 700 17"' Street, Suite 2200 Denver, CO 80202 OWNERS: Joe Dice & Ryan Null The Grow Shop LLC PO Box 1428 Fort Collins, CO 80522 PROJECT DESCRIPTION: This is a request for consideration of a consolidated Project Development Plan/Final Plan to convert an existing medical marijuana center to a retail marijuana store. In addition, the site will be platted and the rear portion of the existing 2,330 square foot building will be demolished to construct a 2,470 square foot addition. In total, the 1-story building will be approximately 4,800 square feet in size. The project site is located at 810 North College Avenue on a .31-acre lot in the Service Commercial (C-S) zone district. RECOMMENDATION: Staff recommends approval of The Green Solution, consolidated Project Development Plan/Final Plan, FDP150045. EXECUTIVE SUMMARY: Staff finds the proposed The Green Solution consolidated Project Development Plan/Final Plan complies with all applicable requirements of the City of Fort Collins Land Use Code (LUC), more specifically: • The consolidated Project Development Plan/Final Plan complies with process located in Division 2.2 — Common Development Review Procedures for Development Applications of Article 2 — Administration. • The consolidated Project Development Plan/Final Plan complies with relevant standards of Article 3 — General Development Standards. Planning Services 281 N College Ave — PO Box 580 — Fort Collins, CO 80522-0580 fcgov.com/developmentreview/ 970.221.6750