HomeMy WebLinkAboutTHE GREEN SOLUTION - PDP/FDP - FDP150045 - REPORTS - RECOMMENDATION/REPORTStaff Report —The Green Solution, FDP150045
Administrative Hearing 03-16-16
Page 8
ATTACHMENTS:
1. Zoning & Site Vicinity Map
2. Applicant's Statement of Planning Objectives
3. Planning Document Set (Site Plan, Landscape Plan, Elevations, Lighting Plan,
Subdivision Plat)
4. Utility Plan
5. Shared driveway easement
Staff Report —The Green Solution, FDP150045
Administrative Hearing 03-16-16
Page 7
The planned rear building has further been articulated through the use of
projecting brick pilaster elements and trellises with climbing vines to create
building bays of human -scaled proportions.
H. Section 3.5.1(E) — Building Materials
Materials for the building will be comprised primarily of brick and stucco,
matching materials used on other nearby structures. The new building
addition will utilize the same brick color and pattern already utilized on the
front of the building to create consistency in design.
Section 3.5.3(C)(2) — Orientation to Build -to Lines for Streetfront Buildings
As part of the redevelopment of the site, the existing asphalt vehicle use
area between the front of the building will be torn out and replaced with
landscaping, meeting standards that do not permit vehicle use areas
between buildings and the street.
For the construction of a new building, build -to line standards would also
require the building to be located at least 10 and no more than 25-feet
from the front property line. The existing building is located further than
this 25-foot requirement, but as described in the code section concerning
redevelopment of existing buildings, there is no reasonably feasible
means to achieve this element of the build -to line standard.
4. Findings of Fact/Conclusion:
In evaluating the request for The Green Solution consolidated Project Development
Plan/Final Plan, FDP150045, Staff makes the following finds of fact:
A. The consolidated Project Development Plan/Final Plan complies with the
applicable procedural and administrative requirements of Article 2 of the
Land Use Code.
B. The consolidated Project Development Plan/Final Plan complies with
relevant standards located in Article 3 — General Development Standards.
C. The consolidated Project Development Plan/Final Plan complies with
relevant standards located in Division 4.22 Service Commercial District
(C-S) of Article 4 — Districts.
RECOMMENDATION:
Staff recommends approval of The Green Solution, FDP150045
Staff Report — The Green Solution, FDP150045
Administrative Hearing 03-16-16
Page 6
C. Section 3.2.2(K) — Parking Lots — Required Number of Off -Street Spaces
As part of the proposed redevelopment, onsite parking will be altered to
meet current code standards. Although the location of the parking along
the north property will not change, the number and orientation of parking
will be modified.
The current parking configuration features 13 diagonal spaces that do not
meet standards for width and depth. After the proposed improvements, 10
wider, perpendicular spaces will remain with associated landscape
islands, curb, walkways, and handicap spaces.
Minimum parking requirements for general retail are calculated based on
two spaces for every 1,000 square feet of floor area. For the proposed
4,800 square foot building, a minimum of 10 vehicle spaces are required,
and 10 spaces are proposed.
D. Section 3.2.2(J) — Setbacks
The reconfigured parking area has been pushed further east of North
College Avenue to meet minimum setback requirements for vehicle use
areas along an arterial street of 15-feet.
E. Section 3.2.4 — Site Lighting
New building lighting will provide security illumination for building
surrounds and the parking area. All light fixtures will comply with Land Use
Code standards and will be fully shielded and down -directional. Light
sources will use a lower color temperature range to reduce the perceived
harshness of some types of LED lighting.
F. Section 3.2.5 — Trash and Recycling Enclosures
The proposed redevelopment will construct a new trash and recycling
enclosure along the rear (east) property line. The enclosure is consistent
with Land Use Code requirements and will be built on a concrete pad with
separate walk-in access without the need to open the main gates.
G. Section 3.5.1(C) - Building Size, Height, Bulk, Mass, Scale
The existing building and new addition will be similar in size, height, bulk,
mass, and scale to its surroundings. Within the immediate context are
other one-story buildings of similar height and scale.
Staff Report —The Green Solution, FDP150045
Administrative Hearing 03-16-16
Page 5
3.2.1(D)(2) — Street Trees
Canopy shade street trees were previously installed along the College
Avenue frontage as part of a capital improvement project along
College Avenue in 2014.
3.2.1(E)(2) —Landscape Area Treatment
The proposal includes new landscaping areas to meet current Land
Use Code requirements. A large area of asphalt located between the
building and College Avenue will be removed and planted with turf,
trees, and various shrubs. Foundation plantings will also be provided
along the new building addition's north -facing elevation.
3.2.1(E)(4) — Parking Lot Interior Landscaping
New landscape islands will define the beginning and end of the
reconfigured parking aisle with planted shrubs and trees. The new
islands meet Land Use Code requirements that 6% of the parking lot
interior be landscaped.
3.2.1(E)(5) — Parking Lot Perimeter Landscaping
The parking area for the project will remain abutting the north property
line and features no perimeter screening, consistent with the lack of
setbacks as described in Land Use Code Section 3.2.2(J) for buildings
and uses with collective parking.
Parking is accessed from a shared private driveway providing parking
access to three businesses: 810 N College Avenue (The Green
Solution), 814 N College Ave (Poudre Liquors), and 830 N College Ave
(Chippers Lanes). Attachment 5 includes the original right-of-way and
easement language describing access for this property.
B. Section 3.2.2(C)(4) — Bicycle Facilities
The development will add four new protected bicycle parking spaces near
the front entrance under a building canopy. The new bike parking spaces
meet the four bicycle parking spaces required by the Land Use Code for a
retail establishment.
Staff Report — The Green Solution, FDP150045
Administrative Hearing 03-16-16
Page 4
2. Compliance with Article 4 of the Land Use Code — Service Commercial
(C-S), Division 4.22:
The project complies with all applicable Article 4 standards as follows:
A. Section 4.22(8) — Permitted Uses
Retail marijuana stores are a permitted use in the Service Commercial
zone district. subject to Basic Development Review. This development is
being processed as an Administrative (Type 1) review, as the
development application was submitted prior to Land Use Code changes
made in December 2015 altering the review process for retail marijuana
stores from Administrative (Type 1) review to Basic Development Review
in the Service Commercial district.
8 Section 4.22(D) — Land Use Standards
The maximum building height in the C-S district is 3-stories. The existing
building and new addition are 1-story in height and comply with this zone
district requirement.
3. Compliance with Article 3 of the Land Use Code — General Development
Standards:
The project complies with all applicable General Development Standards as
detailed below.
A. Section 3.2.1 — Landscaping and Tree Protection
The proposed landscaping plan is consistent with the applicable
requirements of Land Use Code Division 3.2.1, Landscaping and Tree
Protection, with additional explanation for specific subsections below:
3.2.1(D) — Tree Planting Standards
Seven new trees will be planted onsite to meet tree stocking
standards. The new trees will be positioned in a front -yard area and
within new islands defining the reconfigured parking area.
The new trees meet standards for size, quantity, and minimum species
diversity. One tree has been upsized to serve as mitigation for the
removal of an existing Box Elder on the south side of the property.
Staff Report —The Green Solution, FDP150045
Administrative Hearing 03-16-16
Page 3
Map: The Green Solution Site & Zoning Vicinity Map
1 inch = 300 feet
The Green Solution
Staff Report — The Green Solution, FDP150045
Administrative Hearing 03-16-16
Page 2
• The consolidated Project Development Plan/Final Plan complies with relevant
standards located in Division 4.22 Service Commercial (C-S) of Article 4 —
Districts.
COMMENTS:
1. Background
The existing building was constructed in 1952 in Larimer County and the site was later
annexed into Fort Collins as part of the North College Annexation in December 1959.
The site has been utilized for a variety of retail and office -related uses and is currently
occupied as a medical marijuana center.
The surrounding zoning and land uses are as follows:
Direction
Zone District
Existing Land Uses
North
Service Commercial (C-S)
Indoor Recreation & Retail
South
Service Commercial (C-S)
Vehicle Sales & Retail
East
Service Commercial (C-S), Community
Commercial — North College (C-C-N)
Retail, Single -Family Homes
West
Service Commercial (C-S), Public Open
Lands(P-O-L)
Retail, Restaurant, Natural Area
A zoning vicinity map is presented on the following page:
;arof
t Collins
PROJECT:
ITEM NO 1
MEETING DATE
STAFF
March 16, 2016
Ryan Mounce
ADMINISTRATIVE HEARING OFFICER
The Green Solution, FDP150045
APPLICANT: Kyle Speidell
The Green Solution, LLC
700 17"' Street, Suite 2200
Denver, CO 80202
OWNERS: Joe Dice & Ryan Null
The Grow Shop LLC
PO Box 1428
Fort Collins, CO 80522
PROJECT DESCRIPTION:
This is a request for consideration of a consolidated Project Development Plan/Final
Plan to convert an existing medical marijuana center to a retail marijuana store. In
addition, the site will be platted and the rear portion of the existing 2,330 square foot
building will be demolished to construct a 2,470 square foot addition. In total, the 1-story
building will be approximately 4,800 square feet in size. The project site is located at
810 North College Avenue on a .31-acre lot in the Service Commercial (C-S) zone
district.
RECOMMENDATION: Staff recommends approval of The Green Solution, consolidated
Project Development Plan/Final Plan, FDP150045.
EXECUTIVE SUMMARY:
Staff finds the proposed The Green Solution consolidated Project Development
Plan/Final Plan complies with all applicable requirements of the City of Fort Collins Land
Use Code (LUC), more specifically:
• The consolidated Project Development Plan/Final Plan complies with process
located in Division 2.2 — Common Development Review Procedures for
Development Applications of Article 2 — Administration.
• The consolidated Project Development Plan/Final Plan complies with relevant
standards of Article 3 — General Development Standards.