Loading...
HomeMy WebLinkAboutMAPLE HILL, PHASE ONE - FDP - 29-00B - CORRESPONDENCE - (3)This is a big issue with existing residences. Plans need to be easy to read and understand so they can see exactly what is happening to their private drive and access points. There should be separate sheets detailing what happens where. Y. 5/29/03 — Maple Hill Following are my comments plus Storm water's comment. Storm Water: Drainage Report. Please provide 3 signed and stamped copies of the drainage report for approval. Erosion control: One or more previous comments have not been addressed. Please do so. If this project is to be built in phase, each phase must have a stand alone sediment/erosion control plan. Third Review: Same comments as last time delete Larimer County Street Design Standard Notes under " Grading and Erosion Control" Place City of Fort Collins standard erosion control notes on the erosion control sheets. Please provide ditch company signatures ( Baker lateral and Windsor Reservoir Company) on the plans prior to submittal of mylars. ENGINEERING COMMENTS; 1. Need to submit all costs estimates and signed right-of-way and easement dedications with Mylar submittal 2. Typical comment= many pages still have text and line weights that overlap and/or text is to small to read. 3. Page 98 / 130 - enlarge text in street cross section b. Carry sidewalk straight through without dip to curb ramp. Extend curb ramp walk to meet through walk. c. Provide better/more detail at private drive and street grades, 4. Page 98/130 same comments as page 98 .5. Same comments about private drive and the need for more detail.