Loading...
HomeMy WebLinkAboutMAPLE HILL, PHASE ONE - PDP - 29-00A - REPORTS - DRAINAGE REPORTAlternative Compliances and Variances ODP Letter from TST dated September 19, 2002 concerning the Minor Amendments to Overall Development Plan (ODP). Planning • Alternative Compliance for Solar Access, Orientation, Shading (VF Ripley Associates) The Alternative Compliance was submitted to the Current Planning Department on October 24, 2003. The request was supported by Current planning on an email dated December 23,2002. See attached copies. Two primary reasons for not being able to meet the standard are stated in the request letter. Due to the need to meet these primary requirements on the site layout the 65% solar lot standard required by the Land Use Code could not be achieved. Engineering — (As requested on the construction plans) • A variance to standard 4 (Curves with Small Deflection Angles (100 or less) of section A (Horizontal Alignment) of Section 7.4.1(Alignment) of the Larimer County Urban Area Street Standards is requested for the two horizontal center line curves between stations 16+00 and 24+00 of the proposed alignment of County Road 11. As described in a letter to Matt Baker dated 10/17/2002, the existing conditions, existing homes, prohibit a design that meets the minimum curve lengths. The curves have been designed to be the maximum possible length while still maintaining the minimum tangent length between them. • A variance to Standard 12.2.2 of the LCUASS, which states that storm sewers need a minimum of 2-feet of cover to base coarse. ST-5 and ST-513 at the intersection of Maple Hill Drive and Thoreau Drive will have stabilization fabric placed per the City of Fort Collins. A variance to Section 3.6(H), 1 & 2, of the Land Use Code, and Section 7.4 General Design Elements, Table 7-3, Access Management, which states that connecting streets to a 2-lane arterial be separated by no less than 460 feet and no more than 660 feet. The request and areas impacted are further outlined in a letter to Mike Herzig from Matthew Delich dated March 25, 2003. Stormwater — (As requested in the Drainage Report for Maple Hill) • The variance request is in regards to storm sewer pipe slope from the minimum standard of 0.4%, to a minimum pipe slope of 0.2%. Per our meeting on January 9, 2003 we have approximately 105-feet of 48" x 76" ERCP and 40-feet of 34" X 53" ERCP, Class III, storm sewer pipe located within the ROW that is designed at a 0.2% slope. In addition, we have 150' of 48" x 76" ERCP, Class III, storm sewer pipe located outside of the proposed street going into the NE corner of the detention facility that is designed at a 0.2% slope. Therefore, approximately 295- feet of storm sewer line ST-5, located on Sheet 67 of the Maple Hill construction drawings, will be at a 0.2% slope. As stated in our meeting, you felt that due to the minimal amount of lineal feet of storm sewer and due to elevation site constraints of the detention pond, you will support this variance request. MINOR AMENDMENTS AND ALTERNATIVE COMPLIANCES FOR MAPLE HILL Submitted to: CITY OF FORT COLLINS April 3, 2003