HomeMy WebLinkAboutMAPLE HILL, PHASE ONE - PDP - 29-00A - DECISION - FINDINGS, CONCLUSIONS & DECISIONCity of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Maple Hill, Phase One, Project Development Plan, #29-OOA
Administrative Hearing Date: April 10, 2003
Page 5
out of the 527 lots, or 31 %, comply with this solar orientation requirement. The
applicant has requested alternative compliance to this standard, based on the following:
■ The site street pattern was carefully laid out at the O.D.P. stage in a grid
respecting the principles of new urbanism.
■ The streets are designed to connect into the developing property to the north
(Lind Farm) and the future school site to the south (Poudre School District).
■ The street pattern frames the neighborhood park and neighborhood center.
■ The street network is designed to meet the minimum residential density
requirements.
■ The street network complies with the intersection spacing criteria with minor
arterial streets.
Pursuant to Section 3.2.3(E) of the Land Use Code, the Hearing Officer may approve an
alternative site layout if she finds that the alternative plan "accomplishes the purposes of
this Section equally or better than a plan which complies with the standards of this
Section." In making a decision on alternative compliance, the Hearing Officer "shall
take into account whether the alternative design enhances neighborhood continuity and
connectivity, fosters non -vehicular access, and preserves existing natural or
topographic conditions on the site." The Hearing Officer finds, based on staffs
recommendation and the applicant's justification, that the alternative compliance plan, to
allow. 31 % rather than 65% compliance with the solar. -oriented lots standard will
accomplish the purposes of this Section. The reduced number of solar -oriented lots
fosters non -vehicular access by virtue of on -street bike lanes along the two north -south
minor collectors. The alternative compliance plan meets the general purposes of the
Land Use Code in that it fulfills the City's transportation objectives to provide north -
south streets.
Section 3.5.2 — Housing Model Variety and Garages. The PDP also satisfies Section
3.5.2(B), concerning housing model variety, and Section 3.5.2(E) concerning garages.
As the staff report indicates, the PDP proposes three basic housing models for the
single family detached dwellings and three basic housing models for the single family
attached dwellings for a total of six. In addition, the .PDP proposes a combination of
street -facing, front -loaded street -facing, rear -loaded, and side -mounted (corner lots)
garages. As stated in the staff report, street -facing garages are appropriately recessed
LCM\57069.26\440581.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Maple Hill, Phase One, Project Development Plan, #29-OOA
Administrative Hearing Date: April 10, 2003
Page 9
■ The street pattern frames the neighborhood park and neighborhood
center.
■ The street network is . designed to meet the minimum residential
density requirements.
■ The street network 'complies with the intersection spacing criteria with
minor arterial streets.
B. The Alternative Compliance design to satisfy the minimum lot depth along
a minor arterial street, Section 3.6.2(E)(1), is found to be equal to or better
than a design that would have met the standard.
■ The total depth from front of lot to minor arterial street (C.R. 11)
exceeds the required 150 feet.
■ Behind the lots is.a buffer yard featuring sufficient plant material to
mitigate the impacts associated with the arterial street.
■ C.R. 11 is classified as a "Minor Arterial," meaning only two travel
lanes versus four travel lanes of a "Standard Arterial."
4. The Maple Hill PDP. is in compliance with the Mountain Vista Subarea Plan.
5. The PDP is in compliance with the Gillespie Farm Amended Overall
Development Plan.
DECISION
The Hearing Officer hereby approves the Maple Hill Project Development Plan,
Case No. 29-OOA
DATED THIS 24th day of April, 2003.
Lincla C. Michow, Hearing Officer
LCM\57069.26\440581.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Maple Hill, Phase One, Project Development Plan, #29-OOA
Administrative Hearing Date: April 10, 2003
Page 8
Density Mixed -Use Neighborhood." The existing zoning on the property is also Low
Density Mixed -Use Neighborhood and the Project Development Plan has been
submitted under the general parameters of this zone district.
Therefore, the Hearing Officer finds that the proposed .PDP complies with the adopted
Mountain Vista Subarea plan.
The PDP Complies with the Gillespie Farm Overall Development Plan.
The O.D.P. indicates the location of the neighborhood center, .parks/open space areas,
bicycle/pedestrian trail, stormwater detention ponds and a range of residential land uses
and densities that comply with the L-M-N zone district. In addition, a network of local
and collector streets indicates a public road system, in a grid pattern, designed to
connect to the surrounding collector and minor arterial streets that border the site. The
PDP complies with these established land uses, densities, and street system.
FINDINGS OF FACT
The PDP has satisfied the applicable provisions of Article 2 concerning
Development Applications.
2. The PDP satisfies the development standards of the L-M-N zone district set forth
in Division 4.4 of the Land Use Code.
3. The PDP satisfies the applicable General Development Standards of Article 3.
A. The Alternative Compliance design that results in less than 65% of the lots
achieving solar orientation, Section 3.2.3(B), is found to be equal to or
better than a design that would have met the standard.
■ The site street pattern was carefully laid out in grid respecting the
principles of new urbanism.
■ The streets are designed to connect into the developing property to the
north (Lind Farm) and the future school site to the south (Poudre
School District).
LCM\57069.26\440561.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Maple Hill, Phase One, Project Development Plan, #29-OOA
Administrative Hearing Date: April 10, 2003
Page 7
Section 3.6.4 — Transportation Level of Service. Section 3.6.4 requires that the
PDP's transportation system maintain the adopted transportation level of service
standards for motor vehicles, bicycles and pedestrians.
The staff report indicates that a Transportation Impact Study was prepared during the
O.D.P. process which was coordinated with the developer of the adjacent Lind Farm
property for a comprehensive analysis of the entire square mile section. According to
the staff report, "the PDP in collaboration with Lind Farm will feature a consistent street
network" as well as a combination of on -street bike lanes, sidewalks and off-street trails
at mid -block locations and through the large storm water detention pond. There was no
evidence presented to contradict the staff report. Therefore, the Hearing Officer finds
that the transportation system of this project satisfies the Level of Service standards for
all modes of travel.
One resident of the Country Club Heights Subdivision, adjacent to this proposed project,
testified at, the hearing about his concern. for the implementation of a frontage road
along County Road 11 and the possible construction of a sound wall. Mr. Bleicher also
sent a letter to the Hearing Officer dated April 7, 2003 in which he expressed these
same concerns. Mr. Bleicher explains in his letter that the frontage road would enable
existing residents in the Country Club Heights Subdivision limited access to County
Road 11, rather than backing directly out onto the road. Although Mr. Bleicher does not
oppose the Maple Hill project, he would like the name of a contact person at the City to
keep informed about the progress of construction of the frontage road.
Matt Baker, in the City Engineering Department, testified that there will be interim
improvements before the frontage road is built. Mr. Baker acknowledged that the
frontage road will consolidate driveways and allow for better access onto County Road
11. He also testified that the timing of the frontage road is tied to the City's receipt of
development fees. Regarding the request for a sound wall, Mr. Baker stated that the
City standards do not require noise barriers and that noise barriers, in the City's opinion,
often cause more sound. Mr. Baker testified that berming and landscaping will mitigate
traffic noise more effectively than a noise wall. Finally, City Staff offered to provide
Mr. Bleicher with the appropriate staff contacts.
The PDP Complies with the Mountain Vista Subarea Plan.
The Mountain Vista Subarea Plan includes a "Framework Plan." According to this plan,
the vacant area described by the boundaries of Maple Hill is designated as "Low
L C M\57069.264440581.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Maple Hill, Phase One, Project Development Plan, #29-OOA
Administrative Hearing Date: April 10, 2003
Page 6
behind front facades or porches by the requisite minimum of four feet and side -mounted
garages feature windows facing the street.
The Hearing Officer finds that the requirements of subsections (B) and (E) of Section
3.5.2 have been satisfied.
Section 3.6.2 — Streets, Streetscapes. Alleys and Easements. Section 3.6.2(E)(1) of
the Land Use Code requires that "lots having a front or rear lot line that abuts an arterial
street shall have a minimum depth of 150 feet."
According to the staff report, County Road 11, running along the west boundary of the
property, is classified as, a "Minor Arterial' street. The PDP design shows 40 lots
backing up to County Road 11, with lot depths of approximately 99 feet. An alternative
compliance design has been requested to relieve the applicant of the 150 foot lot depth
requirement. Pursuant to Section 3.6.2(E)(1), the Hearing Officer may approve an
alternative lot plan if the plan includes "additional buffering or screening that will, in the
judgment of the decision maker, protect such lots from the noise, light and other
potential negative impacts of the arterial street as well as, or better than, a plan which
complies with the standard of Subsection (E)." According to the PDP, tracts G, H and K
incorporate a landscape buffer yard, which in addition to the 99 foot depth of the lots,
exceeds the required 150 foot depth. As the staff report states, the landscaped buffer
yard will effectively mitigate the impacts of rear lot lines facing a minor arterial street.
Based ' on the evidence set forth in the staff report, specifically the use of landscape
buffer yards, the Hearing Officer finds that the PDP meets the alternative compliance
standard.
Section 3.6.3 — Street Pattern and Connectivity Standards. Section 3.6.3 of the
LUC requires street systems be designed to be safe, efficient and convenient,
considering all modes of transportation. The staff report reflects that the collector and
local street intersections were previously approved as part of the Overall Development
Plan. The PDP also provides for a bicycle and pedestrian path that will become part of
a larger regional trail network linking four developing neighborhoods in the Mountain
Vista area.
The Hearing Officer finds, therefore, that the Project meets the criteria of Section 3.6.3.
LC M\57069.26\440581.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Maple Hill, Phase One, Project Development Plan, #29-OOA
Administrative Hearing Date: April 10, 2003
Page 4
with the five criteria enumerated in Subsection (D)(7), including the park's high visibility,
and its easy access for pedestrians and the public at large.
There was no evidence presented at the hearing to contradict the staff report. The
Hearing Officer finds, therefore, that the PDP complies with the neighborhood park
standards of the L-M-N District.
Development Standards:
Section 4.4(E) — Streets and Blocks. Section 4.4(E)(1)(a) of the Land Use Code
states that the local street system provided by the development shall provide an
interconnected network of streets in a manner that results in blocks of developed land
bounded by connecting streets no greater than twelve (12) acres in size.
The staff report reflects that although one block, Block 20, exceeds the 12 acre block
size, it contains a 13.13-acre stormwater detention pond. The design of the block with
small open space tracts and bicycle path, in staffs opinion, maintains a grid pattern of
streets and therefore complies with the integrity of the requirement. There was no
evidence presented at the hearing to refute this evidence; therefore, the Hearing Officer
finds that the PDP meets this section of the Land Use Code.
The Hearing Officer further finds that the PDP meets the requirement of Section
4.4(E)(1)(b), concerning mid -block pedestrian connections. The requirement provides
that if any block face is over seven hundred (700) feet long, then walkways connecting
to other streets shall be provided at approximately mid -block or at intervals of at least
every six hundred fifty (650) feet, whichever is less. The staff report notes that although
six blocks within the PDP exceed 700 feet, all but one block are considered exempt
from the standard because of the location of the stormwater detention pond and the
outlet ditch. The non-exempt block provides relief in the way of a ten -foot wide
easement featuring a six-foot wide sidewalk that directly connects to the neighborhood
park. There was no evidence presented at the hearing to contradict the staff report.
3. The PDP Complies with General Development Standards (Article 3):
Section 3.2.3 — Solar -Oriented Lots. Section 3.2.3 of the Land Use Code requires
that at least 65% of the lots less than 15,000 square feet in area in single and two family
residential developments must conform to the definition of a "solar -oriented lot" in order
to preserve the potential for solar energy usage. The staff report indicates that only 166
LC M \57069.26\440581.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Maple Hill, Phase One, Project Development Plan, #29-OOA
Administrative Hearing Date: April 10, 2003
Page 3
more than eight dwelling units per gross acre of residential land. The evidence reflects
that on a net acreage basis, the average density for Phase One of Maple Hill is 4.64
d.u.'s/acre, which is below the required five dwelling unit minimum. However, as the
staff report explains, it is expected that with development of the future multi -family
parcel, the residential density for the entire Maple Hill Project will meet or exceed the
required minimum of 5.00 d.u. on a net acreage basis.
The Hearing Officer finds that the density requirements for this Project have been met,
provided the multi -family parcel is developed as proposed.
Section 4.4(D)(2) — Mix of Housing. Section 4.4(D)(2) of the Land Use Code requires
a minimum of three housing types for any project containing 45 acres or more and that
a single housing type shall not constitute more than 90% of the total number of dwelling
units. The staff report reflects that the PDP will offer the required mix of housing types,
including 92 standard lot single family detached dwellings; 357 small lot single family
detached dwellings; and 78 single family attached (duplexes) dwellings. None of the
housing types comprise more than ninety percent of the total number of units. There
was no evidence to refute the staff report; therefore, the Hearing Officer finds that the
PDP complies with Section 4.4(D)(2).
Section 4.4(D)(3) — Neighborhood Center. The staff report indicates that the PDP
complies with the land use standards for a neighborhood center set forth in Section
4.4(D)(3) of the Land Use Code. Specifically, the PDP meets the requirement that at
least 90% of the dwellings in the PDP must be located within '/ of a mile of a
neighborhood center contained within the project since 100% of the lots are within % of
a mile of the proposed neighborhood center. In addition, the staff report reflects that the
neighborhood center is proposed to be one acre in size which meets the five acre
maximum imposed pursuant to Section 4.4(D)(3)(c).
Section 4.4(D)(7) — Small Neighborhood Parks.
Section 4.4(D)(7) requires that this PDP include either a neighborhood park or a
privately owned park, that is at least one (1) acre in size and located within a maximum
of one-third mile of at least ninety (90) percent of the dwellings in the development. As
evidenced by a letter dated April 3, 2003 from Craig Foreman, Manager of Park
Planning and Development for the City of Fort Collins, the City is working with the
developer to purchase approximately 7.16 acres within the development for a public
neighborhood park. The staff report further indicates that the proposed park complies
LCM\57069.26\440581.01
City of Fort Collins — Type 1 Administrative Hearing
Findings, Conclusions, and Decision
Maple Hill, Phase One, Project Development Plan, #29-OOA
Administrative Hearing Date: April 10, 2003
Page 2
E: L-M-N - Vacant (Agriculture)
W: R - Existing Single Family Detached in Unincorporated Larimer County
SUMMARY OF HEARING OFFICER DECISION: Approval.
NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer
established no controversy or facts to refute that the hearing was properly noticed.
PUBLIC HEARING: The Hearing Officer, presiding pursuant to the Fort Collins Land
Use Code, opened the hearing at approximately 5:35 p.m. on April 10, 2003 in the City
Council Chambers, located at 300 West LaPorte Avenue, Fort Collins, Colorado.
RECORD OF HEARING: The Hearing Officer accepted during the hearing the
following evidence: (1) Planning Department Staff Report; (2) application, plans, maps,
and other supporting documents submitted by the applicant and the applicant's agents
to the City of Fort Collins; (3) numerous electronic mail communications and written
correspondence to and from the planning staff, the applicant, and members of the public
concerning the project; and (4) a tape recording of testimony provided during the
hearing. The Fort Collins Land Use Code (LUC), the City's Comprehensive Plan, and
the formally promulgated policies of the City are all considered part of the evidence
considered by the Hearing Officer.
FACTS AND FINDINGS
1. The PDP complies with the Applicable Provisions of Article 2 concerning
Development Applications. The evidence at the hearing indicates that the application
was processed in accordance with Article 2.
2. The PDP Complies with LMN Zone District Standards (Article 4):
Land Use Standards:
Section 4.4(D) — Density. Section 2.3.2(H) of the Land Use Code provides that any
standards relating to housing density and mix of uses shall be applied over the entire
overall development plan, and not on each individual project development plan review.
The evidence presented at the hearing reflects that the proposed density for this PDP,
with the future development of the multi -family parcel, will comply with the minimum and
maximum allowable densities for the LMN zone district. Section 4.4(D) of the Land Use
Code requires that the PDP contain no less than five dwelling units per net acre and no
City of Fort Collins
Commu._.y Planning and Environmental, rvices
Current Planning
CITY OF FORT COLLINS, COLORADO
ADMINISTRATIVE HEARING OFFICER
TYPE 1 ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS, AND DECISION
ADMINISTRATIVE HEARING DATE: April 10, 2003
PROJECT: Maple Hill, Phase One, Project Development
Plan, #29-OOA
APPLICANT: Mr. Mike Sollenberger and Mr. Tom Dougherty
Gillespie Farm Development Company
3937 Harbor Walk Lane
Fort Collins, Colorado.80525
OWNER: Nineteenth Green Partnership
6373 South Grape Court
Littleton,. Colorado 80121
HEARING OFFICER: Linda C. Michow, Esq.
Gorsuch Kirgis LLP
Tower I, Suite 1000
1515 Arapahoe Street
Denver, Colorado 80202
PROJECT DESCRIPTION: The applicant has submitted a Project Development Plan
("PDP") application for 449 single family detached dwelling units and 78 duplexes
located on 136.89 acres at the southwest corner of County Road 11 and Richards Lake
Road, Fort Collins. The PDP is for the first (and largest) phase of development; future.
phases include multi -family on 16.9 acres and a neighborhood center on 1.0 acre. A
neighborhood park, on 7.1.6 acres, is planned for development by the City of Fort Collins
at some point in the future. The site is bounded by the Poudre School District property
on the south, the Number Eight Outlet Ditch on the east, and the Lind Farm (Centex
Homes) on the north.
The parcel is located within the Mountain Vista Area Plan adopted by City Council in
March of 1999. The 160-acre Gillespie Farm Overall Development Plan was approved
in February of 2001 and amended in October of 2002.
ZONE DISTRICT: The property is zoned L-M-N, Low Density Mixed -Use Residential.
The surrounding zoning and land uses are as follows:
N: L-M-N - Vacant (Under Development by Centex Homes)
S: L-M-N - Vacant (Poudre School District Future School Site)
LCM\57069.264440581. o 1