HomeMy WebLinkAboutREDWOOD APARTMENTS - PDP - 15-99A - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYeke Rv
1
era. Sr
Hickory St
Sltka
'
onifer St
Hemioc.k St
0
jv
SITE
I
M
in S
-.,.. ...............................
......
..
ar............
�
..........:...........................
....................._,.
.........E
vine Gr'' .:
Vine
.Q
St
ar
a)
L
O
y
C
erry
SI
a
iq
....�
Ma
le S
✓
.in ar
rn
N C
J
C
j'
y
a Poe
Ave
y o
Sr•...'
E Lincoln Ave
��
m
_ 1
m
un Ave
z z
o
n
;t
ga
E 0
St
............................
Dev Rd1
A hR AA
Ccpvngnl O t 988-t 997. Microsoft Corporation anwor its suppliers All rights reserved Please wish our web site at http Umaps exped,a Co.
2
Figure 1
VICINITY MAP
List of Figures
Figure1
Vicinity Map...............................................................................................2
Figure 2
Current Roadway Geometry ......................................................................5
Figure 3
Current Peak Hour Traffic.........................................................................7
Figure4
Concept Plan...........................................................................................10
Figure 5
Short- and Long -Term Site Traffic Distribution........................................12
Figure 6
Short- and Long -Term Site Traffic...........................................................13
Figure 7
Short -Term Background Traffic...............................................................15
Figure 8
Long -Term Background Traffic................................................................16
Figure 9
Short -Term Total Traffic..........................................................................17
Figure 10
Long -Term Total Traffic...........................................................................18
Figure 11
Long -Term Roadway Geometry ..............................................................24
I
Table of Contents
I.
INTRODUCTION...............................................................................................1
II.
AGENCY DISCUSSIONS..................................................................................3
III.
EXISTING CONDITIONS..................................................................................4
A.
I'
Existing Road Network......................................................................................
4
B.
Surrounding Land Uses.....................................................................................6
C.
Existing Traffic...................................................................................................6
D.
Existing Traffic Operations................................................................................6
IV.
DEVELOPMENT ISSUES.................................................................................9
A.
Project Description............................................................................................
9
B.
Site Traffic..........................................................................................I..............9
C.
Trip Distribution...............................................................................................11
V.
FUTURE CONDITIONS..................................................................................11
A.
Roadway Improvements..................................................................................11
B.
Short -Term Background Traffic Volumes.........................................................14
C.
Long -Term Background Traffic Volumes.........................................................14
' VI.
TRAFFIC IMPACTS........................................................................................14
A..
Auxiliary Lane Requirements...........................................................................19
B.
Other Roadway Improvements........................................................................19
:. C.
Short -Term Operating Conditions....................................................................20
D.
Long -Term Operating Conditions....................................................................
23
VII.
PEDESTRIAN FACILITIES..............................................................................27
A.
Existing Conditions..........................................................................................27
B.
Planned Improvements....................................................................................
27
C.
Levels-of-Service.................................................................
............................28
VIII.
BICYCLE FACILITIES ... :.................................................................................
28
A.
Existing Conditions..........................................................................................28
B.
�i
Planned Improvements....................................................................................28
C.
Levels of Service.............................................................................................
29
IX.
TRANSIT.........................................................................................................29
A.
Existing Conditions..........................................................................................29
B.
Planned Improvements....................................................................................29
C.
Levels of Service.............................................................................................
30
X.
CONCLUSIONS..............................................................................................
31
n
Transportation Impact Study
REDWOOD APARTMENTS
Fort Collins, Colorado
Prepared For:
Concorde Capital
1349 E. Broad Street
Columbus, OH 43205
Prepared By:
Eugene G. Coppola
P. 0. Box 260027
Littleton, CO 80127
303-792-2450
October 11, 1999