Page 5 of 5
angles or radial to the street. The design does not impact the layout of roads,
driveways, utilities, drainage facilities and other services necessary to serve the
Project.
B. Section 3.3.1 [C] (1) - Public Sites, Reservations, and Dedications
The plat indicates the proper dedication for street right-of-way, and drainage and
utility easements as needed to serve the Project.
MMARY OF CONCLUSIONS
A. The Maple Hill, First Replat Project Development Plan is subject to administrative
review and the requirements of the Land Use Code (LUC).
B. The Maple Hill, First Replat Project Development Plan complies with the
Mountain Vista Subarea Plan.
C. The Maple Hill, First Replat Project Development Plan is consistent with the
Gillespie Farm Overall Development Plan.
D. The Maple Hill, First Replat Project Development Plan satisfies the development
standards of the LMN zoning district.
E. The Maple Hill, First Replat Project Development Plan complies with all
applicable General Development Standards, including the Plat Standards,
contained in Article 3 of the Land Use Code.
DECISION
The Maple Hill, First Replat Project Development Plan, #29-OOC, is hereby approved by
the Hearing Officer without condition.
Dated this 9th day of March 2004, per authority granted by Sections
1.4.9(E) and 2.1 of the Land Use Code.
/Cameron Gloss
C Current Planning Director
Maple Hill, 1st Replat
Administrative Hearing
Findings, Conclusions, and Decision
March 2, 2004
Page 4 of 5
on County Road 11. The property owner immediately to the south of the subject
property also relayed concerns about the anticipated or feared impacts of the
proposed replat on the roadway aligning with Country Club Rd along the south
property line of the Maple Hill PDP. The Staff noted that a recorded easement
shown on the Maple Hill plat indicates that the road will be located within this
easement on Poudre School District property and off -set to the north
approximately 10 feet.
Although the Hearing Officer finds that the neighboring property could potentially
be impacted by a future roadway, this particular issue is a private matter that has
no relevance to the requested replat. The proposed replat must be judged under
the existing applicable regulations of the City of Fort Collins Land Use Code.
These regulations provide sufficient specificity to determine that the Applicant
and Owner have designed the PDP in conformance with the applicable
regulations and there is no authority for the Hearing Officer to mandate that the
Applicant or Owner exceed the minimum requirements.
2. Compliance with Article 4 and the LMN Zoning District Standards:
The plat complies with the standards found under Article Four of the Land Use
Code. The applicant's request to replat the block, in order to create two
additional lots and an alley, complies with the following standards:
A. Section 4.4(D) — Land Use Standards
The PDP will comply with the minimum density requirement of the zoning district
when additional units are constructed under the approved Gillespie Farm ODP.
The proposed lots are less than 6,000 square feet in area, therefore, constituting
"small lot single family". This housing type remains below the maximum
percentage of 90% within the project.
There was no evidence introduced at the hearing to contradict the Staff Report;
therefore, the Hearing Officer finds that the Subdivision is in conformance with
the applicable requirements found in Article 4 of the Land Use Code.
3. Compliance with Article 3 of the Land Use Code — General Development
Standards
A. Section 3.3.1 [B] — Lots
The proposed lots comply with the design standards in that each lot has
vehicular access to a public street, and the side lot lines are at substantially right
Maple Hill, 1st Replat
Administrative Hearing
Findings, Conclusions, and Decision
March 2, 2004
Page 3 of 5
FACTS AND FINDINGS
Site Context
The surrounding zoning and land uses are as follows:
N: L-M-N; Vacant (Lind Property -Under Development by Centex Homes)
S: L-M-N; Vacant (Poudre School District Future School Site)
E: L-M-N; Vacant (Irrigated Agriculture)
W: R; Existing Single Family Detached in Unincorporated Larimer County
The Maple Hill project is part of a larger 320-acre parcel that was annexed in
1978. Also in 1978, on the Maple Hill parcel, the Nineteenth Green Subdivision
was approved consisting of 58 single-family lots on 28.9 acres. Although this
subdivision was approved and recorded, it expired due to lack of activity in the
mid-1980's.
The parcel is located within the Mountain Vista Area Plan adopted by City
Council in March of 1999. The 160-acre Gillespie Farm Overall Development
Plan was approved in February of 2001 and amended in October of 2002.
The original Maple Hill subdivision was approved on September 9, 2003. This
approved project represents the first and largest phase of a residential
subdivision that is located on 136.89 acres at the southeast corner of County
Road 11 (soon to re -named Turnberry Road) and Richards Lake Road.
The approved plan includes 449 single family detached dwelling units and 78
duplex dwelling units for a total of 527 dwelling units. The project sets aside 7.16
acres for a neighborhood park that will be developed by the City of Fort Collins at
some point in the future. An off-street bicycle/pedestrian path will be provided.
Future phases include multi -family on 16.90 acres and a neighborhood center on
1.00 acre. The site is bounded by the Poudre School District property on the
south, the Number Eight Outlet Ditch on the east, and the Lind Farm (Centex
Homes) on the north. County Road 11 (soon to be re -named Turnberry Road)
forms the western boundary.
Testimony was offered at the hearing by two neighboring residential landowners.
One owner, speaking as a representative to the adjacent Country Club Heights
subdivision, submitted a letter into the record that summarized the
neighborhood's lack of specific comments regarding the requested replat. In his
testimony, he reiterated the neighborhood's support for construction of a frontage
road to help mitigate the adverse perceived adverse impacts to houses fronting
Maple Hill, 1st Replat
Administrative Hearing
Findings, Conclusions, and Decision
March 2, 2004
Page 2 of 5
NOTICE OF PUBLIC HEARING: Evidence presented to the Hearing Officer established
no controversy or facts to refute that the hearing was
properly posted, legal notices mailed and notice
published.
PUBLIC HEARING
The Hearing Officer, presiding pursuant to the Fort Collins Land Use Code, opened the
hearing at approximately 4:30 PM on March 2, 2004 in Conference Room A at 281 N.
College Avenue, Fort Collins, Colorado.
HEARING TESTIMONY, WRITTEN COMMENTS AND OTHER EVIDENCE:
The Hearing Officer accepted during the hearing the following evidence: (1) Planning
Department Staff Report; (2) application, plans, maps and other supporting documents
submitted by the applicant and the applicant's representatives to the City of Fort Collins;
and (3) a tape recording of testimony provided during the hearing. The LUC, the City's
Comprehensive Plan (City Plan), and the formally promulgated policies of the City are
all considered part of the evidence considered by the Hearing Officer.
The following is a list of those who attended the meeting:
From the City:
Ted Shepard, Chief Planner
Dave Stringer, Development Review Engineering Supervisor
From the Applicant:
Mike Sollenberger, Gillespie Farm Development Company
From the Public:
Joseph W. Bleiker, 2509 N. County Rd. 11
Ken Forbes, 1900 N. County Rd. 11
Written Comments:
Letter from Joseph W. Bleicker to Cameron Gloss dated March 2, 2004
Commu. y Planning and Environmental _rvices
Current Planning
Citv of Fort Collins
CITY OF FORT COLLINS
ADMINISTRATIVE HEARING OFFICER
TYPE I ADMINISTRATIVE HEARING
FINDINGS, CONCLUSIONS AND DECISION
ADMINISTRATIVE HEARING DATE: March 2, 2004
PROJECT NAME:
XTRI Qkql11111l►Tt1:1=1:41
APPLICANTS:
OWNER:
HEARING OFFICER:
PROJECT DESCRIPTION:
Maple Hill, First Replat
29-OOC
Mike Sollenberger and Tom Dougherty
Gillespie Farm Development Company
3937 Harbor Walk Lane
Fort Collins, CO 80525
Nineteenth Green Partnership
6373 South Grape Court
Littleton, CO 80121
Cameron Gloss
Current Planning Director
The Applicants have submitted a request to replat Block 26 of Maple Hill by adding an
alley and two lots. The site is located within the Maple Hill Subdivision. The block is
surrounded by Bar Harbor Drive, Sunbury Lane, Clearfield Way and Summerpark Lane.
Maple Hill is a 137-acre residential neighborhood located at the northeast corner of
Country Club Road (extended) and County Road 11.
SUMMARY OF HEARING OFFICER DECISION: Approval
ZONING DISTRICT: Low Density Mixed Use Neighborhood- L-M-N.
STAFF RECOMMENDATION: Approval