HomeMy WebLinkAboutMAPLE HILL 1ST REPLAT - PDP - 29-00C - CORRESPONDENCE -Be sure and return all of your redlined plans when you re -submit.
If you have any questions regarding these issues or any other issues related to this
project, please feel free to call me at (970) 221-6750.
City Planner
Page 2
� Aw„ STAFF PROJECT REVIEW
Cilvof Fort Collins
0
VF RIPLEY Date: 2/11/2004
LOUISE HERBERT
401 W. MOUNTAIN
FT. COLLINS, CO 80521
Staff has reviewed your submittal for MAPLE HILL 1ST REPLAT - TYPE I (LUC),
and we offer the following comments:
ISSUES:
Department: Engineering Issue Contact: Dave Stringer
Topic: General
Number: 3 Created: 1 /30/2004
[1/30/04] Ready for hearing. See redline blue lines need to show corner cut in right-
of-way of alley as depicted on detail 7-12F.
Number: 4 Created: 1 /30/2004
[1/30/04] Need to provide more detail with Final Compliance Plans. See red line
blue lines, show existing utilities as existing and/or make reference to what plans
they are to be constructed with.
Number: 5 Created: 1 /30/2004
[1/30/04] Provide cross section of alley type being proposed for construction.
Department: Natural Resources Issue Contact: Doug Moore
Topic: General
Number: 2 Created: 1 /30/2004
[1/30/04] No issues.
Department: Stormwater Utility Issue Contact: Basil Harridan
Topic: General
Number: 6 Created: 2/10/2004
[2/10/04] Need to provide a complete set of plans to be revised as other sheets that
are affected by this replat are not shown.
Number: 7 Created: 2/10/2004
[2/10104] Please provide drainage calculations showing that therunoff amounts
generated by the impervious areas assumed for the basins covered by the replat
with the original design will remain within acceptable limits after the replat.
Department: Zoning
Topic: ZONING
Number: 1
[1/23/04] NO COMMENTS
Issue Contact: Jenny Nuckols
Created: 1 /23/2004
Page 1