Loading...
HomeMy WebLinkAboutMAPLE HILL 1ST REPLAT - PDP - 29-00C - CORRESPONDENCE -Be sure and return all of your redlined plans when you re -submit. If you have any questions regarding these issues or any other issues related to this project, please feel free to call me at (970) 221-6750. City Planner Page 2 � Aw„ STAFF PROJECT REVIEW Cilvof Fort Collins 0 VF RIPLEY Date: 2/11/2004 LOUISE HERBERT 401 W. MOUNTAIN FT. COLLINS, CO 80521 Staff has reviewed your submittal for MAPLE HILL 1ST REPLAT - TYPE I (LUC), and we offer the following comments: ISSUES: Department: Engineering Issue Contact: Dave Stringer Topic: General Number: 3 Created: 1 /30/2004 [1/30/04] Ready for hearing. See redline blue lines need to show corner cut in right- of-way of alley as depicted on detail 7-12F. Number: 4 Created: 1 /30/2004 [1/30/04] Need to provide more detail with Final Compliance Plans. See red line blue lines, show existing utilities as existing and/or make reference to what plans they are to be constructed with. Number: 5 Created: 1 /30/2004 [1/30/04] Provide cross section of alley type being proposed for construction. Department: Natural Resources Issue Contact: Doug Moore Topic: General Number: 2 Created: 1 /30/2004 [1/30/04] No issues. Department: Stormwater Utility Issue Contact: Basil Harridan Topic: General Number: 6 Created: 2/10/2004 [2/10/04] Need to provide a complete set of plans to be revised as other sheets that are affected by this replat are not shown. Number: 7 Created: 2/10/2004 [2/10104] Please provide drainage calculations showing that therunoff amounts generated by the impervious areas assumed for the basins covered by the replat with the original design will remain within acceptable limits after the replat. Department: Zoning Topic: ZONING Number: 1 [1/23/04] NO COMMENTS Issue Contact: Jenny Nuckols Created: 1 /23/2004 Page 1