Loading...
HomeMy WebLinkAboutREDWOOD APARTMENTS - PDP - 15-99A - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTtreet cross sections schematics (if not included in the utility plans (8 copies)). (folded) of applicable conceptual letter and explanation of how issues have been addressed. egal description of the site (one copy on 8'/z x 11" sheet). IC Name and,XWress of each, owner of property within the boundaries of the development plan area. C? ["Jest . of names of all general and limited partners and/or officers involve as either applicants or owners. C, evelopment phasing schedule A" C Njoigned letters of intent indicated that all required off -site easement and off -site rights -of - way can be negotiated in time for final development plan submittal. � vretii 6a%adIb2 • he Revised 10/20/99 R AW+W46 Submittal Checklist Project Development Plan The following information is required to be submitted, unless waived, with all applications. Any item waived must be dated and initialed by a planner with the City of Fort Collins Current Planning Department. Cc- V00%,"-_Ipplication form and filing fee (plus .50 cents for each APO label). (� 1i� r� C, hree lists (3) of names and addresses of all owners of record of real property within at least500' of the property lines for the parcel of land for which the project is proposed, exclusive of public right-of-way. (Two (2) lists typed on mailing labels (33 names per sheet) and the other list on a reproducible copy of those labels.) Site plan drawings (30 copies). (Refer to the submittal requirements, which outline information to be presented on the site plan.) 24"x36" (folded) Subdivision Plat (23 copies). (folded) elevations (6 copies). (folded) Cmej v6\44 nG) Landscape Plan (20 copies). (Refer to the submittal requirements, which outline information to be presented on the landscape plan.) (folded) nt of planning objectives (26 copies). transportation Impact Analysis (TIA) (6 copies) ��tilit plans (existing and proposed utility systems) 13 copies). unfolded YP ( 9 P P Y Y )( P� )•( ) `I XDrainage and erosion control report (4 copies). `oils Report (2'copies) Su3MT 82 - Ntw 12CP6ti, w-r H t ontext Diagram (5 copies) (folded) ghting Plans (5 copies) (folded) -Jo ro,jr O MI'2.r L,Y-)f-rT1A-'6s Revised 10/20/99