Comment Number: 11 Comment Originated: 12/29/2016
12/29/2016: Building 4 and 10 can be serviced off of the hydrant lateral.
Technically this will become another water main. A valve will need to be added
a few feet east of the hydrant. The water main for these services can stay
6-inches due to it servicing just two buildings.
Comment Number: 12 Comment Originated: 12/29/2016
12/29/2016: The water services under the garden area need to be relocated
due to the planter boxes. Also, please provide a detail of the garden area.
Comment Number: 13 Comment Originated: 12/29/2016
12/29/2016: The east -west sewer main needs to be 8-inches in diameter.
Comment Number: 14 Comment Originated: 12/29/2016
12/29/2016: Please provide a 1-1/2 inch water meter detail and remove the
1-inch detail if not being used.
Comment Number: 15 Comment Originated: 12/29/2016
12/29/2016: Please provide the spacing requirements for water meters and
landscaping.
Comment Number: 16 Comment Originated: 12/29/2016
12/29/2016: Please see redlines for other minor comments.
Department: Zoning
Contact: Marcus Glasgow, 970-416-2338, mglasgow@fcqov.com
Topic: General
Comment Number: 1 Comment Originated: 11/15/2016
11/15/2016: No comments
12/29/2016: The storm sewer ouffall from the detention pond is in conflict with a
couple existing water lines. The City is discussing the best option for these
conflicts.
Comment Number: 19 Comment Originated: 12/29/2016
12/29/2016: Please see other comments on the redlined Utility Plans.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Landscape Plans
Comment Number: 3
12/27/2016: This has not been corrected.
11/16/2016: There are text over text issues. See redlines.
Comment Number: 4
12/27/2016: This has not been corrected.
11/16/2016: There are line over text issues. See redlines.
Topic: Plat
Comment Originated: 11/16/2016
Comment Originated: 11/16/2016
Comment Number: 11 Comment Originated: 12/27/2016
12/27/2016: Please remove the extra "period" in Note #8 on sheet 1. See
redlines.
Comment Number: 12 Comment Originated: 12/27/2016
12/27/2016: There are line over text issues. See redlines.
Comment Number: 13 Comment Originated:
12/27/2016
12/27/2016: There is an error on the right of way width of Horsetooth Road
shown on sheet 2. See redlines.
Comment Number: 14 Comment Originated:
12/27/2016
12/27/2016: Please add the note "See Sheet 4 for Drainage & Public Access
Easement details. See redlines.
Comment Number: 15 Comment Originated:
12/27/2016
12/27/2016: Please add easement widths as marked to the Utility Easement
Detail. See redlines.
Comment Number: 16 Comment Originated:
12/27/2016
12/27/2016: Please make changes to the Public Access Easement Detail as
marked.
Comment Number: 17 Comment Originated:
12/27/2016
12/27/2016: Please add a detail for the area marked on the Drainage
Easement Detail. See redlines.
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-6820, nhahn@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/15/2016
12/27/16: Please see redlines.
11/15/2016: Traffic signing and striping plans will need to be included in the
final plan set. Redlines have been provided on the site plan.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, ischlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 11/01/2016
12/27/2016: Please submit; an Erosion Control Plan (Based upon redlines)and
an Escrow / Security Calculation (Update based on changes to the plan and
reevaluate the cost of every IP, as sub drain IP may not cost as much as Area
Inlet Drains or Open Throat). The erosion control report was acceptable. If you
need clarification concerning the erosion control section, or if there are any
questions please contact Jesse Schlam 970-218-2932 or email
jschlam@fcgov.com
11/01/2016: Please submit; an Erosion Control Plan (Based upon redlines),
an Erosion Control Report (based upon comments), and an Escrow / Security
Calculation (Updated based on changes to the plan and reevaluate the cost of
every IP, as sub drain IP may not cost as much as Area Inlet Drains or Open
Throat). If you need clarification concerning the erosion control section, or if
there are any questions please contact Jesse Schlam 970-218-2932 or email
jschlam@fcgov.com
Contact: Wes Lamarque, 970-416-2418, wlamargue@fcgov.com
Topic: General
Comment Number: 8
Comment Originated: 11/21/2016
12/29/2016: Repeat Comment.
11/21/2016: Please use the City's standard detail for the pond outlet structure.
It is understood that no extended detention will be required or provided, so no
WQ orifices should be included. Please call me if you have any questions.
Comment Number: 10 Comment Originated: 11/21/2016
12/29/2016: Please document in the Drainage Report that the ponding depth is
within the bottom aggregate layer.
11/21/2016: The City does not normally allow outfall to be in a sump condition.
More discussion is required for the LID outfall and see if the sump can be
eliminated or reduced.
Comment Number: 12
Comment Originated: 11/21/2016
12/29/2016: This needs to have permanent erosion protection as well.
11/21/2016: Erosion protection is needed for the downside of the weir out of
LID basin 3.
Comment Number: 13 Comment Originated: 11/21/2016
12/29/2016: Did not locate the riprap detail.
11/21/2016: Temporary erosion control is needed for the buried rip -rap
sections
Comment Number: 16 Comment Originated: 12/29/2016
12/29/2016: The culvert at the north end of the site is labeled as 12 and 15
inches in different places. Please clarify.
Comment Number: 17
Comment Originated: 12/29/2016
12/29/2016: Please provide a detail for the pipe out protection. Permanent
erosion control fabric is preferred over riprap.
Comment Number: 18 Comment Originated: 12/29/2016
Contact: Jim Lynxwiler, 970-416-2869, Ilynxwiler@poudre-fire.org
Topic: General
Comment Number: 7
12/27/2016: KNOX PADLOCK
The gate will require a Knox Padlock.
Comment Number: 8
Comment Originated: 12/27/2016
Comment Originated: 12/27/2016
12/27/2016: FIRE LANE SIGNAGE
> Gate will require a No Parking - Fire Lane sign affixed to both sides so as to
face north and south.
> Adjust No Parking - Fire Lane sign locations per PFA red -lines (provided).
Comment Number: 9 Comment Originated: 12/27/2016
12/27/2016: EMERGENCY ACCESS EASEMENT
For clarity, the EAE should match the full width of the private drive (flow line to
flow line) at the connection to W Horsetooth Rd.
Comment Number: 10 Comment Originated: 12/27/2016
12/27/2016: PREMISE IDENTIFICATION & WAYFINDING
If the private drive will not be named, a plan for wayfinding will need to be
submitted for review and approval prior to FDP approval. Monument signage
will be required. Code language provided below.
> IFC 505.1: New and existing buildings shall have approved address numbers,
building numbers or approved building identification placed in a position that is
plainly legible, visible from the street or road fronting the property, and posted
with a minimum of six-inch numerals on a contrasting background. Where
access is by means of a private road and the building cannot be viewed from
the public way, a monument, pole or other sign or means shall be used to
identify the structure.
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickev@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 11/16/2016
12/28/2016: The connection to Birmingham Dr. shown on the site plan
addresses most of Planning's issues. With that being said, it looks like the
connection will be flush with the existing street. With the rollover curb shown next
to the drive aisle on the site, does this mean the drive aisle will be higher than
the bike/ped plaza? Also, have you coordinated with the property owners
adjacent to the project site? It looks like they will lose on -street parking with this
solution.
11/16/2016: Thank you for providing more detail on the bike and pedestrian
connection at Birmingham Dr. How will the existing sidewalks on Birmingham
Dr. transition to the connection shown on the site plan?
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 12/28/2016
12/28/2016: Some of the plants in the northeast and northwest portions of the
site are missing labels with leader lines. Please add these to the plan.
sides of the light is required between canopy trees and streetlights. A 15'
separation on both sides of the light is required between ornamental trees and
streetlights.
Comment Number: 5 Comment Originated: 11/16/2016
11/16/2016: Contact Luke Unruh with questions at 970-416-2727
Department: Outside Agencies
Contact: Clay Frickey, 970-224-60459 cfrickey@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 11/17/2016
11 /17/2016: Comment from Real Estate Services:
Ownership is still showing City of Fort Collins - this must be signed by Housing
Catalyst (under contract to buy). City cannot sign the plat nor grant easements.
Department: Park Planning
Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 11/16/2016
12/27/2016: Carry over from the previous round. On the plat, it would be
beneficial to expand the Access Easement in the NE corner of the site to allow
the trail to cross the ditch to the east in the future. Extending the access
easement to the east property line in the NE corner of the site, for a distance
approximately 50-60' south of the north property line, should allow for a future
connection.
11/16/2016: The trail horizontal alignment in the northeast corner of the site (the
turn from paralleling the ditch to paralleling the north property line) should
accommodate a 4% centerline radius to accommodate construction and
maintenance vehicles. The regional trail system is maintained by the Parks
Department, requiring access.
Comment Number: 5 Comment Originated: 11/16/2016
11/16/2016: According to the 2013 Paved Recreational Trail Master Plan the
paved trail surface should be a minimum of 104 wide. Level shoulders on each
side are suggested to be 34 wide, with side slopes from the shoulder edge to
the edge of easement at a maximum of 3:1 but preferably flatter. Specific
construction specifications (material, etc) can be found in the Trail Master Plan
(fcgov.com/parkplanning/pdf/2013-paved-recreational-trail-master-plan-3-3-14.
pdf) . A soft (gravel) path parallel to the paved path is preferred for the regional
trail system, but due to site constraints the soft path can be deleted for this
project.
Comment Number: 6 Comment Originated: 11/16/2016
11/16/2016: Please contact Suzanne Bassinger with any further questions
about the trail connection. She can be reached via e-mail a
sbassinger@fcgov.com or by phone at 970.416.4340.
Department: PFA
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi -family and Condominiums 3 stories max: 2012 IECC residential
chapter.
3. Commercial and Multi -family 4 stories and taller: 2012 IECC commercial
chapter.
Village on Horsetooth — project specific concerns:
1. Most multi -family buildings require full NFPA 13 fire -sprinkler systems. 13-R
systems only allowed in 2 story 6 unit buildings.
2. For single exit buildings, bedroom egress windows required below 4th floor
for 1 exit buildings.
3. All windows above the 1 st floor require minimum sill height of 24"
4. Building code and State statute CRS 9-5 requires project provide accessible
units.
5. Upgraded insulation is required for buildings using electric heat or cooling.
6. Exterior walls and roof must meet a STC (sound resistance) rating of 40 min.
if building located within 1000ft to train tracks.
7. Low -flow Watersense plumbing fixtures (toilet, faucets, shower heads) are
required.
8. Special combustion safety requirements for natural draft gas appliances.
9. Low VOC interior finishes.
City of Fort Collins
Building Services
Plan Review
416-2341
Department: Light And Power
Contact: Luke Unruh, 9704162724, Iunruh@fcgov.com
Topic: General
Comment Number: 1
Comment Originated: 11/15/2016
Transformers must be within 10' of an asphalt/concrete surface. Some of the
transformers seem to be further than 10'.
Comment Number: 2
Comment Originated: 11/16/2016
11/16/2016: Reminder:
Please provide a one line diagram and a C-1 form for each building to Light
and Power Engineering. L&P limits the number of conductors to no more than 7
parallel runs of no larger than 350kcmil. The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1 Form.pdf
Comment Number: 3 Comment Originated: 11/16/2016
11/16/2016: The utility easement shown on the utility plan is not shown on the
plat.
Comment Number: 4 Comment Originated: 11/16/2016
11/16/2016: Reminder:
Two streetlights will be placed along Horsetooth. A 40 feet separation on both
staking plants to mark them so they are not forgotten or mowed over.
Comment Number: 8 Comment Originated: 12/28/2016
12/28/2016: Lighting plan looks good. Thank you for working to accommodate
requests associated with International Dark -Sky Association recommendations
and request by City Planning.
Comment Number: 9
Comment Originated: 12/28/2016
12/28/2016: A weed management plan will need to be submitted to be
included as an Exhibit in the DA. Securities for installation and monitoring for
the Natural habitat Buffer Zone (NHBZ) to be estimated and provided before
issuance of Development Construction Permit (DCP).
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1
Comment Originated: 11/03/2016
11 /03/2016:
Building Permit Pre -Submittal Meeting:
Pre -Submittal meetings are required to assist the designer/builder by assuring,
early on in the design,
that the new commercial or multi -family projects are on track to complying with
all of the adopted City
codes and Standards listed below. The proposed project should be in the early
to mid -design stage for
this meeting to be effective and is typically scheduled after the Current Planning
conceptual review
meeting. Applicants of new commercial or multi -family projects are advised to
call 416-2341 to schedule
a pre -submittal meeting. Applicants should be prepared to present site plans,
floor plans, and elevations
and be able to discuss code issues of occupancy, square footage and type of
construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
City of
Fort Collins
./10'�
December 30, 2016
Kristin Fritz
Fort Collins Housing Authority
1715 W Mountain Ave
Fort Collins, CO 80521
RE: Village on Horsetooth, FDP160044, Round Number 2
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 . fax
fcgov. com/developmentreview
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Clay Frickey, at 970-224-6045 or cfrickey@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Katie Andrews, 970-221-65019 kandrews@fcgov.com
Topic: General
Comment Number: 2
Comment Originated: 11/15/2016
12/27/2016: Engineering is waiting on the revised Birmingham design.
11/15/2016: Off site Birmingham improvement design sheets should be
included in the Village on Horsetooth FDP utility plan set because the
improvements will be constructed with this project.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290,
Topic: General
Comment Number: 7
sblochowiak@fcgov.com
Comment Originated: 12/28/2016
12/28/2016: Thank you for responding to all Environmental Planning comments
and massaging site plan, planting plan, and construction plan details. Good
design, implementation and management should lead to successful
implementation of site landscape planning. Shrub species selection looks
good. May have difficulty sourcing yellow mountain willow (Salix monticola) as
willows are usually planted from cuttings; this species is found usually at higher
elevations and not so much at about 5000 ft in Fort Collins. Suggest peachleaf